  2105   Thursday, June 18, 2020, 09:11 Travis CaveITWStandard OperationTM2Graphite #1Module move TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station.
  
  2106   Thursday, June 18, 2020, 13:22 David WangITWStandard OperationTM2C#1Remove of TM2 from ITE to SHC.Remotely remove TM2 from ITW to SHC. The
move is good.  Shielding plug is put
back to ITW. 
  
  2110   Thursday, June 25, 2020, 09:45 Travis CaveITWStandard OperationTM2Graphite #1Module move TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station.
  
  2112   Friday, June 26, 2020, 15:00 David WangITWMaintenance  ITW TP1 and TP1S.ITW TP1 can not be started yesterday. Also,
TP1S was difficult to start , and had a high
current draw after.  We changed both
  
  2115   Friday, July 03, 2020, 06:57 David WangITWStandard OperationTM2C#1TM2 CONNECTION CHECKLIST SEE ATTACHMENTS. EVERYTHING IS GOOD.  TM2_C#1_CONNECTION_CHECKLIST.pdf 
  2121   Monday, July 06, 2020, 12:20 David WangITWStandard OperationTM2C#1Five shielding blocks to ITWFive shielding blocks are transferred to
ITW
  
  2130   Wednesday, July 29, 2020, 09:20 Travis CaveITWMaintenance  Entrance module move The West Entrance module has been
moved from the south hot cell back to the
West Target Station.
  
  2131   Thursday, July 30, 2020, 09:57 Travis CaveITWStandard OperationTM2Graphite #1Module move TM#2 with Graphite #1 has been moved
back to the west target station from the
conditioning station.
  
  2133   Tuesday, August 18, 2020, 09:06 David WangITWStandard OperationTM2 TM2 and ITW entrance module have been disconnected in ITWTm2 and itw entrance module have been disconnected
in ITW. I will attach disconnection checklist
later. 
  
  2136   Monday, August 24, 2020, 10:11 Adam NewsomeITWStandard Operation  Entrance Module to ITWEntrance Module was moved from South Hot
Cell to ITW Station.
Note: weight of entrance module,
  
  2143   Tuesday, September 08, 2020, 10:37 Travis CaveITWStandard Operation no targetEntrance module move The West Entrance module has been
moved to the south hot cell for repairs.
  
  2144   Friday, September 11, 2020, 11:25 Travis CaveITWStandard OperationTM2Ta#60Module move Both the west entrance module and
TM#2 with Ta#60 have been moved back into
ITW.
  
  2155   Friday, October 16, 2020, 10:36 Travis CaveITWStandard OperationTM2Ta#60Module move TM#2 with Ta#60 is now in the south
hot cell.
  
  2157   Tuesday, October 20, 2020, 10:14 Travis CaveITWStandard OperationTM2C#2Module move TM#2 with C#2 has been moved from
the south hot cell to the West Target Station.
  
  2168   Tuesday, November 24, 2020, 09:37 Adam NewsomeITWStandard OperationTM2 Module MoveTM2 has been moved from
the Conditioning Station to ITW. 
  
  2169   Tuesday, November 24, 2020, 12:56 David WangITWStandard OperationTM2Nb#9TM2 has been connected in ITWTM2 has been connected to ITW. Turbo pumps
are stared. ITW pumping down is fine so far.
 TM2_Nb#9_module_connection_checklist.pdf 
  2178   Monday, January 18, 2021, 12:29 David WangITWStandard OperationTM2Nb#9ITW vacuum and TM2 water lines leak check .ITW primary and secondary vacuum vessel
leak check are done. There is a 5XE-8 atm.cc/sec
leak on Exit service cap NW side square panel. 
  
  2182   Monday, January 25, 2021, 12:33 David WangITWStandard Operation  ITW bias HV testRamp up ITW bias to 57KV. no spark. 200uA
leaking current at 57KV. The test is done
without target module in station.  
  
  2194   Thursday, March 04, 2021, 11:20 David WangITWMaintenance  ITW water flow wheels and coils replacement.ITW water flow wheels and coils are replaced.
Wheels and coils on Oven, Tube, HS, EE, MSP,
Febiad coil, containment box window, dump,dump
  
  2229   Tuesday, June 22, 2021, 15:35 David WangITWStandard OperationTM2UCX33#TM2 has been connected it ITW. TM2 has been connected it ITW.  All
turbo pumps are started. 
  