  2110   Thursday, June 25, 2020, 09:45 Travis CaveITWStandard OperationTM2Graphite #1Module move

 TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station.

  2112   Friday, June 26, 2020, 15:00 David WangITWMaintenance  ITW TP1 and TP1S.

ITW TP1 can not be started yesterday. Also, TP1S was difficult to start , and had a high current draw after.  We changed both of them in pit today. TP1 and TP1S are started successfully after replacement.

  2115   Friday, July 03, 2020, 06:57 David WangITWStandard OperationTM2C#1TM2 CONNECTION CHECKLIST

SEE ATTACHMENTS. EVERYTHING IS GOOD.

Attachment 1: TM2_C#1_CONNECTION_CHECKLIST.pdf
TM2_C#1_CONNECTION_CHECKLIST.pdf TM2_C#1_CONNECTION_CHECKLIST.pdf TM2_C#1_CONNECTION_CHECKLIST.pdf TM2_C#1_CONNECTION_CHECKLIST.pdf
  2121   Monday, July 06, 2020, 12:20 David WangITWStandard OperationTM2C#1Five shielding blocks to ITW

Five shielding blocks are transferred to ITW

  2130   Wednesday, July 29, 2020, 09:20 Travis CaveITWMaintenance  Entrance module move

 The West Entrance module has been moved from the south hot cell back to the West Target Station.

  2131   Thursday, July 30, 2020, 09:57 Travis CaveITWStandard OperationTM2Graphite #1Module move

 TM#2 with Graphite #1 has been moved back to the west target station from the conditioning station.

  2133   Tuesday, August 18, 2020, 09:06 David WangITWStandard OperationTM2 TM2 and ITW entrance module have been disconnected in ITW

Tm2 and itw entrance module have been disconnected in ITW. I will attach disconnection checklist later.

  2136   Monday, August 24, 2020, 10:11 Adam NewsomeITWStandard Operation  Entrance Module to ITW

Entrance Module was moved from South Hot Cell to ITW Station.

Note: weight of entrance module, as shown via overhead crane's load cell, is 14,900 lbs.

  2143   Tuesday, September 08, 2020, 10:37 Travis CaveITWStandard Operation no targetEntrance module move

 The West Entrance module has been moved to the south hot cell for repairs.

  2144   Friday, September 11, 2020, 11:25 Travis CaveITWStandard OperationTM2Ta#60Module move

 Both the west entrance module and TM#2 with Ta#60 have been moved back into ITW.

  2155   Friday, October 16, 2020, 10:36 Travis CaveITWStandard OperationTM2Ta#60Module move

 TM#2 with Ta#60 is now in the south hot cell.

  2157   Tuesday, October 20, 2020, 10:14 Travis CaveITWStandard OperationTM2C#2Module move

 TM#2 with C#2 has been moved from the south hot cell to the West Target Station.

  2168   Tuesday, November 24, 2020, 09:37 Adam NewsomeITWStandard OperationTM2 Module Move

TM2 has been moved from the Conditioning Station to ITW. 

  2169   Tuesday, November 24, 2020, 12:56 David WangITWStandard OperationTM2Nb#9TM2 has been connected in ITW

TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far.

Attachment 1: TM2_Nb#9_module_connection_checklist.pdf
TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf
  2178   Monday, January 18, 2021, 12:29 David WangITWStandard OperationTM2Nb#9ITW vacuum and TM2 water lines leak check .

ITW primary and secondary vacuum vessel leak check are done. There is a 5XE-8 atm.cc/sec leak on Exit service cap NW side square panel.  The leak is small. And, it is close to ITW TP3 so it is not affect ion beam line vacuum during operation. We will replace the seal on the panel later.   The rest leak check on air to vacuum seals are good. TM2 water lines are pressurized with 70 psi helium. We did it  3 hours after water lines are purged. No leak was showed during the check.

2021-02-24th: The o-ring on exit 1 NW side square panel is replaced by David Wang and Frank Song. 

  2182   Monday, January 25, 2021, 12:33 David WangITWStandard Operation  ITW bias HV test

Ramp up ITW bias to 57KV. no spark. 200uA leaking current at 57KV. The test is done without target module in station.   ITW water circuits are looped in pit.  EE , EL are switched off during the test. 

  2194   Thursday, March 04, 2021, 11:20 David WangITWMaintenance  ITW water flow wheels and coils replacement.

ITW water flow wheels and coils are replaced. Wheels and coils on Oven, Tube, HS, EE, MSP, Febiad coil, containment box window, dump,dump plug, 2A window, and tank return circuits are replaced with new parts.

  2229   Tuesday, June 22, 2021, 15:35 David WangITWStandard OperationTM2UCX33#TM2 has been connected it ITW.

TM2 has been connected it ITW.  All turbo pumps are started.

  2242   Thursday, August 12, 2021, 14:13 Adam NewsomeITWRepair  West Entrance Module Move to ITW

The West Entrance Module has been moved from the South Hot Cell to the West Target Station.

  2251   Monday, September 27, 2021, 14:29 Travis CaveITWStandard OperationTM2Graphite #3Module move

 TM#2 with C#3 has been moved from the north hot cell to ITW. Also for the up coming site wide power outage, the ISAC Target Hall crane has been turned off and powered down, also the remote crane console has also been power down as well so that mean no ISAC TV for a few days.