Entry  Friday, June 08, 2018, 11:36, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Source Tray Removal Progress TM2_06082018.jpg
The containment box has been removed from TM2, the Enzel lens and steerers disconnected and optics tray removal has commenced.
Entry  Friday, June 08, 2018, 14:24, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 
 TM#2 has been moved from the conditioning station to the south hot cell.
Entry  Monday, June 11, 2018, 11:30, chad fisher, South Hot-Cell, Repair, TM2, , TM2 containment box on 
Tm2 containment box has been re-installed onto TM2.
Entry  Tuesday, June 12, 2018, 11:26, chad fisher, South Hot-Cell, Repair, TM2, , TM4 Optics Tray fh.jpg
I have "slung" the TM4 optics tray in preparation for its removal.
Entry  Wednesday, June 27, 2018, 14:56, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 
 TM2 has been moved from the silo to the south hot cell.
Entry  Friday, June 29, 2018, 10:15, chad fisher, South Hot-Cell, Standard Operation, TM2, , TM2 work and target install 
On Thursday, June 29th the containment box of TM2 was removed and the optics tray re-installed and reconnected. The box was then re-installed.
Friday the window waterlines were leak checked, Nb target installed (with new fasteners, high current torqued to 130 in*lbs) target leak and electrical
checked and containment box cover installed with new fasteners.
Entry  Friday, June 29, 2018, 13:36, Travis Cave, South Hot-Cell, Standard Operation, TM2, Nb#8, Electrical Check TM2_elec_chk_steerers_and_lens_062818.pdfTM2_Nb8_elec_chk_shc.pdfTM2_notgt_elec_chk_shc_062918.pdf
 The results of the various electrical checks performed on the TM#2 with and without the Nb#8 target attached.
Entry  Tuesday, July 03, 2018, 09:57, Travis Cave, ITW, Standard Operation, TM2, Nb#8, Module move 
 TM#2 with Nb#8 has been moved from the south hot cell to the west target station.
Entry  Tuesday, July 03, 2018, 14:42, David Wang, ITW, Standard Operation, TM2, Nb#8, TM2 has been connected to ITW. Nb#4_Module_connection_checklist.pdf
TM2 has been connected to ITW. All turbo pumps are started. See attachment for connection checklist.
Entry  Wednesday, July 11, 2018, 15:06, Anders Mjos, ITW, Standard Operation, TM2, Nb#8, Block move 
Maico and Travis moved blocks from ITE to ITW yesterday
Entry  Wednesday, July 11, 2018, 15:09, Anders Mjos, ITW, Maintenance, TM2, Nb#8, Uncovered ITW to toubleshoot 2A2M19 
The 2A2M19 beam profile monitor did not work and was e-faulted.
After initial troubleshooting 2 blocks were removed form ITW to inspect the entrance module where the beam monitor is installed. The cable was found not
to be connected and was quickly fixed. Blocks reinstalled. The work was done by Maico, Travis and Anders
Entry  Wednesday, July 25, 2018, 13:21, Anders Mjos, ITW, Repair, TM2, Nb#8, Leak check of ITW Entrance_Module_Leak_2018-07-25.docx
ITW Entrance Module was leak checked yesterday with the support of Vacuum Group (Dimo & Edi). The leak detector was connected to primary backing
vacuum line. A leak response was found near the bellow for the beam profile monitor on top of the Entrance Module. It could be confirmed today by actuating
the monitor, that the leak was indeed at that location. The plan is to move the TM and Entrance Module out for target exchange and repair, respectively.
Entry  Tuesday, July 31, 2018, 10:20, Travis Cave, South Hot-Cell, Standard Operation, TM2, Nb#8, Module move 
 TM#2 with Nb#8 has been moved from ITW to the south hot cell.
Entry  Wednesday, August 01, 2018, 14:48, Travis Cave, Conditioning Station, Standard Operation, TM2, UC#23, Spent Target Move 
 TM#2 with UC#23 has been moved from the south hot cell to the conditioning station.
Entry  Wednesday, August 01, 2018, 15:12, Anders Mjos, South Hot-Cell, Standard Operation, TM2, UC#23, Target mounted - water leak on HS line 20180801_180130904_iOS.jpg
The heat shield water lines were not purged ahead of target exchange  in the hot cell. This resulted in water leaking onto the new target  assembly (heat
shield) when the cooling lines were opened at top and  bottom (for connecting leak detector). Excess water was wiped up with  paper towels.
Entry  Tuesday, August 14, 2018, 10:27, Travis Cave, ITW, Standard Operation, TM2, UC#23, Module move 
 Both the West Entrance and TM#2 with UC#23 have been moved back into their places in the west target station. The Entrance module move wasn't completely
smooth as it did suffer a little bumpiness when the shield plug part was installed, I was lifted back out again and no visible damage was observed on the
delicate items.
Entry  Monday, August 20, 2018, 09:55, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#56 and UC#23, Electrical Check Electrical_Check_TM4_Ta56_SHC.pdfElectrical_Check_TM2_UC23_CS.pdfElectrical_Check_TM2_UC23_SHC.pdf
 Electrical Checks of the last two targets Ta#56 and UC#23
Entry  Tuesday, September 18, 2018, 12:59, Travis Cave, South Hot-Cell, Standard Operation, TM2, UC#23, Module move 
 TM#2 with UC#23 has been moved from ITW to the south hot cell. The shield plug was also installed remotely as well.
Entry  Thursday, September 20, 2018, 08:36, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check Electrical_Chk_TM2_no_tgt_Sept-20-2018.pdf
 Results of the electrical check on TM#2 with no target after Chad cleaned out the bolt hole on the module where the target mounts.
Entry  Thursday, September 20, 2018, 14:35, Travis Cave, South Hot-Cell, Standard Operation, TM2, nSiC#1, Electrical Check Electrical_Chk_TM2_SHC_nSiC#1_Sept-20-2018.pdf
 TM#2 with the nSiC#1 target had its check done on it at the south hot cell see attached for results.