  1691   Tuesday, March 06, 2018, 09:53 David WangITWStandard OperationTM2 Tm2 and Tm4 vacuum disconnectionThe job is done. See attachment.  TM2_TM4_disconnection_Vacuum.pdf 
  1692   Wednesday, March 07, 2018, 10:18 David WangITWStandard Operation  Oil leak on target station vacuum primary back pump.I can not see oil in sight window of the
primary pump during visual inspection. The
aluminum tray underneath the pump is filled
  
  1694   Thursday, March 08, 2018, 14:10 David WangITWMaintenance  Two small water leak has been found in ITW. Two small water leaks have been found on
ITW High active water system.  One is from
an unused 1/4" copper valve stem. another
  
  1696   Thursday, April 05, 2018, 11:29 David WangITWMaintenance  ITH MP1 replacementITH MP1 is replaced today with a new style
pump.The new pump is 0.75 inch higher than 
old pump on inlet and exhaust so a new solid
  
  1697   Monday, April 09, 2018, 06:36 David WangITWStandard Operation  ITW Turbo -pumps switch offI asked MCR to switch off ITW TP3,4 TP1s,2s
this morning.
  
  1701   Tuesday, April 17, 2018, 11:05 David WangITWRepair  Disconnect ITW entrance moduleITW entrance module has been disconnected. 
All connections are labelled before or during
disconnection. The 24VDC electrical plug
  
  1702   Thursday, April 19, 2018, 10:27 Travis CaveITWMaintenance  Entrance module move The west entrance module has been
moved from the west target station to the
silo.
  
  1703   Friday, April 20, 2018, 15:33 Keith C NgITWRepair  ITW beam tube repair job2A2 window has been removed from ITW and
beamlines has removed the beamtube from the
penetration. The penetration has been sealed
 20180420_2a2beamtuberepair_P1040034.JPG20180420_2a2beamtuberepair_P1040030.JPG20180420_2a2beamtuberepair_P1040029.JPG20180420_2a2beamtuberepair_P1040036.JPG 
  1704   Friday, April 27, 2018, 15:06 Keith C NgITWRepair  ITW beam tube repairVacuumed out remainder of debris from the
wall penetration, removed cradle and checked
condition. Down stream support bracket sees
 6x 
  1705   Tuesday, May 01, 2018, 10:54 Keith C NgITWRepair  2a2 window installation and beamtube repairYesterday
we installed the 2a2 window, the drive screw
was torqued until 70 ft-lbs and we stopped,
 20180420_2a2beamtuberepair_P1040025.JPG2018_2a2window00017.jpg 
  1710   Friday, May 04, 2018, 11:21 David WangITWRepair  2A2 winodw leak check in THAnders and I leak checked new 2A2 window
seal on ITW side. Leak detector was connected 
to ITW TP4.  Base  leak rate 0.0Xe-9
  
  1712   Wednesday, May 09, 2018, 08:48 David WangITWRepair  2A2 winodw leak check on ITW vacuum vessel.Leak detector is connected to ITW TP4.
LD Base leak rate 0.0XE-09 atm.cc/sec. Helium
line is connected to existing window leak
  
  1716   Thursday, May 17, 2018, 13:17 Travis CaveITWStandard Operation  Entrance module move The west entrance module has been
moved from the silo to the west target station.
  
  1748   Tuesday, July 03, 2018, 09:57 Travis CaveITWStandard OperationTM2Nb#8Module move TM#2 with Nb#8 has been moved from
the south hot cell to the west target station.
  
  1749   Tuesday, July 03, 2018, 14:38 David WangITWStandard Operation  ITW water signals interlock check.Annual ITW water signals interlock check
are done. Everything works good.
  
  1750   Tuesday, July 03, 2018, 14:42 David WangITWStandard OperationTM2Nb#8TM2 has been connected to ITW.TM2 has been connected to ITW. All turbo
pumps are started. See attachment for connection
checklist.
 Nb#4_Module_connection_checklist.pdf 
  1751   Wednesday, July 11, 2018, 15:06 Anders MjosITWStandard OperationTM2Nb#8Block moveMaico and Travis moved blocks from ITE
to ITW yesterday
  
  1752   Wednesday, July 11, 2018, 15:09 Anders MjosITWMaintenanceTM2Nb#8Uncovered ITW to toubleshoot 2A2M19The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were
  
  1758   Wednesday, July 25, 2018, 13:21 Anders MjosITWRepairTM2Nb#8Leak check of ITWITW Entrance Module was leak checked yesterday
with the support of Vacuum Group (Dimo &
Edi). The leak detector was connected to
 Entrance_Module_Leak_2018-07-25.docx 
  1767   Tuesday, August 14, 2018, 10:27 Travis CaveITWStandard OperationTM2UC#23Module move Both the West Entrance and TM#2 with
UC#23 have been moved back into their places
in the west target station. The Entrance
  