1691
|
Tuesday, March 06, 2018, 09:53 |
David Wang | ITW | Standard Operation | TM2 | | Tm2 and Tm4 vacuum disconnection | The job is done. See attachment. |
|
1692
|
Wednesday, March 07, 2018, 10:18 |
David Wang | ITW | Standard Operation | | | Oil leak on target station vacuum primary back pump. | I can not see oil in sight window of the
primary pump during visual inspection. The
aluminum tray underneath the pump is filled |
|
1694
|
Thursday, March 08, 2018, 14:10 |
David Wang | ITW | Maintenance | | | Two small water leak has been found in ITW. | Two small water leaks have been found on
ITW High active water system. One is from
an unused 1/4" copper valve stem. another |
|
1696
|
Thursday, April 05, 2018, 11:29 |
David Wang | ITW | Maintenance | | | ITH MP1 replacement | ITH MP1 is replaced today with a new style
pump.The new pump is 0.75 inch higher than
old pump on inlet and exhaust so a new solid |
|
1697
|
Monday, April 09, 2018, 06:36 |
David Wang | ITW | Standard Operation | | | ITW Turbo -pumps switch off | I asked MCR to switch off ITW TP3,4 TP1s,2s
this morning. |
|
1701
|
Tuesday, April 17, 2018, 11:05 |
David Wang | ITW | Repair | | | Disconnect ITW entrance module | ITW entrance module has been disconnected.
All connections are labelled before or during
disconnection. The 24VDC electrical plug |
|
1702
|
Thursday, April 19, 2018, 10:27 |
Travis Cave | ITW | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
silo. |
|
1703
|
Friday, April 20, 2018, 15:33 |
Keith C Ng | ITW | Repair | | | ITW beam tube repair job | 2A2 window has been removed from ITW and
beamlines has removed the beamtube from the
penetration. The penetration has been sealed |
   |
1704
|
Friday, April 27, 2018, 15:06 |
Keith C Ng | ITW | Repair | | | ITW beam tube repair | Vacuumed out remainder of debris from the
wall penetration, removed cradle and checked
condition. Down stream support bracket sees |
6x |
1705
|
Tuesday, May 01, 2018, 10:54 |
Keith C Ng | ITW | Repair | | | 2a2 window installation and beamtube repair | Yesterday
we installed the 2a2 window, the drive screw
was torqued until 70 ft-lbs and we stopped, |
 |
1710
|
Friday, May 04, 2018, 11:21 |
David Wang | ITW | Repair | | | 2A2 winodw leak check in TH | Anders and I leak checked new 2A2 window
seal on ITW side. Leak detector was connected
to ITW TP4. Base leak rate 0.0Xe-9 |
|
1712
|
Wednesday, May 09, 2018, 08:48 |
David Wang | ITW | Repair | | | 2A2 winodw leak check on ITW vacuum vessel. | Leak detector is connected to ITW TP4.
LD Base leak rate 0.0XE-09 atm.cc/sec. Helium
line is connected to existing window leak |
|
1716
|
Thursday, May 17, 2018, 13:17 |
Travis Cave | ITW | Standard Operation | | | Entrance module move | The west entrance module has been
moved from the silo to the west target station. |
|
1748
|
Tuesday, July 03, 2018, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | Nb#8 | Module move | TM#2 with Nb#8 has been moved from
the south hot cell to the west target station. |
|
1749
|
Tuesday, July 03, 2018, 14:38 |
David Wang | ITW | Standard Operation | | | ITW water signals interlock check. | Annual ITW water signals interlock check
are done. Everything works good. |
|
1750
|
Tuesday, July 03, 2018, 14:42 |
David Wang | ITW | Standard Operation | TM2 | Nb#8 | TM2 has been connected to ITW. | TM2 has been connected to ITW. All turbo
pumps are started. See attachment for connection
checklist. |
|
1751
|
Wednesday, July 11, 2018, 15:06 |
Anders Mjos | ITW | Standard Operation | TM2 | Nb#8 | Block move | Maico and Travis moved blocks from ITE
to ITW yesterday |
|
1752
|
Wednesday, July 11, 2018, 15:09 |
Anders Mjos | ITW | Maintenance | TM2 | Nb#8 | Uncovered ITW to toubleshoot 2A2M19 | The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were |
|
1758
|
Wednesday, July 25, 2018, 13:21 |
Anders Mjos | ITW | Repair | TM2 | Nb#8 | Leak check of ITW | ITW Entrance Module was leak checked yesterday
with the support of Vacuum Group (Dimo &
Edi). The leak detector was connected to |
|
1767
|
Tuesday, August 14, 2018, 10:27 |
Travis Cave | ITW | Standard Operation | TM2 | UC#23 | Module move | Both the West Entrance and TM#2 with
UC#23 have been moved back into their places
in the west target station. The Entrance |
|