  591   Tuesday, February 04, 2014, 08:04 David WangSouth Hot-CellRepairTM2 Leak check TM2 tube heater (+) water line.Chad and I leak checked TM2 tube heater(+)
water line yesterday afternoon. The water
line was difficult to pump down on base leak
 IMG_0012.JPGIMG_0013.JPG 
  592   Tuesday, February 04, 2014, 09:42 David WangSouth Hot-CellRepairTM2 pressure test on TM2 tube heater +(D) water line.Chad and I did a pressure test on TM2 tube
Heater+(D) water line.I pressurized the D
line with shop air from quick connectors(both
 10x 
  593   Wednesday, February 05, 2014, 14:05 David WangSouth Hot-CellRepairTM2 Leak check TM2 tube heater (+) water line from inside service cap in TH.Bevan and I did a leak check on TM2 tube
heater+ from inside service cap in TH. The
leak detector base leak rate 0.0xE-9 atm.cc/sec,
 005.JPG008.JPG005.JPG 
  597   Thursday, February 13, 2014, 09:24 David WangSouth Hot-CellRepairTM2 Leak check TM2 tube heater (+) water line with rubber insert blocked WB in SHCChad and I  did the Leak checked TM2
tube heater (+) water line  with rubber
insert plugged water block on " D" 
 001.JPG002.JPG003.JPG004.JPG 
  598   Thursday, February 13, 2014, 13:30 David WangSouth Hot-CellRepairTM2 pressure test on TM2 tube heater +(D) water line.Chad and I did the pressure test on TM2tube
heater+(D) water  line at SHC with shop
air.We tested from 30psi to 80psi on both
  
  599   Thursday, February 13, 2014, 14:15 David WangSouth Hot-CellRepairTM2 pressure test on TM2 tube heater +(D) water line.

    

       
            
 007.JPG008.JPG013.JPG 
  600   Thursday, February 13, 2014, 14:23 David WangSouth Hot-CellRepairTM2 Leak check on TM2 tube heater (+) water line with blank off(elastic seal) installed on WB.Chad and I did the leak check on TM2 tube
heater (+) water line  with blank off(
+ elastic o ring seal) installed on "D" 
 005.JPG001.JPG 
  601   Monday, February 17, 2014, 09:32 David WangConditioning StationRepairTM2 helium pressure test on TM2 tube heater +(D) water line.I did the helium pressure test on Tube
heater+ line this morning. The  vacuum on
CS and TM2 are very good. The base lake rate
 6x 
  602   Tuesday, February 18, 2014, 11:26 David WangConditioning StationRepairTM2 I stopped turbo pumps and disconnected vacuum system on TM 2 and CSI stopped turbo pumps and disconnected
vacuum system on TM2 and CS. The TM2 will
be moved to SHC for C seal installation on
  
  608   Tuesday, February 25, 2014, 06:53 David WangSouth Hot-CellRepairTM2 Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.Chad and I did the leak check   on
TM2 tube heater (+) water line  with
blank off and C-seal  installed on 
  
  609   Tuesday, February 25, 2014, 10:00 David WangConditioning StationRepairTM2 helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.I did the helium pressure  test 
on TM2 tube heater (+) water line  with
blank off(C-seal) installed on  water
 10x 
  612   Thursday, March 06, 2014, 06:28 David WangConditioning StationMaintenanceTM1 TM1 had been moved from silo to CSTM1 has been successfully moved from silo
to CS. The CS vacuum system is connected 
to TM1. Turbo pumps on TM1 and CS have been
  
  613   Thursday, March 06, 2014, 06:58 David WangITEMaintenanceTM3 ITE vacuum and leak check on ITE BL2A window flange.ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low
  
  614   Thursday, March 06, 2014, 12:59 David WangConditioning StationMaintenanceTM1 Restart TM1 and CS TPs Restarted TM1 and CS turbo pumps after
the power off. Everything is fine .
  
  615   Thursday, March 06, 2014, 14:12 David WangConditioning StationStandard OperationTM1 TM1 air to vacuum and water lines leak check at CS.TM1 air to vacuum and water lines leak
check at CS are finished this afternoon.
The leak detector  is hooked directly
 8x 
  616   Friday, March 07, 2014, 12:45 David WangITEStandard OperationTM3 TM3 and ITE air to vacuum leak check and TM3 water lines helium test.With TM3 located in ITE, All air to vacuum
seals  on ITE primary and secondary
vacuum vessel have been leak  checked
 001.JPG002.JPG003.JPG010.JPG013.JPG 
  621   Thursday, March 13, 2014, 07:35 David WangITWStandard OperationTM4 TM4 and ITW turbo pumps have been startedI connected ITW  vacuum system to
TM4. TM4 and ITW turbo pumps have been started
successfully. The pumping down is good so
  
  625   Wednesday, March 19, 2014, 15:46 David WangITWStandard OperationTM4 TM4 and ITE air to vacuum leak check and TM4 water lines helium test.With TM4 located in ITW, All air to vacuum
seals  on ITW primary and  secondary
vacuum vessels have been leak  checked
 7x 
  632   Wednesday, March 26, 2014, 06:57 David WangSouth Hot-CellStandard OperationTM4Ta#42Leak check on TM4 HS water line with new Ta #42 target.Chad and I leak checked TM4 HS line with
Ta#42 target on the module. The leak detector
base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4
  
  644   Wednesday, April 09, 2014, 11:10 David WangSouth Hot-CellStandard OperationTM3 TM3 heat shield circuit leack check at SHCThis Monday morning, Chad and I leak checked
heat shielding circuit on TM3 with new target
installed. The base LR on LD :0.0xE-9 atm.cc/sec,
  