1861
|
Tuesday, January 22, 2019, 09:56 |
David Wang | ITW | Maintenance | TM2 | | ITW water system maintenance. |
ITW water system maintenance is done. All working paddle wheels and coils are replaced. ITW water system polyurethane tubes are replaced as well. Two 3/8" leak small valves on return lines are replaced. 85 liters of tritium water are transferred from storage tank to B2 level holding tank. LALC water are refilled into S-tank. Restarted pump and checked system. Everything works fine now. No water leak has been found so far. |
|
1862
|
Thursday, January 24, 2019, 10:34 |
David Wang | ITW | Maintenance | | | Changed 24VDC plugs of TP solenoid valves in ITW |
3 damaged 24VDC plugs of TP solenoid valves are replaced. Inspected other plugs. All of them are in good condition now. |
|
1919
|
Monday, May 13, 2019, 09:55 |
Travis Cave | ITW | Standard Operation | | | Entrance module move |
The West Entrance module has been moved from the south hot cell to the west target station. |
|
1920
|
Monday, May 13, 2019, 11:22 |
David Wang | ITW | Repair | | | ITW entrance module has been connnected. |
Entrance module has been connected back to ITW. Everything is normal. |
|
1982
|
Tuesday, September 10, 2019, 10:10 |
Adam Newsome | ITW | Standard Operation | TM4 | UC#27 | TM4 Move |
TM4 has been moved from the Conditioning Station to ITW with UC#27 target. |
|
1983
|
Tuesday, September 10, 2019, 14:04 |
David Wang | ITW | Standard Operation | | | ITW water interlock check. |
ITW water interlock check is finished. Everything is good. |
|
1984
|
Thursday, September 12, 2019, 09:26 |
David Wang | ITW | Repair | TM4 | | ITW bad vacuum issue and trouble shoot. |
ITW secondary vacuum was bad in last two days after TM4 was connected in ITW. Today when check the exit 2 module, I found a small needle valve on exit 2 module top was slightly opened for some reason in past months. The valve is closed . ITW vacuum is returned to normal status. |
|
1985
|
Friday, September 13, 2019, 13:36 |
David Wang | ITW | Standard Operation | TM4 | UCX27 | TM4 conenction in ITW checklist |
TM4 was connected in ITW this Tuesday. See attachment for checklist. |
Attachment 1: TM4_UCx27_connection_checklist.pdf
|
|
|
2011
|
Wednesday, October 23, 2019, 06:56 |
David Wang | ITW | Standard Operation | TM4 | UCX 28 | TM4 UCx 28 disconnection checklist |
TM4 was disconnected in ITW. See checklist. |
Attachment 1: UCx_28_disonnection_CL.pdf
|
|
|
2013
|
Thursday, October 24, 2019, 14:11 |
Travis Cave | ITW | Standard Operation | TM4 | UC#29 | Module move |
TM#4 with UC29 has been moved from the south hot cell to the west target station. |
|
2018
|
Wednesday, October 30, 2019, 11:18 |
David Wang | ITW | Standard Operation | TM4 | UCx 29 | UCx 29 connection checklist |
See attachment |
Attachment 1: UCx_29_connection_checklist.pdf
|
|
|
2042
|
Tuesday, January 07, 2020, 09:37 |
David Wang | ITW | Standard Operation | | | 5 shielding blocks are moved out of ITW top. |
5 shielding blocks are moved out of itw top. |
|
2051
|
Friday, January 24, 2020, 08:19 |
David Wang | ITW | Standard Operation | TM4 | | ITW water signal interlock check. |
ITW water signal interlock check is done. Everything works fine. ITW 2A2 tank water signal is broken and is not ok on XT2A2 page. I will fix it next week. |
|
2054
|
Thursday, January 30, 2020, 10:22 |
David Wang | ITW | Standard Operation | TM4 | | TM4 water lines helium pressure leak check. |
TM4 internal water lines helium pressure leak check at ITW : 70psi helium 5 minutes on each circuits. Base leak rate 0.0X E-9 atm.cc/sec. Base pressure 0.0X E-4torr. Only B line(Oven -) has a tiny 1.5Xe-9 atm.cc/sec response on LD during the check . All others all perfect good. |
|
2055
|
Thursday, January 30, 2020, 12:06 |
David Wang | ITW | Standard Operation | TM4 | | ITW primary and secondary vacuum seals leak check. |
Connected LD to ITW(TM4) TP1. Base LR 0.0Xe-9 atm.cc/sec. Base pressure 0.0Xe-4 torr. All ITW primary and secondary air to vacuum seals are helium spray checked. There is a 5XE-9 atm.cc/sec leak on exit2 module top cover plate o-ring seal. The location is on west side, south corner of the plate. Hi- vacuum resin are sprayed to leak area, and leak checked again. The leak is gone. The other seals on ITW vacuum vessel are good.
|
|
2056
|
Monday, February 03, 2020, 09:10 |
David Wang | ITW | Standard Operation | TM4 | | ITW TPs are switched off. started of ITW argon venting. |
ITW is argon venting now.
Argon venting of ITW is done. It took about 4.0 to 4.5 hours to vent the ITW with 2-3 psi argon. The CG4 and CG4S showed 35 to 36 torr on epic page when mechanical gauge is 760torr in electrical. Argon gas bottle is closed in electrical room. |
|
2057
|
Monday, February 03, 2020, 09:14 |
David Wang | ITW | Standard Operation | TM4 | UCx 29 | TM4 UCx 29 disconnection checklist |
TM4 has been disconnected in ITW. See attachment checklist. |
Attachment 1: UCx29__disconnection_checklist.pdf
|
|
|
2095
|
Friday, May 22, 2020, 13:26 |
David Wang | ITW | Repair | | | ITW water leak. |
A water leak was found on a fitting connecting ITW dump return line pressure gauge on top of exit module. TM tank flange, o-ring slot and o-ring were contaminated by water and water rust. Frank and I cleaned the flange and o-ring slot . We changed a new TM tank o-ring, vacuumed around other 3 module flanges. The leak fittings with pressure gauges were removed . I put a blind cap on removed fitting spot.. Water are switched back to ITW. No leak on blind cap. |
Attachment 1: itw_water_leak_001.JPG
|
|
Attachment 2: itw_water_leak_005.JPG
|
|
Attachment 3: itw_water_leak_009.JPG
|
|
Attachment 4: itw_water_leak_013.JPG
|
|
|
2105
|
Thursday, June 18, 2020, 09:11 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move |
TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station. |
|
2106
|
Thursday, June 18, 2020, 13:22 |
David Wang | ITW | Standard Operation | TM2 | C#1 | Remove of TM2 from ITE to SHC. |
Remotely remove TM2 from ITW to SHC. The move is good. Shielding plug is put back to ITW. |