Tuesday, October 03, 2017, 09:29, Travis Cave, ITW, Standard Operation, TM2, Ta#54, Module move
Tuesday, November 07, 2017, 10:11, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#54, Module move
Thursday, November 09, 2017, 09:34, David Wang, Conditioning Station, Standard Operation, TM2, Ta#55, Leak check on TM2 HS line at SHC and TCS.
Thursday, November 09, 2017, 09:35, David Wang, Conditioning Station, Standard Operation, TM2, Ta#55, TM2 has been connected at TCS
Thursday, November 09, 2017, 10:39, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#55, Conditioning Ta#55
Monday, November 13, 2017, 13:39, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#54 and #55, Electrical Check
Tuesday, November 14, 2017, 10:01, Travis Cave, ITW, Standard Operation, TM2, Ta#55, Module move
Tuesday, November 14, 2017, 14:34, David Wang, ITW, Standard Operation, TM2, Ta#55, TM2 has been connected in ITW.
Wednesday, December 13, 2017, 15:32, Anders Mjos, Assembly/Bench Test, Maintenance, TM2, , Source Tray inspection
Friday, December 22, 2017, 11:09, Anders Mjos, ITW, Standard Operation, TM2, , Shut down High Active Cooling water
Tuesday, January 16, 2018, 10:36, Anders Mjos, Spent Target Vault, Standard Operation, TM2, , Old TM2 Source Tray moved to Cyclotron basement
Tuesday, February 13, 2018, 13:56, Anders Mjos, ITW, Standard Operation, TM2, Ta#55, Target module disconnected
Wednesday, February 14, 2018, 10:06, Anders Mjos, ITW, Maintenance, TM2, , Replaced parker couplings on Window cooling line
Friday, February 16, 2018, 13:46, Anders Mjos, ITW, Maintenance, TM2, , Parker coupling inspection
Tuesday, March 06, 2018, 09:53, David Wang, ITW, Standard Operation, TM2, , Tm2 and Tm4 vacuum disconnection
Monday, April 09, 2018, 09:57, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#55, Module move
Thursday, May 24, 2018, 15:19, Keith C Ng, Assembly/Bench Test, Repair, TM2, , tm 2 source tray build
Friday, May 25, 2018, 11:41, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move
Wednesday, May 30, 2018, 09:51, David Wang, Conditioning Station, Repair, TM2, , TM2 water lines helium pressure test at TCS.
Wednesday, May 30, 2018, 09:55, David Wang, Conditioning Station, Repair, TM2, , TM2 and TCS vacuum pumps are switched off.