ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1691   Tuesday, March 06, 2018, 09:53 David WangITWStandard OperationTM2 Tm2 and Tm4 vacuum disconnectionThe job is done. See attachment.  TM2_TM4_disconnection_Vacuum.pdf 
  1698   Monday, April 09, 2018, 09:57 Travis CaveSouth Hot-CellStandard OperationTM2Ta#55Module move TM#2 with Ta#55 has been moved from
the west target station to the south hot
cell.
  
  1723   Thursday, May 24, 2018, 15:19 Keith C NgAssembly/Bench TestRepairTM2 tm 2 source tray buildAttached alignment check notes after brazing
and fabrication.
First page lower half shows establishment
 20180524_alignmentcheckresults.pdf 
  1724   Friday, May 25, 2018, 11:41 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule moveTM#2 has been moved from the south hot
cell to the conditioning station.
  
  1726   Wednesday, May 30, 2018, 09:51 David WangConditioning StationRepairTM2 TM2 water lines helium pressure test at TCS.I did a helium pressure test on  TM2 water
lines at TCS. We will remove the TM2 source
tray soon so this  test is a reference check
  
  1727   Wednesday, May 30, 2018, 09:55 David WangConditioning StationRepairTM2 TM2 and TCS vacuum pumps are switched off.I switched off TM2 and TCS vacuum pumps.
The TCS and TM2 will be under vacuum without
pumping.
  
  1733   Friday, June 08, 2018, 11:36 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray Removal ProgressThe containment box has been removed from
TM2, the Enzel lens and steerers disconnected
and optics tray removal has commenced.
 TM2_06082018.jpg 
  1734   Friday, June 08, 2018, 14:24 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 has been moved from the conditioning
station to the south hot cell.
  
  1735   Monday, June 11, 2018, 11:30 chad fisherSouth Hot-CellRepairTM2 TM2 containment box onTm2 containment box has been re-installed
onto TM2.
  
  1736   Tuesday, June 12, 2018, 11:26 chad fisherSouth Hot-CellRepairTM2 TM4 Optics TrayI have "slung" the TM4 optics
tray in preparation for its removal.
 fh.jpg 
  1743   Wednesday, June 27, 2018, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM2 has been moved from the silo
to the south hot cell.
  
  1745   Friday, June 29, 2018, 10:15 chad fisherSouth Hot-CellStandard OperationTM2 TM2 work and target installOn Thursday, June 29th the containment
box of TM2 was removed and the optics tray
re-installed and reconnected. The box was
  
  1747   Friday, June 29, 2018, 13:36 Travis CaveSouth Hot-CellStandard OperationTM2Nb#8Electrical Check The results of the various electrical
checks performed on the TM#2 with and without
the Nb#8 target attached.
 TM2_elec_chk_steerers_and_lens_062818.pdfTM2_Nb8_elec_chk_shc.pdfTM2_notgt_elec_chk_shc_062918.pdf 
  1748   Tuesday, July 03, 2018, 09:57 Travis CaveITWStandard OperationTM2Nb#8Module move TM#2 with Nb#8 has been moved from
the south hot cell to the west target station.
  
  1750   Tuesday, July 03, 2018, 14:42 David WangITWStandard OperationTM2Nb#8TM2 has been connected to ITW.TM2 has been connected to ITW. All turbo
pumps are started. See attachment for connection
checklist.
 Nb#4_Module_connection_checklist.pdf 
  1751   Wednesday, July 11, 2018, 15:06 Anders MjosITWStandard OperationTM2Nb#8Block moveMaico and Travis moved blocks from ITE
to ITW yesterday
  
  1752   Wednesday, July 11, 2018, 15:09 Anders MjosITWMaintenanceTM2Nb#8Uncovered ITW to toubleshoot 2A2M19The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were
  
  1758   Wednesday, July 25, 2018, 13:21 Anders MjosITWRepairTM2Nb#8Leak check of ITWITW Entrance Module was leak checked yesterday
with the support of Vacuum Group (Dimo &
Edi). The leak detector was connected to
 Entrance_Module_Leak_2018-07-25.docx 
  1759   Tuesday, July 31, 2018, 10:20 Travis CaveSouth Hot-CellStandard OperationTM2Nb#8Module move TM#2 with Nb#8 has been moved from
ITW to the south hot cell.
  
  1762   Wednesday, August 01, 2018, 14:48 Travis CaveConditioning StationStandard OperationTM2UC#23Spent Target Move TM#2 with UC#23 has been moved from
the south hot cell to the conditioning station.
  