ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
1626
|
Tuesday, September 26, 2017, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Electrical Check | Electrical check of TM#2 with Ta#54 at
the south hot cell. See attached PDF for
details. |
|
1627
|
Wednesday, September 27, 2017, 08:00 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Ta#54 installed | Containment box has been replaced onto
TM2, interior of containment box vacuumed,
and Ta#54 installed with new fasteners (high |
|
1628
|
Wednesday, September 27, 2017, 09:02 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Ta#54 | Module move | TM#2 with Ta#54 has been moved from
the south hot cell to the conditioning station. |
|
1629
|
Thursday, September 28, 2017, 10:50 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Helium pressure test on TM2 window and HS water lines at TCS. | I did helium pressure test on TM2
containment box window and HS line at TCS.
@ 70psi helium for 3 minutes, HS:2.2XE-7 |
|
1631
|
Thursday, September 28, 2017, 15:34 |
Anders Mjos | Conditioning Station | Development | TM2 | | Changes to MP3 startup | Due to problems with the regulating
valve WPV1, the VFD (Variable Frequency Drive)
for the pump has been programmed to do a |
|
1632
|
Thursday, September 28, 2017, 17:44 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#54 | Conditioning Ta#54 | Thursday, September 28, 2017
Cooling water not yet connected to
TM. |
|
1633
|
Tuesday, October 03, 2017, 09:29 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#54 | Module move | TM#2 with Ta#54 has been moved from
the conditioning station to the west target
station. |
|
1654
|
Tuesday, November 07, 2017, 10:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Module move | TM#2 with Ta#54 has been moved from
the west target station to the south hot
cell. |
|
1656
|
Thursday, November 09, 2017, 09:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#55 | Leak check on TM2 HS line at SHC and TCS. | The TM2 HS line was leak checked at SHC
yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed
by Chad, NO leak. It was helium pressurized |
|
1657
|
Thursday, November 09, 2017, 09:35 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#55 | TM2 has been connected at TCS | TCS vacuum system and water system have
been started as well. Everything looks fine. |
|
1658
|
Thursday, November 09, 2017, 10:39 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#55 | Conditioning Ta#55 | Thursday, November 09, 2017, 10:40: BIAS
/ EL to 30 / 15 kV. 400 uA on BIAS
Bias was stable for 1 hour. Handed |
|
1659
|
Monday, November 13, 2017, 13:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 and #55 | Electrical Check | The results of the various electrical
check done on the target module on November
7th and 8th of 2017. Checks were done with |
|
1661
|
Tuesday, November 14, 2017, 10:01 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#55 | Module move | TM#2 with Ta#55 has been moved from
the conditioning station to the west target
station. The field was measured on the access |
|
1662
|
Tuesday, November 14, 2017, 14:34 |
David Wang | ITW | Standard Operation | TM2 | Ta#55 | TM2 has been connected in ITW. | TM2 has been connected in ITW. All turbo-pumps
are started. Everything works fine. |
|
1666
|
Wednesday, December 13, 2017, 15:32 |
Anders Mjos | Assembly/Bench Test | Maintenance | TM2 | | Source Tray inspection | The Source tray was inspected in the RH
shop today by Anders, Friedhelm and Jens.
The routing of the lines are satisfactory, |
|
1670
|
Friday, December 22, 2017, 11:09 |
Anders Mjos | ITW | Standard Operation | TM2 | | Shut down High Active Cooling water | Stopped MP1 today in preparation for the
power outage over the holidays. both P-25
and P-26 breakers have been switched off |
|
1677
|
Tuesday, January 16, 2018, 10:36 |
Anders Mjos | Spent Target Vault | Standard Operation | TM2 | | Old TM2 Source Tray moved to Cyclotron basement | The old TM2 Source Tray from 2009 has been
moved to Cyclotron basement this morning.
Source tray was stored in location 9. The |
|
1686
|
Tuesday, February 13, 2018, 13:56 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#55 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR |
|
1687
|
Wednesday, February 14, 2018, 10:06 |
Anders Mjos | ITW | Maintenance | TM2 | | Replaced parker couplings on Window cooling line | By Anders & David. Couplings will be
taken apart for inspection. |
|
1688
|
Friday, February 16, 2018, 13:46 |
Anders Mjos | ITW | Maintenance | TM2 | | Parker coupling inspection | Findings and photos from the inspections
attached. The inspection was conducted by
Anders, David and Maico. |
|