Entry  Thursday, June 08, 2017, 07:37, David Wang, Conditioning Station, Standard Operation, TM2, , Helium pressure test on TM2 water llines at TCS. TM2_helium_pressure_test..png
  The helium pressure test on HS line is done at TCS
 this morning. I got the same result as last time when we helium pressure  it it with first target in April. The leak  rate on this line is 1.8  XE-7atm.cc/sec.
So, we know this leak is mostly on the line, but not on  the VCR joints connecting the target.  See attachment for last  time(April) checking e-log.
Entry  Thursday, June 08, 2017, 08:35, David Wang, Conditioning Station, Development, TM2, , TM2 gas line reconfiguration on the module top. TM2_gas_line_on_the_top_002.JPG
Reconfigured TM2 gas line on the module top. It matches with the febiad gas line we are using on service tray now. Facing the module, both of them should
be that right side line of two SST lines on feed-through. The gas line on TM2 was leak checked with a blind cap installed on service tray side and LD connected
on module top this Tuesday. It is leak free with helium spray on the top of module and service tray.
Entry  Tuesday, June 13, 2017, 09:57, Travis Cave, ITW, Standard Operation, TM2, SiC#36, module moved 
TM#2 with SiC#36 has been moved from the conditioning station to the west target station.
Entry  Tuesday, June 13, 2017, 13:41, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected in ITW. 
Yasmine and I connected TM2 in ITW today. the control page is set to febiad mode. Both gas line in ITW are opened for febiad run. All connections are
double checked. Module connection checklist is finished.  All turbo pumps are started now. Everything is good so far. The TM2 is ready for conditioning
when the ITW vacuum is good enough.
Entry  Monday, June 19, 2017, 07:29, David Wang, Conditioning Station, Standard Operation, TM2, , Update TH MS project schedule. Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp
Update TH MS project schedule. See attachment 1,2. 
Entry  Tuesday, August 01, 2017, 14:39, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#36, Electrical Check TM2_SiC36_SHC_elec_chk.PDFTM2_SiC36_Postbeam_SHC_elec_chk.PDF
The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results
are posted here as well.
Entry  Wednesday, August 02, 2017, 15:09, David Wang, ITW, Standard Operation, TM2, , TM2 was disconnencted in ITW yesterday. 
Tm2 was disconnected in ITW yesterday. ITW EL cable crimp ring was broken. John Chow replaced this ring this afternoon.
Entry  Wednesday, August 02, 2017, 15:13, David Wang, South Hot-Cell, Standard Operation, TM2, , SHC, TM2 leak check on HS line. 
HS line is leak checked at SHC this afternoon by helium spay.  Leak detector base LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4 torr. No leak has
been found. This line will be helium pressured  at TCS. It had  a 1.7XE-7 atm.cc/sec leak rate on 70 psi helium at TCS  during last two
target  checks.
Entry  Thursday, August 03, 2017, 17:08, Anders Mjos, Conditioning Station, Repair, TM2, , Power bump 
 Thursday, August 03, 2017, 17:08: Restarting vacuum and water system
Entry  Tuesday, August 08, 2017, 13:26, Travis Cave, ITW, Standard Operation, TM2, Ta#53, module moved 
TM#2 with Ta#53 has been moved from the conditioning station to the west target station.
    Reply  Tuesday, August 15, 2017, 09:27, Anders Mjos, South Hot-Cell, Standard Operation, TM2, SiC#36, Electrical Check of target in SHC 


    
        
            Travis Cave wrote:
        
        
            
            The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results
    Reply  Tuesday, August 15, 2017, 09:30, Anders Mjos, ITW, Standard Operation, TM2, Ta#53, TM2 radiation fields 


    
        
            Travis Cave wrote:
        
        
            
            TM#2 with Ta#53 has been moved from the conditioning station to the west target station.
Entry  Tuesday, September 19, 2017, 13:53, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#53, Module move 
 TM#2 with Ta#53 has been moved from the west target station to the south hot cell.
Entry  Wednesday, September 20, 2017, 13:38, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Insulator replacement 20170920_132813.jpg20170920_132820.jpg20170920_133244.jpg
Broken insulators ITD0053 and ITD0054 have been uninstalled from TM2.
Entry  Thursday, September 21, 2017, 10:48, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#53, Electrical Check TM2_Ta53_elec_chk_shc.PDFTM2_Ta53_elec_chk_post_beam_shc.PDFTM2_notgt_elec_chk_shc_09202017.PDF
Electrical checks of TM#2 with Ta#53 and also with out a target.
Entry  Thursday, September 21, 2017, 12:07, chad fisher, South Hot-Cell, Repair, TM2, , Insulator Replacement 
Insulators ITD0053 and 54 have been replaced. All fasteners torqued to 56 in lbs.
 
Entry  Thursday, September 21, 2017, 16:26, Anders Mjos, South Hot-Cell, Standard Operation, TM2, , Inspection of Source Tray TM2_Source_Tray_EE_Insulator.pdf
Chad and Anders inspected the Source Tray today using the camera in the hot cell. A dark spot was observed on one of the four insulators separating the
Extraction Electrode from the Ground Electrode. This could potentially influence the high leakage current. Some discolored areas were also observed in
the Service Tray, but these was present when the module was built. See attachment for details.
Entry  Friday, September 22, 2017, 11:00, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check TM2_notgt_elec_chk_shc_09212017.PDF
Electrical check of TM#2 after the insulator change on thursday september 21.
Entry  Friday, September 22, 2017, 12:13, David Wang, South Hot-Cell, Maintenance, TM2, , TM2 service cap inside inspection. TM2_serica_cap_inspection_002.JPGTM2_serica_cap_inspection_003.JPGTM2_serica_cap_inspection_004.JPGTM2_serica_cap_inspection_005.JPGTM2_serica_cap_inspection_008.JPG
Two side panels on TM2 service cap were removed for TM2 service cap inside inspection. A piece of cable tie was found inside cap closing to service tray
entrance area. All blue nylon insulators are inspected. They look good. The broken cable tie is moved out of service cap.
 Panels are installed back after the inspection.
Entry  Friday, September 22, 2017, 14:15, chad fisher, South Hot-Cell, Repair, TM2, , TM2 containment box off 20170922_140546.jpg20170922_140927.jpg
TM2 containment box has been removed. Found a piece of capton tape or tubing under table (see picture).