  RH-ISAC, Page 69 of 141  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Moduledown Target/Number Subject
  1413   Saturday, December 03, 2016, 10:01 David WangITWRepairTM2 venting ITW and TM2 with argon.

A short between TM2 EE and bias is produced yesterday during tube heater ramp up.  Alex asked for an argon venting on ITW to see if the problem could be solved by venting and pumping down yesterday.  I set up argon venting system in electrical room and started the venting at 8:30 AM this morning.  It will take 5 hours to vent the ITW to 760 torr(mechanical gauge reading).  The venting system pressure is set as 2 torr. A pressure relieve valve is installed into ITW venting line to prevent station over venting. The argon bottle  valve in electrical room will be closed by isac opps after 5 hours venting.

  1415   Monday, December 05, 2016, 10:10 David WangITWStandard OperationTM2 Five shielding blocks have been transferred from ITE to ITW.

The ITW is configured to take proton beam.

  1419   Thursday, January 12, 2017, 14:24 David WangITWStandard OperationTM2 ITW primary and secondary vacuum vessel winter shut down leak check.

TM2 is located in ITW for this leak check. Leak detector is installed between ITW BV2s as before. LD base leak rate 0.0XE-9atm.cc/sec, base pressure 0.0XE-4 Torr. First , I leak checked dump module top flange seal which a small leak was found in last year winter shut down. This time,all ITW  turbo-pumps cooling fans are switched off during the check. Lots helium are sprayed around the dump module top flange this time. I did not see any response on LD.  The check is repeated 3 times. The results are same. There is no leak has been found on ITW dump module top flange seal at this moment. The  further confirming check will be repeated  when TM2 is moved back to ITW with dummy Febiad target  at the end of this month. The rest check result:  1 small leak(1.2 xE-8 atm.cc/sec) is found on one TM2 blue nylon bottom o-ring. This o-ring will be replaced when module is moved out of ITW.  It will be an easy job. Another small leak( 1.1XE-8 atm.cc/sec) is found on exit module 1 service cap top plate to frame o-ring seal. Its location is on east-south side of the exit module 1.This side is close and parallel to exit module 2 west-south side. Vacu- seal sprayer is used to fix this problem.  After two times spray, the leak is disappeared. This is not a permanent fix. The big top plate o-ring replacement is a complicate and dose taking job. It need to be well planned. The leak rate is small, and the leak source is close to ITW TP3 so there is no rush to replace the big o-ring on exit 1 service cap top plate at this moment. But, we need to close watching on this issue and have a job plan for this o-ring replacement since it could get worse in the future. There is no leak has been found on big T tank seal this year as well. All other primary and secondary vacuum seals  in ITW are good. TM2 water lines helum pressurize will be fulfilled In ITW or at TCS later. I will update this e-log when further test are finished.

 2017-01-25:  The O-ring on 60KV bias blue nylon stand is replaced at TCS. I leak check it. It is perfectly good now.

  1420   Monday, January 16, 2017, 09:32 David WangITWStandard OperationTM2 Helium pressure test on TM2 water llines at ITW

TM2 helium pressure test result at ITW. 70 psi helium 3 minutes on each circuit. LD base LR0.0XE-9atm.cc/sec  BP 0.0XE-4torr.  ITW IG1 1.22Xe-7 torr, ITW IG1S 1.31XE-7torr, ITW PNG4 2.66XE-6Torr(ITW TP4 off).

 

  2017-01-13 (atm.cc/sec) 2017 mini shut down
HS 0.0 x E-9  
Window 0.0 x E-9  
EE 2.7 x E-9  
Ta+ 2.2 x E-9  
Ta- 6.6 x E-9  
Tube- 1.3 x E-8  
Tube+ 2.8 x E-8  
Coil 2 2.8 x E-9  
coil 1 7.1 x E-9  
MSP 6.7 x E-8  
GE leak , no test  

All number are getting better comparing to last time check. All ITW vacuum readings are very good. ITW PNG4 was in low E-7 torr range also. At present, it is in low E-6 range due to ITW TP4 switching off.  The TM2  water line seals  are stable and reliable for 2017 beam run. The same check will be repeated  in 2017 mini shut down.

  1425   Tuesday, January 24, 2017, 15:24 David WangConditioning StationStandard OperationTM2 TM2 electrical check and leack check.

I did electrical check before and after Fefiad target installation on TM2. The RU (coil) Is till short to 60KV as before. Other result are good. After Febiad target is installed, Tm2 HS line is leak checked. On leak detector, base leak rate pumping down is much slow  than before.  The base pressure still could be pumped down to 0.0XE-4 torr.  After a long time wait, Chad and I leak checked at 2.2XE-8 atm.cc/sec base leak rate. Chad sprayed lots helium around the fittings and target. No any response has been found on LD. At this leak rate, the target and HS line is leak tight.  The Tm2 has been moved to THC so a heium pressure check will be fulfilled on HS line at TCS to confirm this leak check result.  

TM2 HS line is pressurized with 70 psi helium at TCS. LD base leak rate: 0.0 X E-9 atm.cc/sec. Base pressure 0.0XE-4 torr. 5 minutes test time. The leak rate slowly climed to 3.3XE-9 atm.cc/sec and stabled there( 3minutes). base pressure no change. The leak is too small to be concern. We will run this target as this condition.

 

  1426   Tuesday, January 24, 2017, 15:29 David WangConditioning StationStandard OperationTM2 TM2 has been moved to TCS .

I connected TCS vacuum system to TM2. The station is under roughing now. All turbo pumps will be started soon.

  1427   Tuesday, January 24, 2017, 15:32 David WangITWStandard OperationTM2 TM2 was moved from ITW to SHC this morning.

The move is smooth. Yasmine and Travis did the move.

  1428   Friday, January 27, 2017, 08:44 chad fisherSouth Hot-CellStandard OperationTM2Ta#50UCx #18 - Ta Feibiad Dummy installed. Target Change Waterline interference

On Tuesday, January 24th UCx#18 was removed from TM2 and Ta febiad dummy installed. I encountered the same issue mounting the new target as last time. Was able to determine that the issue is the routing of the waterlines to the right-hand (as viewed from the operator) high current tube heater. The lines interfer the the target mounting plate (bottom right hand corner).

Attachment 1: TM2_Waterline_interference.jpg
TM2_Waterline_interference.jpg
  1431   Friday, January 27, 2017, 10:52 David WangConditioning StationStandard OperationTM2 TM2 has been moved from TCS to ITE

The move is successful.

  1432   Wednesday, February 01, 2017, 12:23 David WangITEStandard OperationTM2 TM2 has been connected in ITE.

TM2 has been connected in ITE. The SST window water lines in ITE can not be connected properly to TM2. The water line connector on TM2 window is 90 degree CCW installed in direction comparing to TM4.This caused the problem. Solution: Two piece of flexible lines and extra male QC adapters have been used to fix this issue.  HV cover and HV fence in ITE work  with TM2. Other connections are good as well.

  1447   Wednesday, March 08, 2017, 14:09 David WangITEMaintenanceTM2 ITE IG1S increasing.

By retrieving data further, It has been found no directly relationship between IG1S surging and dump plug water opening. Vacuum surging is 10minutes ahead dump water supply to circuit. SEE attachment 1. Also, The ITE IG1S start to behavior unusual in middle of Feburary. See attachment 2. Today,  ITE IG1S is still slowly climbing up. I decide to leak check ITE vacuum vessel. Before  leak check, for more information and trouble shooting. I closed water supply to ITE to see if vacuum has response on it. I will return water supply to ITE  tomorrow morning.

Water supply to ITE is returned this afternoon at 2: 10 PM.  Everything works fine so far

I leak checked ITE secondary vessel vacuum. A leak have been found in March 09th noon which is located between entrance module and TM2 top tank flange o-ring seal( on tank flange). It could not be confirm on which side of the o-ring the leak is from.

During last night, ITE IG1S reading went back to normal low E-7 range and stays in this range now. So I leak checked same area again this morning. The leak disappeared now. The o-ring works sometime , but not all the time. The plan for this issue: Change ITE target module side o-ring when TM2 is move out., and watch on the ITE IG1s when TM4 is moved back to ITE and pumped down.

Attachment 1: ITE_IGIS_surge.png
ITE_IGIS_surge.png
Attachment 2: ITE_IG1S_and_PNG4.png
ITE_IG1S_and_PNG4.png
Attachment 3: ITE_IG1S_back_to_normal_overnight.png
ITE_IG1S_back_to_normal_overnight.png
Attachment 4: ITE_IG1S_behavior_from_Feb_08th_to_Mar_10th.png
ITE_IG1S_behavior_from_Feb_08th_to_Mar_10th.png
  1457   Wednesday, March 22, 2017, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2test targetmodule moved

TM#2 has been moved from the east target station to the south hot cell.

  1458   Thursday, March 23, 2017, 09:30 Travis CaveSouth Hot-CellStandard OperationTM2test targetElectrical Check

Electrical check of the Ta test target on TM#2

Attachment 1: TM2_Ta_Dummytgt_Preandpost.PDF
TM2_Ta_Dummytgt_Preandpost.PDF TM2_Ta_Dummytgt_Preandpost.PDF
  1466   Monday, March 27, 2017, 13:40 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check

Did the start of the running year electrical checks of both TM#2 and TM#4 with no target attached to either module. TM#2 was in the south hot cell and TM#4 is in the conditioning station under vacuum.

Attachment 1: TM2__No_Tgt.PDF
TM2__No_Tgt.PDF
Attachment 2: TM4__No_Tgt.PDF
TM4__No_Tgt.PDF
  1486   Tuesday, April 11, 2017, 11:30 Travis CaveSouth Hot-CellStandard OperationTM2Ta#51Electrical Check

Electrical check performed on TM#2 with Ta#51, see attached PDF.

Attachment 1: TM2_Ta51_SHC_elec_chk.PDF
TM2_Ta51_SHC_elec_chk.PDF
  1487   Tuesday, April 11, 2017, 14:02 Travis CaveConditioning StationStandard OperationTM2Ta#51module moved

TM#2 with Ta#51 has been moved from the south hot cell to the conditioning station.

  1489   Wednesday, April 12, 2017, 07:26 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.

Roughing down overnight. Turbo pumps are started this morning. Everything looks good so far.

  1495   Thursday, April 13, 2017, 11:33 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 water llines at TCS.

LD  BLR :0.0 X E-9 atm.cc/sec. BP:0.0XE-4 torr. helium 70 psi. 3 minutes on each circuit

HS 1.8XE-7 ATM.CC/SEC
TA+ 1.4 XE-7
TA- 4.3XE-8
TUBE+ 1.0XE-7
TUBE- 5.9XE-8
COIL 1 2.2XE-9
COIL 2 0.0XE-9
EE 0.0XE-9
MSP 8.8XE-8
ALL TOGETHER 6.7XE-7
ALL TOGETHER WITHOUT HS 4.7XE-7

There is a smallleak HS which we did not see before. The HS is checked in SHC  with helium spray yesterday. We did not see the leak . We checked this HS line every time when new target was installed. So mostly, this small leak is from VCRs connected to new target. But, we can not confirm it.  Still this line will be checked on next new target. We should have a better understanding when checking next time.  Other line are almost same as we checked in last year November. I did not see essential change.

  1496   Thursday, April 13, 2017, 11:44 Anders MjosConditioning StationStandard OperationTM2Ta#51Conditioning Ta#51

 Thursday, April 13, 2017, 11:43: Water package started.

  1500   Monday, April 24, 2017, 09:52 David WangConditioning StationStandard OperationTM2 Switch off TCS water system and vacuums

The TCS bias was turn off before that. The TM2 and TCS are still under vacuum now.