Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1406
Entry time:
Thursday, November 24, 2016, 10:30
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM2
Target/Number:
Subject:
HV cover is installed on TM2 at TCS
Interlock key are returned back to B2 level.TM2 is ready for HV conditioning and heating up at TCS.
ELOG V2.9.2-2455