2137
|
Tuesday, August 25, 2020, 09:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Graphite #1 | Module move | TM#2 with Graphite #1 has been moved
from the conditioning station to the south
hot cell. |
|
|
2141
|
Thursday, August 27, 2020, 11:14 |
Travis Cave | Spent Target Vault | Standard Operation | | Graphite #1 | Spent Target Move | Graphite #1 along with the broke
2A2M19 wire scanner have been placed in the
spent target vault see attached PDF for deatails. |
|
|
2326
|
Wednesday, May 25, 2022, 13:43 |
Frank Song | ITW | Standard Operation | TM2 | Febiad-Test | module disconnection | TM2 with a test target was disconnected
in ITW. |
|
|
2316
|
Thursday, April 28, 2022, 07:24 |
Frank Song | ITW | Standard Operation | TM2 | Febiad Test Target | Module Connection | TM2 was connected in ITW with a Febiad
Test Target. |
|
|
2315
|
Thursday, April 21, 2022, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Febiad TEST | TM2 FEBIAD WITH A TEST TARGET | A Test Febiad Target was installed
and checked at SHC. |
|
|
1117
|
Friday, November 06, 2015, 14:36 |
Anders Mjos | Conditioning Station | Development | TM3 | FEBIAD test target | Testing TM3 | Friday, November 06, 2015, 14:35: Roughing
Turbos was started around 4pm. Later
it was found that the manual valve for the |
|
|
1121
|
Tuesday, November 10, 2015, 16:53 |
Anders Mjos | Conditioning Station | Development | TM3 | FEBIAD test target | Testing TM3 | Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24:
TP1S started |
|
|
1045
|
Friday, August 21, 2015, 11:38 |
Anders Mjos | South Hot-Cell | Repair | TM2 | FEBIAD Test Target | Steerer wires found to be touching the gas lines | Yesterday TM2 was inspected in the SHC.
Spark marks were found both on the steerer
wires and on the ANODE wire. The steerer |
|
|
1119
|
Monday, November 09, 2015, 16:47 |
Anders Mjos | Conditioning Station | Maintenance | TM3 | FEBIAD Test Target | Leak check of Service Cap | Service cap leak checked this afternoon.
Found multiple leaks of 10E-8 to 10E-7 range.
Connected to the backing line with IG1 at |
|
|
1123
|
Thursday, November 12, 2015, 13:25 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check and leak check | Target to Anode and target to Common showed
~ 500 kOhm values. No leaks above 3E-9 atm-cc/s
seen. See attached. |
|
|
1125
|
Monday, November 16, 2015, 10:09 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check after HV conditioning | Problem found between ANODE (F) and
chassis 90 kOhm. See attachment for details. |
|
|
1126
|
Monday, November 16, 2015, 10:33 |
Anders Mjos | Conditioning Station | Standard Operation | | FEBIAD Test Target | HV conditioning by ISAC operators | ISAC operators attempted HV conditioning
over the weekend.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=218447&style=entry |
|
|
273
|
Friday, March 22, 2013, 18:49 |
Aurelia Laxdal | Conditioning Station | Development | TM4 | FEBIAD HP with Dummy Target | Commissioning TCS - Part 1 | Today, the commissioning of the TCS went
well. The water/vacuum interlocks were checked
OK. Then, the TCS was HV conditioned up to |
|
|
274
|
Saturday, March 23, 2013, 18:14 |
Aurelia Laxdal | Conditioning Station | Development | TM4 | FEBIAD HP with Dummy Target | Commissioning TCS - Part 2 Completed | After few hickups the TCS was successfuly
commissioned.
In the morning, in the middle of |
|
|
276
|
Monday, March 25, 2013, 10:59 |
Bevan Moss | Conditioning Station | Development | TM4 | FEBIAD HP with Dummy Target | Commissioning TCS - Part 2 Completed |
|
 |
|
664
|
Tuesday, May 27, 2014, 09:38 |
maicodallavalle | Spent Target Vault | Maintenance | | F-308 Maintenance | F-308 Maintenance | All the F-308's can back from being certified
at Nordion. All of the F-308's have
been serviced and are ready to be filled |
|
|
583
|
Monday, January 20, 2014, 13:40 |
maicodallavalle | Spent Target Vault | Maintenance | | F-308 | Empty F-308s | Four empty F-308s just arrived back at
Triumf. I moved them from shipping
to the Remote Handling Shop for service and |
|
|
1721
|
Thursday, May 24, 2018, 10:02 |
Anders Mjos | ITE | Development | TM4 | Empty | Module move ventilation test | The new module move ventilation procedure
was successfully tested (ITM:MP2). ITM:CM4
did not drop below 6 in during the test. |
|
|
2199
|
Friday, March 12, 2021, 11:36 |
Travis Cave | South Hot-Cell | Maintenance | | East Entrance Module | Entrance module move | The East Entrance Module has been
moved from the East Target Station to the
South Hot Cell. |
|
|
1096
|
Thursday, October 08, 2015, 14:08 |
David Wang | South Hot-Cell | Standard Operation | TM3 | Dummy target febiad. | TM3 has been moved from SHC to NW silo | Bill and I moved TM3 from SHC to NW silo
with a dummy febiad target installed on it.
The move is smooth. |
|