  2137   Tuesday, August 25, 2020, 09:38 Travis CaveSouth Hot-CellStandard OperationTM2Graphite #1Module move TM#2 with Graphite #1 has been moved
from the conditioning station to the south
hot cell.
  
  2141   Thursday, August 27, 2020, 11:14 Travis CaveSpent Target VaultStandard Operation Graphite #1Spent Target Move Graphite #1 along with the broke
2A2M19 wire scanner have been placed in the
spent target vault see attached PDF for deatails.
 Target_Index_2020-08-27.pdf 
  2326   Wednesday, May 25, 2022, 13:43 Frank SongITWStandard OperationTM2Febiad-Testmodule disconnection TM2 with a test target was disconnected
in ITW.
 tm2_disconnection.jpg 
  2316   Thursday, April 28, 2022, 07:24 Frank SongITWStandard OperationTM2Febiad Test TargetModule Connection TM2 was connected in ITW with a Febiad
Test Target. 
 module_connection_checklist20220426.jpg 
  2315   Thursday, April 21, 2022, 13:29 Frank SongSouth Hot-CellStandard OperationTM2Febiad TESTTM2 FEBIAD WITH A TEST TARGET A Test Febiad Target was installed
and checked at SHC. 
 TEST_FEBIAD_TARGET_E_CHECK.jpg 
  1117   Friday, November 06, 2015, 14:36 Anders MjosConditioning StationDevelopmentTM3FEBIAD test targetTesting TM3Friday, November 06, 2015, 14:35: Roughing
Turbos was started around 4pm. Later
it was found that the manual valve for the
  
  1121   Tuesday, November 10, 2015, 16:53 Anders MjosConditioning StationDevelopmentTM3FEBIAD test targetTesting TM3Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24:
TP1S started
 2015-11-13_TCS_TM3_FEBIAD_Test_Target.docx 
  1045   Friday, August 21, 2015, 11:38 Anders MjosSouth Hot-CellRepairTM2FEBIAD Test TargetSteerer wires found to be touching the gas linesYesterday TM2 was inspected in the SHC.
Spark marks were found both on the steerer
wires and on the ANODE wire. The steerer
  
  1119   Monday, November 09, 2015, 16:47 Anders MjosConditioning StationMaintenanceTM3FEBIAD Test TargetLeak check of Service CapService cap leak checked this afternoon.
Found multiple leaks of 10E-8 to 10E-7 range.
Connected to the backing line with IG1 at
  
  1123   Thursday, November 12, 2015, 13:25 Anders MjosConditioning StationStandard OperationTM3FEBIAD Test TargetElectrical check and leak checkTarget to Anode and target to Common showed
~ 500 kOhm values. No leaks above 3E-9 atm-cc/s
seen. See attached.  
 TM3_iwth_FEBIAD_in_TCS_Electrical_Check.pdf 
  1125   Monday, November 16, 2015, 10:09 Anders MjosConditioning StationStandard OperationTM3FEBIAD Test TargetElectrical check after HV conditioning Problem found between ANODE (F) and
chassis 90 kOhm. See attachment for details.
 2015-11-16_TM3_Electrical_Test.pdf 
  1126   Monday, November 16, 2015, 10:33 Anders MjosConditioning StationStandard Operation FEBIAD Test TargetHV conditioning by ISAC operatorsISAC operators attempted HV conditioning
over the weekend.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=218447&style=entry
  
  273   Friday, March 22, 2013, 18:49 Aurelia LaxdalConditioning StationDevelopmentTM4FEBIAD HP with Dummy TargetCommissioning TCS - Part 1Today, the commissioning of the TCS went
well. The water/vacuum interlocks were checked
OK. Then, the TCS was HV conditioned up to
  
  274   Saturday, March 23, 2013, 18:14 Aurelia LaxdalConditioning StationDevelopmentTM4FEBIAD HP with Dummy TargetCommissioning TCS - Part 2 CompletedAfter few hickups the TCS was successfuly
commissioned.
In the morning, in the middle of
  
  276   Monday, March 25, 2013, 10:59 Bevan MossConditioning StationDevelopmentTM4FEBIAD HP with Dummy TargetCommissioning TCS - Part 2 Completed

    

       
            
 IRH1511.pdfISK4574D-rev7.pdf 
  664   Tuesday, May 27, 2014, 09:38 maicodallavalleSpent Target VaultMaintenance F-308 Maintenance F-308 MaintenanceAll the F-308's can back from being certified
at Nordion.  All of the F-308's have
been serviced and are ready to be filled
  
  583   Monday, January 20, 2014, 13:40 maicodallavalleSpent Target VaultMaintenance F-308Empty F-308sFour empty F-308s just arrived back at
Triumf. I moved them  from shipping
to the Remote Handling Shop for service and
  
  1721   Thursday, May 24, 2018, 10:02 Anders MjosITEDevelopmentTM4EmptyModule move ventilation testThe new module move ventilation procedure
was successfully tested (ITM:MP2). ITM:CM4
did not drop below 6 in during the test.
  
  2199   Friday, March 12, 2021, 11:36 Travis CaveSouth Hot-CellMaintenance East Entrance ModuleEntrance module move The East Entrance Module has been
moved from the East Target Station to the
South Hot Cell.
  
  1096   Thursday, October 08, 2015, 14:08 David WangSouth Hot-CellStandard OperationTM3Dummy target febiad.TM3 has been moved from SHC to NW siloBill and I moved TM3 from SHC to NW silo
with a dummy febiad target installed on it.
The move is smooth.
  