Monday, November 16, 2015, 10:33, Anders Mjos, Conditioning Station, Standard Operation, , FEBIAD Test Target, HV conditioning by ISAC operators
|
ISAC operators attempted HV conditioning over the weekend.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=218447&style=entry
|
Friday, March 22, 2013, 18:49, Aurelia Laxdal, Conditioning Station, Development, TM4, FEBIAD HP with Dummy Target, Commissioning TCS - Part 1
|
Today, the commissioning of the TCS went well. The water/vacuum interlocks were checked OK. Then, the TCS was HV conditioned up to 33kV.
Tomorrow, the heaters will be ramped up. |
Saturday, March 23, 2013, 18:14, Aurelia Laxdal, Conditioning Station, Development, TM4, FEBIAD HP with Dummy Target, Commissioning TCS - Part 2 Completed
|
After few hickups the TCS was successfuly commissioned.
In the morning, in the middle of the heaters conditioning: 360A/250A for the TGHT/TBHT, the target heater PS tripped and it didn't recover immediately.
I cannot tell if the card is still OK. Before this even, there were few bias current sparks created when the ionized tube was raised above 250A; this also |
Monday, March 25, 2013, 10:59, Bevan Moss, Conditioning Station, Development, TM4, FEBIAD HP with Dummy Target, Commissioning TCS - Part 2 Completed ![IRH1511.pdf IRH1511.pdf](attachment.png)
|
Aurelia Laxdal wrote:
After few hickups the TCS was successfuly commissioned. |
Tuesday, May 27, 2014, 09:38, maicodallavalle, Spent Target Vault, Maintenance, , F-308 Maintenance , F-308 Maintenance
|
All the F-308's can back from being certified at Nordion. All of the F-308's have been serviced and are ready to be filled with spent targets. |
Monday, January 20, 2014, 13:40, maicodallavalle, Spent Target Vault, Maintenance, , F-308, Empty F-308s
|
Four empty F-308s just arrived back at Triumf. I moved them from shipping to the Remote Handling Shop for service and inspection. I will work on
them when not busy with my other shutdown work. ( Cyclotron work) |
Thursday, May 24, 2018, 10:02, Anders Mjos, ITE, Development, TM4, Empty, Module move ventilation test
|
The new module move ventilation procedure was successfully tested (ITM:MP2). ITM:CM4 did not drop below 6 in during the test. |
Friday, March 12, 2021, 11:36, Travis Cave, South Hot-Cell, Maintenance, , East Entrance Module, Entrance module move
|
The East Entrance Module has been moved from the East Target Station to the South Hot Cell. |
Thursday, October 08, 2015, 14:08, David Wang, South Hot-Cell, Standard Operation, TM3, Dummy target febiad., TM3 has been moved from SHC to NW silo
|
Bill and I moved TM3 from SHC to NW silo with a dummy febiad target installed on it. The move is smooth. |
Thursday, August 13, 2015, 17:17, David Wang, Conditioning Station, Repair, TM2, Dummy target, TM2 at CS
|
TM2 has been moved to CS. All turbo-pumps have been started. The pumping down is good so far. I connected the leak detector to service cap, and
finished the leak check today. The LD base LR:0.0Xe-9atm.cc/sec. 80psi helium were applied to coil1, coil 2. HS and window circuits, each for 2minutes.
No any response has been found on LD. So all water lines are leak tight now. I also sprayed helium to top service cap checking all air to |
Thursday, August 13, 2015, 11:34, Travis Cave, South Hot-Cell, Standard Operation, TM2, Dummy Target, Electrical Check ![TM2_elechknotgtafterwidget.PDF TM2_elechknotgtafterwidget.PDF](attachment.png) ![TM2_elechknotgtshunt.PDF TM2_elechknotgtshunt.PDF](attachment.png)
|
Electrical check of TM2 without target after that widget has installed, electrical check with the shunts on, electrical check with the dummy target installed. |
Thursday, August 13, 2015, 14:36, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Module moved
|
TM#2 with the dummy target has been moved to the conditioning station. |
Thursday, August 20, 2015, 10:15, Travis Cave, South Hot-Cell, Standard Operation, TM2, Dummy Target, Module moved
|
TM#2 is now in the south hot cell. |
Thursday, August 20, 2015, 11:00, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Electrical Check
|
TM#2 electrical check at the conditioning station. All pumps were off but the module was not vented. |
Tuesday, March 26, 2019, 09:32, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Module move
|
TM#2 with a new source tray and the dummy target has been moved from the south hot cell to the conditioning station. |
Tuesday, March 26, 2019, 11:10, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Electrical Check
|
Electrical Check of TM#2 with the dummy target attached. |
Friday, February 14, 2020, 11:25, Travis Cave, Conditioning Station, Standard Operation, TM4, Dummy Target, Module move
|
TM#4 with dummy target has been moved from the south hot cell to the conditioning station. |
Monday, July 29, 2019, 16:17, Carla Babcock, Conditioning Station, Repair, TM4, Dummy LP SIS, New leak on EE water line while testing new In seals ![13_PM.png 13_PM.png](attachment.png)
|
Original Problem:
Leaks on the B and D copper blocks, probably due to corrosion between the blocks and the inserts. Final solution, after many tries, was to make
an indium sheet the size of the copper blocks and use that to seal the entire surface. |
Monday, July 08, 2019, 14:56, Carla Babcock, Conditioning Station, Repair, TM4, Dummy HP SIS target, First TM4 conditioning with new source tray
|
Ramping up TM4 with new source tray in. Current condition: new source tray but no water running in lines B, D or window. Multipin on the source tray
grounded but no lines running into the service tray. Vacuum at 1e-6T.
Small sparks at each BIAS voltage increase starting at 30kV. First real spark around 38kV. |
Tuesday, July 09, 2019, 09:15, Carla Babcock, Conditioning Station, Repair, TM4, Dummy HP SIS target, Conditioning TM4 w/ new ST up to 45kV
|
Left TM4 at 40kV overnight with no previous heating. There was only one real spark which turned off TP2 but ops turned it back on. Ramping up again.
Tuesday, July 09, 2019, 09:13 : At 45kV the module is sparking on the top pretty regularly. Turned down and David will remove cover and lock out
target hall. |
|