  439   Friday, August 30, 2013, 10:27 Bevan MossSouth Hot-CellRepairTM3N/AHeat Shield Repair

    

       
            
  
  440   Friday, August 30, 2013, 14:55 Bevan MossSouth Hot-CellRepairTM3N/AHeat Shield Repair

    

       
            
  
  2543   Wednesday, February 14, 2024, 11:34 Adam NewsomeSpent Target VaultStandard Operation Misc.Three pails moved from main vault to mini vaultIn preparation for F-308 loading, three
pails were moved from the main storage vault
to the mini storage vault. The following
 Target_Index_2024-02-14.xlsm 
  1269   Tuesday, June 28, 2016, 14:42 Travis CaveSpent Target VaultStandard Operation ManySpent target assay.The spent target assay were finally started
or re-started today. Four targets were done
today.
 Vault_Storage_June_30_2016.pdfMini_Vault_Storage_June_30_2015.pdf 
  1690   Monday, March 05, 2018, 13:47 Travis CaveSpent Target VaultRepair ManySpent Target Assay The spent target assay was aborted
today after the first target was finished
due to the very old computer that controls
  
  1695   Friday, March 23, 2018, 09:34 Travis CaveSpent Target VaultStandard Operation ManySpent Target Assay All targets in the ISAC Spent Target
Vault have been either assayed and had field
measurement done on them or just measurement
 Target_Index_2018-03-23.pdf 
  218   Monday, December 03, 2012, 19:34 Grant MinorITEStandard OperationTM4LpUCxArgon supply opened for ITE ventAround 7pm tonight I opened the main valve
approximately 1.5 turns on  the Argon bottle
used for venting ITE, located in the ISAC
 Argon_Vent_ITE_Cylinder_Pressure_3Dec2012.jpgArgon_Vent_ITE_Secondary_Regulator_Pressure_Relief_3Dec2012.jpgArgon_Vent_ITE_Needle_Valve_3Dec2012.jpg 
  1830   Wednesday, November 28, 2018, 07:04 David WangITEDevelopmentTM4LpTa 56New high current flexible cables inspection after LpTa#56 beam run.Inspected new high current flexible cables
during TM4 disconnection. The new cables
and adapters work fine.
 new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPGnew_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG 
  2573   Tuesday, April 30, 2024, 08:00 Frank SongSouth Hot-CellStandard OperationTM4Lp-Febiad emptyelectrical check/leak check David Wang made E/L checking before
module moving to ITW. read attachment pls.
 TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf 
  2593   Tuesday, May 21, 2024, 09:50 David WangITWStandard OperationTM4Lp Febiad emptyTm4 has been disconnected in ITW.Tm4 has been disconnected in ITW per document
141576. Checklist is done.  HS line
is purged.
 TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf 
  1039   Monday, August 17, 2015, 10:44 Anders MjosConditioning StationDevelopmentTM2LP-FEBIAD Test Target (empty)Conditioning TM2 Source Tray with FEBIAD test targetTGHT, TBHT, ANODE and COIL power tested
(some amps/volts)
Monday, August 17, 2015, 10:43: BIAS/EL/EE
 FirstBeamTM2SourceTray2015-08-17.pngTM2_Source_Tray_with_FEBIAD_test_target.docx 
  2594   Tuesday, May 21, 2024, 11:46 David WangITWStandard OperationTM4LP febiad empty. Tm4 has been moved from ITW to SHC.Tm4 has been moved from ITW to SHC. the
move is smooth. 
  
  89   Thursday, April 19, 2012, 09:48 David WangSouth Hot-CellStandard OperationTM1LP SIS Nb 6leak check heat shield circuitChad and I did a leak check on TM1 Nb5
target heat shield circuit. The leak detector
was connected to heat shield circuit.The
  
  17   Tuesday, August 02, 2011, 09:41 Pierre BricaultConditioning StationRepairTM1ITW-TM1-Ta#37-LP-SISTest high voltage on TM1 TM1 has received the Ta#37-LP and
has been pumping since thursday. This morning
the pressure gauges read, IMG1: 1.6x10^-6
  
  1532   Wednesday, May 10, 2017, 14:00 Anders MjosSouth Hot-CellDevelopment ITE-Ta-LP-FEBIADTest target examinationChad and Anders inspected the test target
in the hot cell today. The lid had been previously
removed.
  
  2251   Monday, September 27, 2021, 14:29 Travis CaveITWStandard OperationTM2Graphite #3Module move TM#2 with C#3 has been moved from
the north hot cell to ITW. Also for the up
coming site wide power outage, the ISAC Target
  
  2105   Thursday, June 18, 2020, 09:11 Travis CaveITWStandard OperationTM2Graphite #1Module move TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station.
  
  2110   Thursday, June 25, 2020, 09:45 Travis CaveITWStandard OperationTM2Graphite #1Module move TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station.
  
  2127   Friday, July 24, 2020, 09:43 Travis CaveConditioning StationMaintenanceTM2Graphite #1Module move TM#2 has been moved from the west
station to the conditioning station. ITW
entrance module moved will take place on
  
  2131   Thursday, July 30, 2020, 09:57 Travis CaveITWStandard OperationTM2Graphite #1Module move TM#2 with Graphite #1 has been moved
back to the west target station from the
conditioning station.
  