  1519   Tuesday, May 02, 2017, 13:49 Travis CaveSpent Target VaultStandard Operation  Spent Targets moved

Five spent targets have been moved from the target storage vault to the mini vault in preparation for Thursdays loading of the F-308s. See attached for the list of targets in the mini vault, and the new status of the storage vault.

Attachment 1: Mini_Vault_Storage_May_2_2017.pdf
Mini_Vault_Storage_May_2_2017.pdf Mini_Vault_Storage_May_2_2017.pdf Mini_Vault_Storage_May_2_2017.pdf Mini_Vault_Storage_May_2_2017.pdf
Attachment 2: Vault_Storage_May_2_2017.pdf
Vault_Storage_May_2_2017.pdf Vault_Storage_May_2_2017.pdf Vault_Storage_May_2_2017.pdf Vault_Storage_May_2_2017.pdf
  1083   Friday, September 25, 2015, 08:21 Travis CaveSouth Hot-CellStandard Operation UC#13Spent Target move

The spent UC#13 target has been moved from the south hot cell to the ISAC spent target vault. It was placed pail #128 and in tray spot 1A. It was 21.5mSv/hr upon removal from the hot cell. See attached PDF for details.

Attachment 1: Vault_Storage_September_24_2015.pdf
Vault_Storage_September_24_2015.pdf Vault_Storage_September_24_2015.pdf Vault_Storage_September_24_2015.pdf Vault_Storage_September_24_2015.pdf
  1141   Thursday, November 26, 2015, 08:52 Travis CaveSpent Target VaultStandard Operation Ta#46Spent Target move

Ta#46 was placed in the ISAC spent target vault yesterday. See attached PDF for details.

Attachment 1: Vault_Storage_November_26_2015.pdf
Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf
  1177   Tuesday, March 22, 2016, 10:27 Travis CaveSpent Target VaultStandard Operation SiC#32Spent Target move

SiC#32 has been moved from the south hot cell to the spent target storage. See attached PDF for details.

Attachment 1: Vault_Storage_March_22_2016.pdf
Vault_Storage_March_22_2016.pdf Vault_Storage_March_22_2016.pdf Vault_Storage_March_22_2016.pdf Vault_Storage_March_22_2016.pdf
  1204   Monday, April 11, 2016, 10:07 Travis CaveSpent Target VaultStandard Operation UC#14Spent Target move

The spent UC#14 target has been moved into the ISAC spent target vault. See the attached PDF for the details.

Attachment 1: Vault_Storage_April_11_2016.pdf
Vault_Storage_April_11_2016.pdf Vault_Storage_April_11_2016.pdf Vault_Storage_April_11_2016.pdf Vault_Storage_April_11_2016.pdf
  1244   Tuesday, May 24, 2016, 10:52 Travis CaveSpent Target VaultStandard Operation UC#15Spent Target move

Spent UC#15 has been moved from the south hot cell to the spent target storage. It was placed in pail number 136, and placed in spot C of tray one. It was 14.1mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_May_24_2016.pdf
Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf
  1266   Wednesday, June 15, 2016, 09:39 Travis CaveSpent Target VaultStandard Operation Ta#47Spent Target move

The spent Ta#47 target has been moved from the south hot cell to the spent target vault. It was placed in pail #137 in spot 4C of the vault. It was 114mSv/hr upon removal from the vault.

Attachment 1: Vault_Storage_June_15_2016.pdf
Vault_Storage_June_15_2016.pdf Vault_Storage_June_15_2016.pdf Vault_Storage_June_15_2016.pdf Vault_Storage_June_15_2016.pdf
  1280   Monday, July 11, 2016, 10:59 Travis CaveSpent Target VaultStandard Operation Ta#48Spent Target move

The spent Ta#48 was moved from the south hot cell to the spent target vault. I was placed in pail 139 and is in spot 6C in the vault. It was 201mSv/hr when measured at the hot cell. See the attached PDF for the latest results.

Attachment 1: Vault_Storage_July_11_2016.pdf
Vault_Storage_July_11_2016.pdf Vault_Storage_July_11_2016.pdf Vault_Storage_July_11_2016.pdf Vault_Storage_July_11_2016.pdf
  1305   Thursday, August 04, 2016, 08:56 Travis CaveSpent Target VaultStandard Operation UC#16Spent Target move

The spent UC #16 have been moved from the south hot cell to the storage vault see attached PDF for details.

Attachment 1: Vault_Storage_August_3_2016.pdf
Vault_Storage_August_3_2016.pdf Vault_Storage_August_3_2016.pdf Vault_Storage_August_3_2016.pdf Vault_Storage_August_3_2016.pdf
  1340   Thursday, August 25, 2016, 14:25 Travis CaveSpent Target VaultStandard Operation SiC#33Spent Target move

SiC#33 was placed into pail #141 which in turn was placed into slot 2B of the vault. I was 295mS/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_August_25_2016.pdf
Vault_Storage_August_25_2016.pdf Vault_Storage_August_25_2016.pdf Vault_Storage_August_25_2016.pdf Vault_Storage_August_25_2016.pdf
  1362   Monday, September 26, 2016, 13:59 Travis CaveSpent Target VaultStandard Operation UC#17Spent Target move

The spent UC#17 has been moved from the south hot cell to the spent target vault. See the attached pdf for details.

Attachment 1: Vault_Storage_September_26_2016.pdf
Vault_Storage_September_26_2016.pdf Vault_Storage_September_26_2016.pdf Vault_Storage_September_26_2016.pdf Vault_Storage_September_26_2016.pdf
  1373   Thursday, October 20, 2016, 10:45 Travis CaveSpent Target VaultStandard Operation Ta#49Spent Target move

Ta#49 has been removed from the south hot cell and placed in the storage vault. It is in pail 146 and in spot 6A.

  1392   Monday, November 07, 2016, 10:35 Travis CaveSpent Target VaultStandard Operation SiC#34Spent Target move

Spent SiC#34 was moved on the 3rd of November and  placed in the spent target vault. See attached pdf for details.

Attachment 1: Vault_Storage_November_3_2016.pdf
Vault_Storage_November_3_2016.pdf Vault_Storage_November_3_2016.pdf Vault_Storage_November_3_2016.pdf Vault_Storage_November_3_2016.pdf
  1407   Friday, November 25, 2016, 09:04 Travis CaveSpent Target VaultStandard Operation SiC#35Spent Target move

On November 24th 2016 the spent SiC#35 was moved from the south hot cell to the spent target vault. see attached pdf for details.

Attachment 1: Vault_Storage_November_24_2016.pdf
Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf
  1542   Thursday, May 18, 2017, 10:41 Travis CaveSpent Target VaultStandard Operation UC#19Spent Target move

The spent UC#19 target has been moved from the south hot cell into the spent target storage. It was placed in pail #145 and put in tray one spot C. See attached PDF for all vault details.

Attachment 1: Vault_Storage_May_18_2017.pdf
Vault_Storage_May_18_2017.pdf Vault_Storage_May_18_2017.pdf Vault_Storage_May_18_2017.pdf Vault_Storage_May_18_2017.pdf
  1556   Monday, June 12, 2017, 13:51 Travis CaveSpent Target VaultStandard Operation  Spent Target move

The spent Ta#51 target has been moved from the south hot cell to the spent target vault. It was placed in pail#149 and put in spot 8B of the vault.

Attachment 1: Vault_Storage_June_12_2017.pdf
Vault_Storage_June_12_2017.pdf Vault_Storage_June_12_2017.pdf Vault_Storage_June_12_2017.pdf Vault_Storage_June_12_2017.pdf
  1608   Wednesday, August 30, 2017, 11:37 Travis CaveSpent Target VaultStandard Operation Ta#52Spent Target move

The spent Ta#52 target has been moved from the south hot cell to the spent target vault. See attached PDF for details.

Attachment 1: Vault_Storage_August_30_2017.pdf
Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf
  1630   Thursday, September 28, 2017, 11:59 Travis CaveSpent Target VaultStandard Operation Ta#53Spent Target move

The spent Ta#53 has been moved to the spent target vault. See attached file for details.

Attachment 1: Vault_Storage_September_28_2017.pdf
Vault_Storage_September_28_2017.pdf Vault_Storage_September_28_2017.pdf Vault_Storage_September_28_2017.pdf Vault_Storage_September_28_2017.pdf
  1650   Monday, October 23, 2017, 13:38 Travis CaveSpent Target VaultStandard Operation UC#21Spent Target move

The spent UC#21 has been moved from the south hot cell to the spent target vault. See attached for details

Attachment 1: Vault_Storage_October_23_2017.pdf
Vault_Storage_October_23_2017.pdf Vault_Storage_October_23_2017.pdf Vault_Storage_October_23_2017.pdf Vault_Storage_October_23_2017.pdf
  1267   Tuesday, June 21, 2016, 13:47 Travis Cave/ Dan McDonaldSpent Target VaultRepair  Spent Target Vault Door

The spent target vault door does not open or close. The emergency door closing did have to be used to close the door as it was locked in an open position, the door stopped just off the open override limit. The door was closed and the spent target that was being assayed was placed into the mini storage. The problem with the door appears to be related to the motor itself, as all the controls to the motor appear to be in working order. Also it was noticed on the emergency door closing winch the wire rope has a kink in it from sitting in open position for so long this can cause the wire rope to jump from the pulleys.

 

6/27/2016  Dan McDonald. Replacement motor was ordered from Beaver Industries Friday the 24th received this morning the 27th. Once received Travis wired the motor to its proper operating orientation. Once the motor was wired  it was  set it up and plugged it in to test rotation and control function, at this point we disconnected the motor and re installed it to the gear box. Ran three open close sequences to ensure all was well. In the case of the emergency cable system a plan is being developed to correct the cable slack and kinking problem. We went ahead and ordered a spare  vault motor which is located in the RH Machine Shop 