ID Date Author Category Type Module Target/Number Subjectdown
  1542   Thursday, May 18, 2017, 10:41 Travis CaveSpent Target VaultStandard Operation UC#19Spent Target move

The spent UC#19 target has been moved from the south hot cell into the spent target storage. It was placed in pail #145 and put in tray one spot C. See attached PDF for all vault details.

  1556   Monday, June 12, 2017, 13:51 Travis CaveSpent Target VaultStandard Operation  Spent Target move

The spent Ta#51 target has been moved from the south hot cell to the spent target vault. It was placed in pail#149 and put in spot 8B of the vault.

  1608   Wednesday, August 30, 2017, 11:37 Travis CaveSpent Target VaultStandard Operation Ta#52Spent Target move

The spent Ta#52 target has been moved from the south hot cell to the spent target vault. See attached PDF for details.

  1630   Thursday, September 28, 2017, 11:59 Travis CaveSpent Target VaultStandard Operation Ta#53Spent Target move

The spent Ta#53 has been moved to the spent target vault. See attached file for details.

  1650   Monday, October 23, 2017, 13:38 Travis CaveSpent Target VaultStandard Operation UC#21Spent Target move

The spent UC#21 has been moved from the south hot cell to the spent target vault. See attached for details

  1267   Tuesday, June 21, 2016, 13:47 Travis Cave/ Dan McDonaldSpent Target VaultRepair  Spent Target Vault Door

The spent target vault door does not open or close. The emergency door closing did have to be used to close the door as it was locked in an open position, the door stopped just off the open override limit. The door was closed and the spent target that was being assayed was placed into the mini storage. The problem with the door appears to be related to the motor itself, as all the controls to the motor appear to be in working order. Also it was noticed on the emergency door closing winch the wire rope has a kink in it from sitting in open position for so long this can cause the wire rope to jump from the pulleys.

 

6/27/2016  Dan McDonald. Replacement motor was ordered from Beaver Industries Friday the 24th received this morning the 27th. Once received Travis wired the motor to its proper operating orientation. Once the motor was wired  it was  set it up and plugged it in to test rotation and control function, at this point we disconnected the motor and re installed it to the gear box. Ran three open close sequences to ensure all was well. In the case of the emergency cable system a plan is being developed to correct the cable slack and kinking problem. We went ahead and ordered a spare  vault motor which is located in the RH Machine Shop 

  861   Friday, March 13, 2015, 13:36 Travis CaveSpent Target VaultStandard Operation ThO#1Spent Target Move

The ThO#1 has been placed in the storage vault placed in pail #122 in spot 2B of the vault. It was 6.2mSv/hr upon removal from the south hot cell. see attached PDF for details.

  864   Tuesday, March 17, 2015, 10:33 Travis CaveSpent Target VaultStandard Operation UC#11Spent Target Move

The spent UC#11 has benn moved from the south hot cell to the spent target vault. See attached PDF for details.

  1575   Thursday, June 29, 2017, 14:42 Travis CaveSpent Target VaultStandard Operation UC#20Spent Target Move

 The spent UC#20 has been moved from the south hot cell to the spent target vault. It was placed in pail #150 and spot 1B in the vault. See attached for details of the vault.

  1593   Thursday, August 03, 2017, 15:02 Travis CaveSpent Target VaultStandard Operation SiC#36Spent Target Move

 The spent SiC#36 has been moved from the south hot cell to the spent target vault.

  1660   Monday, November 13, 2017, 13:50 Travis CaveSpent Target VaultStandard Operation Ta#54Spent Target Move

 The spent Ta#54 target has been moved from the south hot cell to the spent target vault. It was placed in Pail #157 and put in spot #5B of the vault.

  1700   Monday, April 16, 2018, 14:51 Travis CaveSpent Target VaultStandard Operation Ta#55Spent Target Move

 Ta#55 has been moved from the south hot cell to the spent target vault. It was 30.4mSv/hr upon removal from the hotcell, placed in pail #161 and put in spot 7A of the vault.

  1725   Monday, May 28, 2018, 14:06 Travis CaveSpent Target VaultStandard Operation SiC#37Spent Target Move

 SiC#37 has been moved from the South Hot Cell to the Spent Target Vault. It was placed in Pail #165 and put in spot 3B of the vault and it measured 25.8mSv/hr upon removal from the hot cell. See the attached PDF for details

  1760   Tuesday, July 31, 2018, 11:16 Travis CaveSpent Target VaultStandard Operation UC#22Spent Target Move

 Yesterday the spent UC#22 target was moved from the south hot cell to the spent target vault. It was placed in pail #167 and placed in spot 4A see attached PDF for details.

  1762   Wednesday, August 01, 2018, 14:48 Travis CaveConditioning StationStandard OperationTM2UC#23Spent Target Move

 TM#2 with UC#23 has been moved from the south hot cell to the conditioning station.

  1765   Thursday, August 02, 2018, 14:12 Travis CaveSpent Target VaultStandard Operation Nb#8Spent Target Move

 The spent Nb#8 target was moved from the south hot cell to the spent target vault. It was placed in pail #168 and place in spot 2A in the vault. See the attached pdf for vault details.

  1773   Thursday, August 30, 2018, 11:13 Travis CaveSpent Target VaultStandard Operation Ta#56Spent Target Move

 Ta#56 has been moved from the south hot cell to the storage vault. It was placed in pail#169 and place in slot 2C of the vault. Also the vault is now full with 24 spent targets and can no longer accept any new targets. See the attached PDF for further details.

  1777   Thursday, September 06, 2018, 10:25 Travis CaveSpent Target VaultStandard Operation SiC#34, Ta#45,46,47, 50Spent Target Move

 Targets SiC#34 , Ta#45,46,47,50 have been moved from the spent target vault to the mini vault.

  1791   Monday, September 24, 2018, 14:50 Travis CaveSpent Target VaultStandard Operation UC#23Spent Target Move

 The spent UC#23 target has been moved from the south hot cell to the spent target storage. It was placed in pail #170 and place in spot #4B in the vault.

  1800   Friday, October 05, 2018, 14:41 Travis CaveSpent Target VaultStandard Operation UC#24Spent Target Move

 UC#24 has been moved from the south hot cell to the spent target vault. The target is in pail #171 and placed in spot 4C. See attached PDF for details.