2552
|
Thursday, March 21, 2024, 11:35 |
Ferran Boix Pamies | ITE | Development | | | Wiring of new thermocouple PLC module | Thursday, March 21, 2024, 11:33 Three
channels are available now for thermocouple
readouts from the Target multipin. Wiring |
|
2503
|
Monday, November 20, 2023, 12:28 |
Eric Lahe | South Hot-Cell | Maintenance | | | Light Bulb Replacement - South Hot Cell roof lights | 3 light bulbs replaced in the ISAC
South Hot Cell - North West light, South
west light, and South East light bulbs. Northeast |
|
2584
|
Tuesday, May 07, 2024, 12:39 |
Eric Lahe | Spent Target Vault | Repair | | | ISAC Storage Vault Re-alignment |
|
|
26
|
Thursday, September 01, 2011, 09:11 |
Don Jackson | ITW | Standard Operation | TM1 | UCx#2 | Argon Venting West Station | West target station is setup to use argon
for tank venting. There is 1200 PSI
remaining on argon bottle in electrical room. |
|
122
|
Friday, June 08, 2012, 15:00 |
Don Jackson | South Hot-Cell | Standard Operation | TM1 | Nb#6 | Electrical Check Nb#6 at end of run | Megger check values were low but still
within operational range. |
|
123
|
Friday, June 08, 2012, 15:03 |
Don Jackson | South Hot-Cell | Standard Operation | TM1 | Ta38 | Electrical Check on new Ta38 at hot cell | Megger checks were exceptionally high (good).
Readings taken less than 2 hours after reading low
values from end of run on Nb#6. Tests |
|
1667
|
Tuesday, December 19, 2017, 10:40 |
Don Jackson | Crane | Maintenance | | | Crane Power during winter break | The power to the crane and controls
were turned off using the power switch in
the Crane Control room. The main disconnect |
|
1993
|
Tuesday, October 01, 2019, 09:23 |
Don Jackson | ITE | Maintenance | TM2 | ZrC #8 | 60KV Common Connections | 1 Jumpers between 60KV common and FEBIAD
lines were connected in an unusual way.
This should of had no impact on the ZrC run |
|
46
|
Tuesday, November 01, 2011, 11:50 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 leak test on conditioning station | I did a leak check again on TM4 today.
This time, the leak detector pump to the
bottom on both base pressure(0.0xE-4 torr) |
|
60
|
Monday, November 21, 2011, 13:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 full leak check in conditioning station | TM1 full leak check in conditioning station
has been fulfilled this morning.Both air
to vacuum leak check and waterlines helium |
|
67
|
Monday, January 09, 2012, 14:44 |
David Wang | ITE | Maintenance | TM4 | | ITE and TM4 2012 winter shut down leak check is completed. | I did a vacuum leak check on all ITE primary
vacuum vessel and secondary vessel.I also
did a helium pressure test(80psi ) on all |
|
70
|
Thursday, January 12, 2012, 14:32 |
David Wang | ITE | Repair | TM4 | | TP2 on TM4 has been replaced | TP2 on TM4 has been replaced with a new
turbo pump , I didnt reset the controller
in electrical room.So this new pump start |
|
71
|
Monday, January 16, 2012, 09:30 |
David Wang | ITE | Maintenance | | | Changed all old inducion coils for flow sensors in ITE | I had changed all old induction coils for
flow sensors in ITE .I checked all ITE water
signals on control boards in electrical room.They |
|
72
|
Wednesday, February 01, 2012, 09:54 |
David Wang | ITW | Maintenance | TM1 | | ITW and TM1 winter shut down vacuum leak check | ITW and TM1 winter shut down vacuum leak
check had been finished yesterday.All ITW
primary vacuum vessel, secondary vacuum vessel, |
|
79
|
Monday, April 02, 2012, 08:17 |
David Wang | Conditioning Station | Development | | | conditioning station IMC pump down. | I pumped down conditioning station IMC
today. The inside bellow pressure is -20
psi on the gauge.Visually checked the bellow |
|
80
|
Tuesday, April 03, 2012, 12:11 |
David Wang | Conditioning Station | Development | | | leak check on conditioning station vacuum system | I did a leak check on conditioning station
vacuum system today.The vacuum system had
been roughed over night . This morning before |
|
81
|
Thursday, April 05, 2012, 10:30 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks back to ITE this morning. | MAA is secured .The ITE and MAA are
ready for taking proton beam now. |
|
83
|
Thursday, April 12, 2012, 14:40 |
David Wang | Conditioning Station | Development | TM1 | | conditioning staion and TM1 is under TP1 and TP2 pumping now. | TM1 moved to conditioning station to today.
After moving, I connected the vacuum system
which include all gauges ,vacuum lines , |
|
84
|
Friday, April 13, 2012, 12:31 |
David Wang | Conditioning Station | Development | TM1 | | TM1 and conditioning station leak check. |
Normal
0
|
|
89
|
Thursday, April 19, 2012, 09:48 |
David Wang | South Hot-Cell | Standard Operation | TM1 | LP SIS Nb 6 | leak check heat shield circuit | Chad and I did a leak check on TM1 Nb5
target heat shield circuit. The leak detector
was connected to heat shield circuit.The |
|