  204   Tuesday, November 06, 2012, 12:08 David WangITWStandard OperationTM1Nb#7TM1 disconnected in ITWBevan and I disconnected TM1 in ITW this
morning. The TM1 was moved to south hot cell
later.   
  
  213   Tuesday, November 13, 2012, 10:55 Travis CaveITWStandard OperationTM1TiC#3module moveTM#1 with TiC #3 moved from the conditioning
station to the west target station, 
move went well.
  
  214   Wednesday, November 14, 2012, 10:57 David WangITWStandard OperationTM1 TM1connected in ITWI connected TM1 in ITW yesterday. Everything
is good so far. Travis was with me when i
did the job.
  
  225   Wednesday, January 02, 2013, 12:11 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITW to block storage areaI moved 5 shielding blocks from ITW 
to block storage area for preparing the TM1
disconnection. Air sampled and swiped blocks
  
  226   Thursday, January 03, 2013, 10:05 David WangITWStandard OperationTM1 Disconnected TM1 in ITW.TM1 has been disconnected in ITW. All 
water lines had been purged. Travis was with
me during the job.
  
  229   Thursday, January 10, 2013, 10:40 David WangITWMaintenance  Replaced all high active water system magnetic pedal wheels in ITW and ITE.I replaced all high active water system
magnetic pedal wheels in ITW and ITE. This
is a preventive maintenance job we planned
  
  230   Monday, January 14, 2013, 14:09 Travis CaveITWStandard OperationTM1no targetmodule moveTM#1 has been moved from the south hot
hell to the west target station, move went
well.
  
  231   Tuesday, January 15, 2013, 10:49 David WangITWStandard OperationTM1no targetTM1 vacuum system connection in ITWI connected TM 1 vacuum system in ITW.
The TM1 and ITW will be pumped out for shut
down routine leak check.
  
  240   Thursday, January 24, 2013, 13:30 David WangITWStandard OperationTM1 ITW-TM1 2013 winter shut down leak check.2013 winter shut down ITW-TM1 primary vacuum
vessel, secondary vacuum vessel, and water
lines leak check: connected leak detector
  
  244   Thursday, February 14, 2013, 09:31 David WangITWRepair  ITH MP1 is replaced.Edi and I replaced the broken ITH MP1 in
target hall with a new pump. The old pump
was leak on oil. There were no oil had been
  
  245   Thursday, February 21, 2013, 14:05 David WangITWRepairTM1 Disconnected EXIT1 in ITW.Disconnected EXIT1 in ITW. All cables ,
wires and air lines are label marked.
  
  248   Tuesday, February 26, 2013, 10:26 Travis CaveITWStandard OperationTM1 module moveTM1 moved from the west station to the
southwest silo. Move went well.
  
  252   Wednesday, March 06, 2013, 10:09 Travis CaveITWMaintenance  module moveITW EX1 has been moved from the west target
station to the south hot cell for the seal
replacement on the west station.
  
  254   Wednesday, March 06, 2013, 14:12 David WangITWRepair  ITW EXIT1 tank to module o-ring replacement ITW
EXIT1  o-ring replacement is fininshed today.
The ITW EXIT 1 is back to ITW. The old o-ring
  
  295   Friday, April 12, 2013, 10:27 David WangITWStandard OperationTM1 I reconnected TM1 to ITW.TM1 has been reconnected in ITW. Water
interlock check for TM1 is done.
  
  296   Friday, April 12, 2013, 10:32 David WangITWRepairTM1 ITW EXIT1 tank to module o-ring leak check.I leak checked new installed ITW EXIT1
tank to module o-ring.No leak had been found
. Also ,TM1 primary vessel air to vacuum
  
  331   Tuesday, May 07, 2013, 12:07 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITE to ITW.Water interlock check  on ITW is done.
All water signals are strong on EL panel. 
ITW is configured to take proton beam.
  
  376   Tuesday, June 11, 2013, 10:05 David WangITWStandard OperationTM1 Disconnected TM1 in ITW.Dan and I  disconnected TM1 in ITW.   
  396   Thursday, July 04, 2013, 11:37 David WangITWStandard OperationTM1UCxI reconnected TM1 to ITW. I  reconnected TM1 to ITW on
02 July.The pumping down is good so far.
TM1 water interlock check is good also.
  
  399   Tuesday, July 09, 2013, 14:26 David WangITWStandard OperationTM1UCx5 shielding blocks had been transferred from ITE to ITW5 shielding blocks had been  transferred
from ITE to ITW.  The  ITW is configured
to take proton beam.
  