2804
|
Tuesday, May 13, 2025, 13:12 |
Frank Song | MAA | Repair | | | Swap out the target hall alpha CAM. |
|
|
2805
|
Tuesday, May 13, 2025, 13:13 |
Frank Song | MAA | Repair | | | Swap out the target hall alpha CAM. | AlphaCAM has been replaced and tested by
RPG in MAA target hall. (per Document-154779)
WorkPermit # I2025-05-13-3 |
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer | 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving. |
|
2706
|
Tuesday, October 15, 2024, 12:57 |
Frank Song | ITW/ITE | Standard Operation | | | shielding blocks transfer | 5 shielding blocks are transferred
from ITW to ITE, Target Area is secured again
after moving. |
|
2768
|
Friday, February 14, 2025, 10:43 |
David Wang | ITW/ITE | Standard Operation | | | target pit CAD filter replacement in TH. | Plant Group Gabril.T organized a target
pit CAD filter replacement and testing yesterday.
My group helped on this job. small |
|
18
|
Wednesday, August 03, 2011, 11:24 |
Travis Cave | ITW | Standard Operation | TM1 | Ta#37 | Module move | TM#1 with Ta#37 has been moved from the
conditioning station to the the west target
station, move went well. |
|
19
|
Wednesday, August 17, 2011, 13:09 |
Bevan Moss | ITW | Standard Operation | TM1 | Ta #37 | TM1 move from ITW to Hot Cell | TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during |
|
26
|
Thursday, September 01, 2011, 09:11 |
Don Jackson | ITW | Standard Operation | TM1 | UCx#2 | Argon Venting West Station | West target station is setup to use argon
for tank venting. There is 1200 PSI
remaining on argon bottle in electrical room. |
|
32
|
Monday, October 03, 2011, 11:00 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#2 | Move from west station to south hot cell | TM#1 with UCx#2 has been moved from the
west station to the south hot cell. Move
went well. |
|
35
|
Tuesday, October 04, 2011, 14:13 |
Travis Cave | ITW | Standard Operation | TM1 | TaC#1 | Move ot TM#1 | Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station. |
|
50
|
Monday, November 14, 2011, 14:07 |
Travis Cave | ITW | Standard Operation | TM1 | TaC#1 | Module move | TM#1 with TaC#1 from the west target station
to the south hot cell. Move went well. |
|
62
|
Thursday, November 24, 2011, 10:39 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#3 | Module move | TM#1 with UCx#3 moved from conditioning
station to west target station. Move went
well. |
|
63
|
Thursday, November 24, 2011, 10:40 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#3 | Module move | TM#1 with UCx#3 moved from the conditioning
station to the west target station. |
|
72
|
Wednesday, February 01, 2012, 09:54 |
David Wang | ITW | Maintenance | TM1 | | ITW and TM1 winter shut down vacuum leak check | ITW and TM1 winter shut down vacuum leak
check had been finished yesterday.All ITW
primary vacuum vessel, secondary vacuum vessel, |
|
92
|
Tuesday, April 24, 2012, 10:02 |
Travis Cave | ITW | Standard Operation | TM1 | Nb#6 | module move | TM#1 with Nb#6 from the conditioning station
to the west target station, move was uneventful.
Mike LaRoss was there today for move in place |
|
97
|
Wednesday, May 02, 2012, 11:27 |
David Wang | ITW | Standard Operation | TM1 | | ITW is ready for taking proton beam. | I moved 5 shielding blocks from ITE
to ITW . I checked all ITW water
signals strength and frequency in electrical |
|
116
|
Tuesday, June 05, 2012, 15:06 |
Bevan Moss | ITW | Standard Operation | TM1 | Nb#6 | Module move from ITW to SHC | TM1 has been moved from ITW to the
SHC. The move did encounter some issues,
one of the railings for preventing people |
|
117
|
Wednesday, June 06, 2012, 08:21 |
David Wang | ITW | Standard Operation | TM1 | | TM1 disconnected in ITW | I disconnected TM1 in ITW yesterday morning.The
general radioactive level in ITW over the
TM top (300mm) is about 350 usv/hr. contacting |
|
127
|
Tuesday, June 19, 2012, 10:35 |
Travis Cave | ITW | Standard Operation | TM1 | Ta#38 | module move | TM#1 with Ta#38 moved from the conditioning
station to the west target station. Move
went well. |
|
128
|
Tuesday, June 19, 2012, 16:18 |
David Wang | ITW | Standard Operation | TM1 | Ta38 | TM1connected in ITW |
Normal
0
|
|