Friday, May 23, 2025, 13:12, chad fisher, Manipulator Maintenance, Repair, , , SHC West manipulator tong cable replacement
|
Broken tong cable on West manipulator (serial #8106) replaced.
Wrist joint with broken cable was replaced with the spare wrist joint, pre-strung with a new tong cable. Tong cable is routed the "new"
way (as described in April 3, 2024 wrist replacement), over the interior spacer. |
Thursday, May 23, 2024, 11:10, David Wang, MAA, Standard Operation, , , BL2A MAA ASU test.
|
MCR Travis Curucz and I finished BL2A MAA ASU test per document 154779. everything works fine. Travis kept the test document. |
Tuesday, May 13, 2025, 13:12, Frank Song, MAA, Repair, , , Swap out the target hall alpha CAM.
|
|
Tuesday, May 13, 2025, 13:13, Frank Song, MAA, Repair, , , Swap out the target hall alpha CAM.
|
AlphaCAM has been replaced and tested by RPG in MAA target hall. (per Document-154779)
WorkPermit # I2025-05-13-3 |
Monday, August 19, 2024, 15:29, Frank Song, ITW/ITE, Standard Operation, TM2, Ta#67, shielding blocks transfer
|
5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving. |
Tuesday, October 15, 2024, 12:57, Frank Song, ITW/ITE, Standard Operation, , , shielding blocks transfer
|
5 shielding blocks are transferred from ITW to ITE, Target Area is secured again after moving. |
Friday, February 14, 2025, 10:43, David Wang, ITW/ITE, Standard Operation, , , target pit CAD filter replacement in TH.
|
Plant Group Gabril.T organized a target pit CAD filter replacement and testing yesterday. My group helped on this job. small 3T hoist was used
for the job.Still the filter needs to be pushed manually on crane to south into position because of crane access limit on south. The replacement
job went well. Later, Gabril reported his test result is good as well. |
Wednesday, August 03, 2011, 11:24, Travis Cave, ITW, Standard Operation, TM1, Ta#37, Module move
|
TM#1 with Ta#37 has been moved from the conditioning station to the the west target station, move went well. |
Wednesday, August 17, 2011, 13:09, Bevan Moss, ITW, Standard Operation, TM1, Ta #37, TM1 move from ITW to Hot Cell
|
TM1 with Ta #37 target was moved from ITW to the south hot cell. The rotation of TM1 may have been off slightly during the final removal from ITW
but it was minimal. Entry into the south hot cell went with out incident. This was my first time moving the module without the presence of Travis Cave. |
Thursday, September 01, 2011, 09:11, Don Jackson, ITW, Standard Operation, TM1, UCx#2, Argon Venting West Station
|
West target station is setup to use argon for tank venting. There is 1200 PSI remaining on argon bottle in electrical room. That is sufficent
for venting west target station to atmosphere twice. ISAC Operations has been previousily contacted and their procedures for venting remain the same
except that they can not rely on ITW:CG4S to determine when at atmospheric pressure. I have asked them to contact me if an unscheduled vent is required. |
Monday, October 03, 2011, 11:00, Travis Cave, ITW, Standard Operation, TM1, UCx#2, Move from west station to south hot cell
|
TM#1 with UCx#2 has been moved from the west station to the south hot cell. Move went well. |
Tuesday, October 04, 2011, 14:13, Travis Cave, ITW, Standard Operation, TM1, TaC#1, Move ot TM#1
|
Move of TM#1 with the TaC#1 target has been moved from the south hot cell to the west target station. |
Monday, November 14, 2011, 14:07, Travis Cave, ITW, Standard Operation, TM1, TaC#1, Module move
|
TM#1 with TaC#1 from the west target station to the south hot cell. Move went well. |
Thursday, November 24, 2011, 10:39, Travis Cave, ITW, Standard Operation, TM1, UCx#3, Module move
|
TM#1 with UCx#3 moved from conditioning station to west target station. Move went well. |
Thursday, November 24, 2011, 10:40, Travis Cave, ITW, Standard Operation, TM1, UCx#3, Module move
|
TM#1 with UCx#3 moved from the conditioning station to the west target station. |
Wednesday, February 01, 2012, 09:54, David Wang, ITW, Maintenance, TM1, , ITW and TM1 winter shut down vacuum leak check
|
ITW and TM1 winter shut down vacuum leak check had been finished yesterday.All ITW primary vacuum vessel, secondary vacuum vessel, and TM1water lines
had been leak checked.No any leak has been found .The ITW and TM1 are both leak tight.Some detail information below:
TM1 and ITW primary vacuum vessel and water lines: The leak detector was hooked on BV2 after TP2. Calibrate leak detector.leak |
Tuesday, April 24, 2012, 10:02, Travis Cave, ITW, Standard Operation, TM1, Nb#6, module move
|
TM#1 with Nb#6 from the conditioning station to the west target station, move was uneventful. Mike LaRoss was there today for move in place of Don Dale
working the PLC. |
Wednesday, May 02, 2012, 11:27, David Wang, ITW, Standard Operation, TM1, , ITW is ready for taking proton beam.
|
I moved 5 shielding blocks from ITE to ITW . I checked all ITW water signals strength and frequency in electrical room, and everything
looks fine.The ventilation system is set up for ITW. MAA is locked. ITW is ready for taking proton beam. |
Tuesday, June 05, 2012, 15:06, Bevan Moss, ITW, Standard Operation, TM1, Nb#6, Module move from ITW to SHC
|
TM1 has been moved from ITW to the SHC. The move did encounter some issues, one of the railings for preventing people from falling into the MAA
was hit with the containment box. This caused the module to rotate. The module rotated ~90 degrees before the problem was noticed. The module was backed
off from the post once noticed but had already freely rotated. The box was inspected with the cameras prior to being inserted into the SHC. No damage was |
Wednesday, June 06, 2012, 08:21, David Wang, ITW, Standard Operation, TM1, , TM1 disconnected in ITW
|
I disconnected TM1 in ITW yesterday morning.The general radioactive level in ITW over the TM top (300mm) is about 350 usv/hr. contacting level on TP1
and TP2 are 1.0-1.2 msv/hr. I took 0.22 msv dose .The module is moved to
south hot cell later and a shielding plug is put back to ITW. Everything is fine. |
|