2789
|
Friday, April 11, 2025, 13:34 |
chad fisher | North Hot-Cell | Repair | | | remote end 9342 installed | On March 27 remote end 9342 was installed
on the west position (right hand as viewed
by operator) and arm 9764 removed and moved |
|
2790
|
Friday, April 11, 2025, 13:46 |
chad fisher | North Hot-Cell | Repair | | | Remote end 9**4 repair | Tong cable on remote arm 9**4 has be relocated
onto its pulleys and tong opening adjusted
at the tong cable drum by changing the position |
|
2791
|
Wednesday, April 23, 2025, 14:08 |
Adam Newsome | North Hot-Cell | Standard Operation | TM4 | | TM4 Module Move | TM4 was moved from Safe Module Parking
to the North Hot Cell today. |
|
2792
|
Thursday, April 24, 2025, 11:13 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#48 | electrical check/leak check | TM4 with new target UCx#48 installed
was E/L checked on the top of NHC, see attachment
uploaded with pls. |
|
2794
|
Thursday, April 24, 2025, 12:53 |
Aaron Tam | North Hot-Cell | Standard Operation | TM4 | UC#48 | UC#48 IGLIS Install onto TM4 | C. Fisher, A. Schmidt, A. Tam
UC#48 Handover satisfactory
Target taken out of glovebox |
 |
2798
|
Friday, May 02, 2025, 10:16 |
Aaron Tam | North Hot-Cell | Maintenance | | | NHC Window Oil Fill | Findings
During April 2025 safety
walk ID: 2796 , it was noted that the |
10x |
2799
|
Monday, May 05, 2025, 09:18 |
chad fisher | North Hot-Cell | Maintenance | | | Manipulator Remote End Replacement 9352 with 9764 | Remote end 9352 replaced with end 9764
due to signs of an issue with the tong cable
(tong opening excessively large and slack |
|
2801
|
Tuesday, May 06, 2025, 14:40 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UC#49 | electrical check/leak check | TM2 with new target UC#49 installed
is E/L checked on the flange of NHC in TH.
see attachment for detail. |
|
2682
|
Monday, September 16, 2024, 08:48 |
chad fisher | Manipulator Maintenance | Maintenance | | | CRL Technicain Manipulator Maitenance Trip | Over the course of September 9th - September
13, 2024 a CRL manipulator technician carried
out the following manipulator maintenance: |
|
2598
|
Thursday, May 23, 2024, 11:10 |
David Wang | MAA | Standard Operation | | | BL2A MAA ASU test. | MCR Travis Curucz and I finished BL2A MAA
ASU test per document 154779. everything
works fine. Travis kept the test document. |
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer | 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving. |
|
2706
|
Tuesday, October 15, 2024, 12:57 |
Frank Song | ITW/ITE | Standard Operation | | | shielding blocks transfer | 5 shielding blocks are transferred
from ITW to ITE, Target Area is secured again
after moving. |
|
2768
|
Friday, February 14, 2025, 10:43 |
David Wang | ITW/ITE | Standard Operation | | | target pit CAD filter replacement in TH. | Plant Group Gabril.T organized a target
pit CAD filter replacement and testing yesterday.
My group helped on this job. small |
|
18
|
Wednesday, August 03, 2011, 11:24 |
Travis Cave | ITW | Standard Operation | TM1 | Ta#37 | Module move | TM#1 with Ta#37 has been moved from the
conditioning station to the the west target
station, move went well. |
|
19
|
Wednesday, August 17, 2011, 13:09 |
Bevan Moss | ITW | Standard Operation | TM1 | Ta #37 | TM1 move from ITW to Hot Cell | TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during |
|
26
|
Thursday, September 01, 2011, 09:11 |
Don Jackson | ITW | Standard Operation | TM1 | UCx#2 | Argon Venting West Station | West target station is setup to use argon
for tank venting. There is 1200 PSI
remaining on argon bottle in electrical room. |
|
32
|
Monday, October 03, 2011, 11:00 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#2 | Move from west station to south hot cell | TM#1 with UCx#2 has been moved from the
west station to the south hot cell. Move
went well. |
|
35
|
Tuesday, October 04, 2011, 14:13 |
Travis Cave | ITW | Standard Operation | TM1 | TaC#1 | Move ot TM#1 | Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station. |
|
50
|
Monday, November 14, 2011, 14:07 |
Travis Cave | ITW | Standard Operation | TM1 | TaC#1 | Module move | TM#1 with TaC#1 from the west target station
to the south hot cell. Move went well. |
|
62
|
Thursday, November 24, 2011, 10:39 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#3 | Module move | TM#1 with UCx#3 moved from conditioning
station to west target station. Move went
well. |
|