Entry  Tuesday, August 29, 2023, 14:32, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#65, electrical check/leak check TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
 TM4 with new target Ta#65 has been E/L checked at NHCPost.
Entry  Thursday, June 27, 2024, 09:49, David Wang, North Hot-Cell, Standard Operation, , Nb#10, Nb#10target has been remotely transferred from NHC to SHC.  
Nb#10target has been remotely  transferred from NHC to SHC.  
Entry  Wednesday, September 11, 2024, 13:38, Adam Newsome, North Hot-Cell, Repair, , , Spare Manipulator - Y-axis motion not functioning 
Update 2024-09-12: C. Fisher confirms this is actually normal behaviour. The Y-axis motion is inhibited when X and Z
are in a certain configuration, which was true when the manipulator was mounted on the wall in storage position. Non-issue. A note about this has been
made in the operator manual.
Entry  Monday, September 16, 2024, 08:23, chad fisher, North Hot-Cell, Repair, , , Model N Remote end #9352 reapir 
On Friday, September 6, 2024 Model 'N' remote arm #9352 was removed from the NHC right side installed position to investigate  an ongoing issue
with the tong motion circuit (no motion on the remote side when handle on operator side operated).
Inspection revealed that the tong cable on this arm have hopped its cable drum and rapped around the shaft of the cable drum. As well, the tong
Entry  Wednesday, January 29, 2025, 11:39, chad fisher, North Hot-Cell, Repair, , , Model N Remote Arm #9342 Tong Cable Model_N_Pulley_3D.JPG
Model N remote arm serial #9342 tong cable has been un-jammed from between pulley 3D (see picture) and casting (this is an ongoing issue with #9342 and
9352) and cable restrung and exercised to check motion. Tong system is now functional but exhibits excessive slack. Next step will be to check tension
of the elevation/twist cables and adjust the pulley block if required (this pulley block houses both the elevation twist cable pulleys and the tong cable
Entry  Tuesday, April 01, 2025, 09:47, Frank Song, North Hot-Cell, Repair, , , Two NHC light bulbs replacement Image_(3).jpgImage_(4).jpgImage_(5).jpgImage_(6).jpgImage_(7).jpg
2 broken lights of NHC were replaced in Target Hall. see pics attached.
Entry  Friday, April 11, 2025, 13:34, chad fisher, North Hot-Cell, Repair, , , remote end 9342 installed 
On March 27 remote end 9342 was installed on the west position (right hand as viewed by operator) and arm 9764 removed and moved to anteroom.
Previous to this installation, arm 9342 received tensioning of the elevation twist pulley block and tightening of the tong cable opening via the
tong cable drum. Tong opening was reduced to roughly 2" to achieve tension in the tong cable such that slack upon release of the system was reduced
Entry  Friday, April 11, 2025, 13:46, chad fisher, North Hot-Cell, Repair, , , Remote end 9**4 repair 
Tong cable on remote arm 9**4 has be relocated onto its pulleys and tong opening adjusted at the tong cable drum by changing the position of the tong
cable screws by two positions (tightened/closed) such that the air tool will fit in the tong and some of the slack in the tong system has been taking up.
An attempt was made to also adjust the elevation twist pulley block which would also aid in taking up slack in the tong system however, the elevation
Entry  Wednesday, April 23, 2025, 14:08, Adam Newsome, North Hot-Cell, Standard Operation, TM4, , TM4 Module Move 
TM4 was moved from Safe Module Parking to the North Hot Cell today. 
Entry  Thursday, April 24, 2025, 11:13, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#48, electrical check/leak check TM4_electric_and_leak_checked_after_UCx#48_IG-LIS_installed_in_NHC_2025-04-23.pdf
 TM4 with new target UCx#48 installed was E/L checked on the top of NHC, see attachment uploaded with pls.
Entry  Thursday, April 24, 2025, 12:53, Aaron Tam, North Hot-Cell, Standard Operation, TM4, UC#48, UC#48 IGLIS Install onto TM4 Misaligned_target_leg.jpg86b48e1a-3507-4650-864b-841e638ab62e.jpg
C. Fisher, A. Schmidt, A. Tam
UC#48 Handover satisfactory

    Target taken out of glovebox and tested for fit
    The left most triplet conductor leg was seen to be slightly misaligned,
Entry  Friday, May 02, 2025, 10:16, Aaron Tam, North Hot-Cell, Maintenance, , , NHC Window Oil Fill 12x
Findings

    During April 2025 safety walk ID: 2796 , it was noted that the oil level in NHC window oil expansion tank was below the indicator
range.
    previous safety walks from July, October, Jan 2024 did not show any issues, but this was not a recorded item, only to check for leaks 
Entry  Monday, May 05, 2025, 09:18, chad fisher, North Hot-Cell, Maintenance, , , Manipulator Remote End Replacement 9352 with 9764 
Remote end 9352 replaced with end 9764 due to signs of an issue with the tong cable (tong opening excessively large and slack in cable on one side).
Upon replacement tong opening on 9764 also opened larger then the remote end was set to. Everything is operational but this phenomenon indicates the handle
cable system on operator side must be where the excess is coming for. This is further indicted but the position of the locking screw on the handle cable
Entry  Tuesday, May 06, 2025, 14:40, Frank Song, North Hot-Cell, Standard Operation, TM2, UC#49, electrical check/leak check TM2_with_UC#49_electric_check_on_NHC_2025-05-06.pdf
 TM2 with new target UC#49 installed is E/L checked on the flange of NHC in TH. see attachment for detail.
Entry  Wednesday, May 07, 2025, 13:41, Aaron Tam, North Hot-Cell, Standard Operation, TM2, UC#49 , UC#49 SIS w/ Gasline Install Cable_hopped_on_East_Manip.jpgunsuccessful_method_1.jpgunsuccessful_method_2.jpgGasline_Gasket_installed.jpg
May 7th, 2025 - Aaron Schmidt, Aaron Tam 
UC#49 Handover - good

    April 30th - Initial fit check was performed
Entry  Tuesday, June 17, 2025, 11:32, Adam Newsome, North Hot-Cell, Standard Operation, TM4, UC#48, Module move 
TM#4 with UC#48 was moved from the East target station to the North Hot Cell for target exchange. 
Reading at ITE = 36 mSv/h
Reading at NHC = 133 mSv/h
Entry  Tuesday, June 17, 2025, 12:59, Frank Song, North Hot-Cell, Standard Operation, TM4, C#5, electrical check/leak check TM4_electric_and_leak_check_after_C#5_installed_2025-06-17.pdf
 TM4 with new target number C#5 installed had been leak/electric checked on NHC flange in TH. see pic attached with pls.
Entry  Wednesday, June 18, 2025, 11:23, Aaron Tam, North Hot-Cell, Standard Operation, TM4, UC#48 Pail#303, UC#48 Removal from TM4, PIE, Spent Target Pail Loading 14x
 June 17th, 2025 - Aaron Tam, Brady Borrmann, David Wang, Travis Cave
UC#48 Removal 10:20am - 11:35am

    Upon loosening of right-side water line, some leakage was observed (photos attached)
    
        As soon as this was noticed,
Entry  Wednesday, June 18, 2025, 11:32, Aaron Tam, North Hot-Cell, Standard Operation, TM4, C#5 SIS , C#5 Installation 9x
June 17, 2025 - Aaron Tam, Brady Borrmann, David Wang
Target handover 8:30am

    Checks were made a day prior to insertion to leave time for adjustments
    Lower conductor leg holes were ovalized and aligned
Entry  Monday, September 16, 2024, 08:48, chad fisher, Manipulator Maintenance, Maintenance, , , CRL Technicain Manipulator Maitenance Trip Triumf_Document_2024-09-20_102936.pdf
Over the course of September 9th - September 13, 2024 a CRL manipulator technician carried out the following manipulator maintenance:
NHC operator side arm #9763 (right side installed position) - Inspection and re-tensioning of tong cable prior to re-installation (was a little
too tight). Operational.