  202   Tuesday, November 06, 2012, 11:06 Travis CaveITWStandard OperationTM1Nb#7module move

TM#1 with Nb#7 has been moved from the west target station to the south hot cell move went well.

  204   Tuesday, November 06, 2012, 12:08 David WangITWStandard OperationTM1Nb#7TM1 disconnected in ITW

Bevan and I disconnected TM1 in ITW this morning. The TM1 was moved to south hot cell later.   

  210   Thursday, November 08, 2012, 09:37 chad fisherSouth Hot-CellStandard OperationTM1Nb#7Nb#7 Autopsy

Nb#7 was dismantled and ready for inspection.

  212   Friday, November 09, 2012, 14:35 Travis CaveSpent Target VaultStandard Operation Nb#7Spent target move

Nb#7 was moved from the south hot cell to the target storage vault. The target was placed in pail #103 in slot 6A of the vault and had a reading of 178 mSv/hr upon removal from the south hot cell. See attached PDF for full vault details.

  86   Tuesday, April 17, 2012, 10:15 chad fisherSouth Hot-CellStandard OperationTM1Nb#6Target inserted into south hot cell

Nb#6 has been inserted into the south hot cell in preparation for ionstallation onto TM1. During the pre-insertion inspection I noticed that I could see the foil installed into the ionizer tube and that in did not seem to be seated or concentric to the tube itself. I had Anders and Friedhelm check this and they deemed that it was ok.

  88   Thursday, April 19, 2012, 09:36 Travis CaveSouth Hot-CellStandard OperationTM1Nb#6Electrical check

Electrical check has been completed of TM#1 with Nb#6 attached. Our new micro-ohm meter was also used for the first time for this test.

  90   Friday, April 20, 2012, 14:07 Travis CaveConditioning StationStandard OperationTM1Nb#6module move

TM#1 with Nb#6 is now in the conditioning station. The fields of the module at the south cell was 15.8mSv/hr. The move was uneventful. Don Dale was present for the move locking out parts of the code so only one movement of the crane could be done at a time.

  92   Tuesday, April 24, 2012, 10:02 Travis CaveITWStandard OperationTM1Nb#6module move

TM#1 with Nb#6 from the conditioning station to the west target station, move was uneventful. Mike LaRoss was there today for move in place of Don Dale working the PLC.

  93   Tuesday, April 24, 2012, 10:36 Bevan MossConditioning StationStandard OperationTM1Nb#6HV test April 23

 A HV test was complete on TM1 with Friedhelm, David, and Myself. The module behaved as it has in other tests. The vacuum achieved was 1.6 x 10^-6 in the diagnostics box, 2.3 x 10^-6 in the containment box, and 8.6 x 10^-7 in the service cap. Maximum voltage without continuous sparking achieved was 27kV. Current was unstable varrying from 40 to 300 uA. This voltage was held for 10 minutes. 

  116   Tuesday, June 05, 2012, 15:06 Bevan MossITWStandard OperationTM1Nb#6Module move from ITW to SHC

 TM1 has been moved from ITW to the SHC. The move did encounter some issues, one of the railings for preventing people from falling into the MAA was hit with the containment box. This caused the module to rotate. The module rotated ~90 degrees before the problem was noticed. The module was backed off from the post once noticed but had already freely rotated. The box was inspected with the cameras prior to being inserted into the SHC. No damage was detected. The error came as a result of over confidence. It did appear it was going to be hit but as the module moved closer I believed that there would be clearance. The angle of the camera has caused the module to appear it was going to hit thing before in the past but it actually (once the module was closer to the object) had several feet of clearance. This is not a mistake I will make again.

Chad Fisher, Grant Minor, and Don Jackson, have been alerted about this. Chad will complete another visual inspection in the hot cell. David will take swipes of the pole to ensure there is no contamination. 

  122   Friday, June 08, 2012, 15:00 Don JacksonSouth Hot-CellStandard OperationTM1Nb#6Electrical Check Nb#6 at end of run

Megger check values were low but still within operational range.

  124   Monday, June 11, 2012, 10:52 Travis CaveSpent Target VaultStandard Operation Nb#6Spent target move

The Nb#6 target has been moved from the south hot cell into storage. It was place in pail #95 and is in slot 5C of the vault. See attached file for more details.

  2165   Wednesday, November 18, 2020, 15:28 David WangSouth Hot-CellStandard OperationTM2Nb#6electrical check and HS leak check.

Everything looks good. A still short to P before target installation. We will float P,Q as before on module top.

  2166   Thursday, November 19, 2020, 09:00 David WangConditioning StationStandard OperationTM2Nb#6Helium pressure check on TM2 HS line at TCS.

LD 0.0 Xe-9 atm.cc/sec , 70 psi helium 3 minutes.  No leak.

  2480   Monday, August 28, 2023, 12:16 Frank SongNorth Hot-CellRepairTM2Nb#11electric/leak check

 TM2 with new target Nb#11 has been E/L checked sitting on NHC.

  2481   Tuesday, August 29, 2023, 09:07 Frank SongITWRepairTM2Nb#11electrical check

 TM2 with new target Nb#11 replaced has been electric checked one more time in ITW.

  2482   Tuesday, August 29, 2023, 09:28 Frank SongITWRepairTM2Nb#11Module Connection

 Module was connected yesterday and all turbo pumps are running at their top speed. 

  2490   Tuesday, October 03, 2023, 07:56 Frank SongITWStandard OperationTM2Nb#11module disconnection

 TM2 with target Nb#11 has been disconneted in ITW. The HS line was purged with Nitrogen in station. 

  2491   Tuesday, October 03, 2023, 14:28 Frank SongSouth Hot-CellStandard OperationTM2Nb#11electrical check

 An electric checked right after TM2 was moved from ITW. 

  2494   Friday, October 06, 2023, 10:47 Travis CaveSpent Target VaultStandard Operation Nb#11Spent Target Move

 The spent Nb#11 target was removed from the south hot cell and place in the spent target vault. It was placed in pail #283 and place in spot 7B is was 65.7mSv/hr upon removal. see pdf for further vault details.