  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  548   Tuesday, November 19, 2013, 10:52 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2module moveTM#3 with NiO#2 moved from ITE to the south
hot cell.
  
  551   Wednesday, November 20, 2013, 08:50 chad fisherSouth Hot-CellStandard OperationTM3NiO#2NiO#2 removedNiO#2 has been removed from TM3  TM3_20131120.jpgTM3_20131120_2.jpg 
  554   Thursday, November 21, 2013, 12:12 Anders MjosSouth Hot-CellStandard OperationTM3NiO#2End of beam target inspection - ANODE does not hold 250VThe target was inspected by Chad and Anders
in the Hot Cell. Electrical megger tests
were done during the assembly. It was found
  
  555   Friday, November 22, 2013, 10:29 Travis CaveSpent Target VaultStandard Operation NiO#2Spent target moveNiO#2 has been moved from the south hot
cell into spent target storage. It was placed
in pail 111 in slot 3C of the storage vault.
 Vault_Storage_November_22_2013.pdf 
  169   Wednesday, September 05, 2012, 11:55 Travis CaveConditioning StationStandard OperationTM4NiO#1module moveTM#4 with NiO#1 has been moved from the
south hot cell to the conditioning station.
Move went well.
  
  171   Wednesday, September 05, 2012, 14:40 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical checkSee attached PDF for details. 60kV Common
to the target is low at 343k but I've been
told will work. Test will be done again on
 TM#4_NiO#1.PDF 
  174   Friday, September 07, 2012, 10:37 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical checkElectrical check of the TM#4 with NiO#1
was done again today. see attached file for
results.
 TM#4_NiO#1a.PDF 
  193   Tuesday, October 09, 2012, 11:17 Bevan MossITEStandard OperationTM4NiO#1Module Move TM4 with NiO#1 was moved from ITE
to the SHC today. The move went well with
no issues.
  
  198   Wednesday, October 24, 2012, 11:53 Travis CaveSpent Target VaultStandard Operation NiO#1Spent target moveThe NiO #1 spent target was placed into
storage today. It is in pail number 01 (101
on Vault Status page) and located in slot
 Vault_Storage_October_24_2012.pdf 
  168   Tuesday, September 04, 2012, 14:34 David WangSouth Hot-CellStandard OperationTM4NiO #1TM4 heat shield circuit leak check with NiO#1 targetChad and i did a leak check on TM4 heat
shield circuit with new NiO#1 target installed.
It took about 40 mins(much longer than usual)
  
  170   Wednesday, September 05, 2012, 14:36 chad fisherSouth Hot-CellStandard OperationTM4NiO #1UOx removal NiO installationUOx was removed from TM4 yesterday and
NiO#1 installed.
Video was taken.
  
  172   Friday, September 07, 2012, 08:54 David WangConditioning StationStandard OperationTM4NiO #1TM4 NiO #1 target heat shield helium pressure check is done.leak detector pumped down to 0.0xE-9 atm.cc/sec,
and 0.0xE-4 torr. All high vacuum gauge readings
at CS and TM4 are at low -6 range from 2.2xE-6torr
  
  175   Wednesday, September 12, 2012, 07:00 David WangITEStandard OperationTM4NiO #1ITM4 in ITE connected and pumping downTM4 had been connected in ITE. Six turbo
pump had been started . thepumpming diwn
is very good so far. The water interlock
  
  192   Tuesday, October 09, 2012, 10:35 David WangITEStandard OperationTM4NiO #1Disconnected TM4 in ITE.I disconnected TM4 in ITE this morning.
The heat shield circuit has been purged with
air.
  
  2169   Tuesday, November 24, 2020, 12:56 David WangITWStandard OperationTM2Nb#9TM2 has been connected in ITWTM2 has been connected to ITW. Turbo pumps
are stared. ITW pumping down is fine so far.
 TM2_Nb#9_module_connection_checklist.pdf 
  2178   Monday, January 18, 2021, 12:29 David WangITWStandard OperationTM2Nb#9ITW vacuum and TM2 water lines leak check .ITW primary and secondary vacuum vessel
leak check are done. There is a 5XE-8 atm.cc/sec
leak on Exit service cap NW side square panel. 
  
  2179   Tuesday, January 19, 2021, 11:32 Travis CaveSafe Module ParkingStandard OperationTM2Nb#9Module move TM#2 with Nb#9 was moved from ITW
to SHC and then with no target it was moved
from the SHC to the SMP.
  
  1747   Friday, June 29, 2018, 13:36 Travis CaveSouth Hot-CellStandard OperationTM2Nb#8Electrical Check The results of the various electrical
checks performed on the TM#2 with and without
the Nb#8 target attached.
 TM2_elec_chk_steerers_and_lens_062818.pdfTM2_Nb8_elec_chk_shc.pdfTM2_notgt_elec_chk_shc_062918.pdf 
  1748   Tuesday, July 03, 2018, 09:57 Travis CaveITWStandard OperationTM2Nb#8Module move TM#2 with Nb#8 has been moved from
the south hot cell to the west target station.
  
  1750   Tuesday, July 03, 2018, 14:42 David WangITWStandard OperationTM2Nb#8TM2 has been connected to ITW.TM2 has been connected to ITW. All turbo
pumps are started. See attachment for connection
checklist.
 Nb#4_Module_connection_checklist.pdf 