  2169   Tuesday, November 24, 2020, 12:56 David WangITWStandard OperationTM2Nb#9TM2 has been connected in ITW

TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far.

Attachment 1: TM2_Nb#9_module_connection_checklist.pdf
TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf
  2178   Monday, January 18, 2021, 12:29 David WangITWStandard OperationTM2Nb#9ITW vacuum and TM2 water lines leak check .

ITW primary and secondary vacuum vessel leak check are done. There is a 5XE-8 atm.cc/sec leak on Exit service cap NW side square panel.  The leak is small. And, it is close to ITW TP3 so it is not affect ion beam line vacuum during operation. We will replace the seal on the panel later.   The rest leak check on air to vacuum seals are good. TM2 water lines are pressurized with 70 psi helium. We did it  3 hours after water lines are purged. No leak was showed during the check.

2021-02-24th: The o-ring on exit 1 NW side square panel is replaced by David Wang and Frank Song. 

  2179   Tuesday, January 19, 2021, 11:32 Travis CaveSafe Module ParkingStandard OperationTM2Nb#9Module move

 TM#2 with Nb#9 was moved from ITW to SHC and then with no target it was moved from the SHC to the SMP.

  1747   Friday, June 29, 2018, 13:36 Travis CaveSouth Hot-CellStandard OperationTM2Nb#8Electrical Check

 The results of the various electrical checks performed on the TM#2 with and without the Nb#8 target attached.

Attachment 1: TM2_elec_chk_steerers_and_lens_062818.pdf
TM2_elec_chk_steerers_and_lens_062818.pdf
Attachment 2: TM2_Nb8_elec_chk_shc.pdf
TM2_Nb8_elec_chk_shc.pdf
Attachment 3: TM2_notgt_elec_chk_shc_062918.pdf
TM2_notgt_elec_chk_shc_062918.pdf
  1748   Tuesday, July 03, 2018, 09:57 Travis CaveITWStandard OperationTM2Nb#8Module move

 TM#2 with Nb#8 has been moved from the south hot cell to the west target station.

  1750   Tuesday, July 03, 2018, 14:42 David WangITWStandard OperationTM2Nb#8TM2 has been connected to ITW.

TM2 has been connected to ITW. All turbo pumps are started. See attachment for connection checklist.

Attachment 1: Nb#4_Module_connection_checklist.pdf
Nb#4_Module_connection_checklist.pdf Nb#4_Module_connection_checklist.pdf Nb#4_Module_connection_checklist.pdf
  1751   Wednesday, July 11, 2018, 15:06 Anders MjosITWStandard OperationTM2Nb#8Block move

Maico and Travis moved blocks from ITE to ITW yesterday

  1752   Wednesday, July 11, 2018, 15:09 Anders MjosITWMaintenanceTM2Nb#8Uncovered ITW to toubleshoot 2A2M19

The 2A2M19 beam profile monitor did not work and was e-faulted. After initial troubleshooting 2 blocks were removed form ITW to inspect the entrance module where the beam monitor is installed. The cable was found not to be connected and was quickly fixed. Blocks reinstalled. The work was done by Maico, Travis and Anders

  1758   Wednesday, July 25, 2018, 13:21 Anders MjosITWRepairTM2Nb#8Leak check of ITW

ITW Entrance Module was leak checked yesterday with the support of Vacuum Group (Dimo & Edi). The leak detector was connected to primary backing vacuum line. A leak response was found near the bellow for the beam profile monitor on top of the Entrance Module. It could be confirmed today by actuating the monitor, that the leak was indeed at that location. The plan is to move the TM and Entrance Module out for target exchange and repair, respectively. Drawings of the device available on ITA0200and ITA5128

Attachment 1: Entrance_Module_Leak_2018-07-25.docx
  1759   Tuesday, July 31, 2018, 10:20 Travis CaveSouth Hot-CellStandard OperationTM2Nb#8Module move

 TM#2 with Nb#8 has been moved from ITW to the south hot cell.

  1765   Thursday, August 02, 2018, 14:12 Travis CaveSpent Target VaultStandard Operation Nb#8Spent Target Move

 The spent Nb#8 target was moved from the south hot cell to the spent target vault. It was placed in pail #168 and place in spot 2A in the vault. See the attached pdf for vault details.

Attachment 1: Target_Index_2018-08-02.pdf
Target_Index_2018-08-02.pdf
  181   Tuesday, September 18, 2012, 13:41 David WangSouth Hot-CellStandard OperationTM1Nb#7leak check heat shield circuit

Chad and i did a leak check on TM1 heat shield circuit with new Nb#7 target installed. It took about 5 mins pump down the circuit to leak rate 0.0x E-9atm.cc/sec and 0.0x E-4 torr on leak detector.

All vacuum lines and joints which connected to the leak detector had been helium sprayed and they are leak  tight. Chad sprayed helium on each VCR joints for 2 seconds every time. During 45sec waiting time, there is no any response on leak detector. Chad repeated same test again for double checking and we got same result. Chad finally flushed the helium around the target heat shield for 10 seconds.we waited for 45minute and found no response on the leak detector. The heat shield circuit is leak tight at this stage. I will do a helium pressure test on this circuit when TM1 is in CS and under vacuum.

  182   Tuesday, September 18, 2012, 13:47 chad fisherSouth Hot-CellStandard OperationTM1Nb#7Nb #7 install Cover Baseline

Nb #7 was installed and tested today.

Inside face of the containment box cover was cleaned with methanol and a baseline picture taken in an effort to track deposits and marking as requested bty Anders.

Attachment 1: IMG_3191.JPG
IMG_3191.JPG
Attachment 2: IMG_3192.JPG
IMG_3192.JPG
  183   Wednesday, September 19, 2012, 11:23 Travis CaveSouth Hot-CellStandard OperationTM1Nb#7Electrical check

TM#1 with Nb#7 attached was electrically checked at the south hot cell yesterday, see attached pdf for details. Some notes about this test the oven to the 60kV common is 2Mohm this was noticed on the target prior to installation on the module, and the 60kV common to chassis is low at 874Mohm (low as in a non infinite value).

Attachment 1: TM1_Nb7_Elec_chk_SHC.PDF
TM1_Nb7_Elec_chk_SHC.PDF
  184   Wednesday, September 19, 2012, 11:24 Travis CaveConditioning StationStandard OperationTM1Nb#7module move

TM#1 with Nb#7 was moved from the south hot cell to the conditioning station. Move went well.

  185   Thursday, September 20, 2012, 08:45 Travis CaveConditioning StationStandard OperationTM1Nb#7Electrical check

Electrical check was done at the conditioning station this morning results are on the attached PDF.

Attachment 1: TM1_Nb7_Elec_chk_CS.PDF
TM1_Nb7_Elec_chk_CS.PDF
  186   Thursday, September 20, 2012, 09:16 David WangConditioning StationStandard OperationTM1Nb#7TM1 Nb#7 target heat shield helium pressure check is done.

Leak detector pumped down to base LR1.3xE-9 atm.cc/sec, and BP 8xE-3 torr. All high vacuum gauge readings at CS and TM1 are at low -6 range from 1.2xE-6torr to 4.6x E-6 torr. Applied 80 psi helium  to heat shield circuit for 5minutes and there is no any response on leak detector. The heat shield circuit is leak tight.

  187   Tuesday, September 25, 2012, 10:34 Travis CaveITWStandard OperationTM1Nb#7module move

TM#1 with Nb#7 moved from the conditioning station to the west target station. Move went well.

  188   Tuesday, September 25, 2012, 14:33 David WangITWStandard OperationTM1Nb#7TM1connected in ITW

TM 1 is in ITW now. All connections are done. The turbo pumps had been started this afternoon. The vacuum looks good so far. The water interlock check which related to TM1 are done. They are good. All TM1 water signals are visually checked and they are strong.  The rest interlock check ( MCR XT page) will be finished before shielding blocks moving. The MAA is locked and ITE is ready for proton beam.        

  190   Tuesday, October 02, 2012, 11:47 David WangITWStandard OperationTM1Nb#7I moved 5 shielding blocks from ITE to ITW.

5 shielding blocks have been moved from ITE to ITW. ITW is configured to take proton beam now.