Entry  Friday, November 22, 2013, 10:29, Travis Cave, Spent Target Vault, Standard Operation, , NiO#2, Spent target move Vault_Storage_November_22_2013.pdf
NiO#2 has been moved from the south hot cell into spent target storage. It was placed in pail 111 in slot 3C of the storage vault. It was 76.4mSv/hr
upon removal from the south hot cell.
Entry  Wednesday, September 05, 2012, 11:55, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, module move 
TM#4 with NiO#1 has been moved from the south hot cell to the conditioning station. Move went well.
Entry  Wednesday, September 05, 2012, 14:40, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, Electrical check TM#4_NiO#1.PDF
See attached PDF for details. 60kV Common to the target is low at 343k but I've been told will work. Test will be done again on Friday after it has sat
a few days under vacuum.
Entry  Friday, September 07, 2012, 10:37, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, Electrical check TM#4_NiO#1a.PDF
Electrical check of the TM#4 with NiO#1 was done again today. see attached file for results.
Entry  Tuesday, October 09, 2012, 11:17, Bevan Moss, ITE, Standard Operation, TM4, NiO#1, Module Move 
 TM4 with NiO#1 was moved from ITE to the SHC today. The move went well with no issues.
Entry  Wednesday, October 24, 2012, 11:53, Travis Cave, Spent Target Vault, Standard Operation, , NiO#1, Spent target move Vault_Storage_October_24_2012.pdf
The NiO #1 spent target was placed into storage today. It is in pail number 01 (101 on Vault Status page) and located in slot 4A of the vault. It was
35.5 mSv/hr upon removal from the south hot cell. See attached PDF for vault details.
Entry  Tuesday, September 04, 2012, 14:34, David Wang, South Hot-Cell, Standard Operation, TM4, NiO #1, TM4 heat shield circuit leak check with NiO#1 target 
Chad and i did a leak check on TM4 heat shield circuit with new NiO#1 target installed. It took about 40 mins(much longer than usual) to pump down the
circuit to leak rate 0.6x E-9atm.cc/sec and 0.0x E-4 torr o leak detector.
All vacuum lines and joints which connected to the leak detector had been helium sprayed and they are leak  tight.Chad sprayed helium on each
Entry  Wednesday, September 05, 2012, 14:36, chad fisher, South Hot-Cell, Standard Operation, TM4, NiO #1, UOx removal NiO installation 
UOx was removed from TM4 yesterday and NiO#1 installed.
Video was taken.
Main stand-off insulators continue to deteriorate.
Entry  Friday, September 07, 2012, 08:54, David Wang, Conditioning Station, Standard Operation, TM4, NiO #1, TM4 NiO #1 target heat shield helium pressure check is done. 
leak detector pumped down to 0.0xE-9 atm.cc/sec, and 0.0xE-4 torr. All high vacuum gauge readings at CS and TM4 are at low -6 range from 2.2xE-6torr
to 4.2x E-6 torr. Applied 80 psi helium  to heat shield circuit for 5minutes and there is no any response on leak detector. The heat shield circuit
is leak tight.
Entry  Wednesday, September 12, 2012, 07:00, David Wang, ITE, Standard Operation, TM4, NiO #1, ITM4 in ITE connected and pumping down 
TM4 had been connected in ITE. Six turbo pump had been started . thepumpming diwn is very good so far. The water interlock check on ITE and TM4 had been
finished and everything is good.All water signals are strong and constant by visually checking.
Entry  Tuesday, October 09, 2012, 10:35, David Wang, ITE, Standard Operation, TM4, NiO #1, Disconnected TM4 in ITE. 
I disconnected TM4 in ITE this morning. The heat shield circuit has been purged with air.
Entry  Tuesday, November 24, 2020, 12:56, David Wang, ITW, Standard Operation, TM2, Nb#9, TM2 has been connected in ITW TM2_Nb#9_module_connection_checklist.pdf
TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far.
Entry  Monday, January 18, 2021, 12:29, David Wang, ITW, Standard Operation, TM2, Nb#9, ITW vacuum and TM2 water lines leak check . 
ITW primary and secondary vacuum vessel leak check are done. There is a 5XE-8 atm.cc/sec leak on Exit service cap NW side square panel.  The leak
is small. And, it is close to ITW TP3 so it is not affect ion beam line vacuum during operation. We will replace the seal on the panel later.  
The rest leak check on air to vacuum seals are good. TM2 water lines are pressurized with 70 psi helium. We did it  3 hours after water lines are
Entry  Tuesday, January 19, 2021, 11:32, Travis Cave, Safe Module Parking, Standard Operation, TM2, Nb#9, Module move 
 TM#2 with Nb#9 was moved from ITW to SHC and then with no target it was moved from the SHC to the SMP.
Entry  Friday, June 29, 2018, 13:36, Travis Cave, South Hot-Cell, Standard Operation, TM2, Nb#8, Electrical Check TM2_elec_chk_steerers_and_lens_062818.pdfTM2_Nb8_elec_chk_shc.pdfTM2_notgt_elec_chk_shc_062918.pdf
 The results of the various electrical checks performed on the TM#2 with and without the Nb#8 target attached.
Entry  Tuesday, July 03, 2018, 09:57, Travis Cave, ITW, Standard Operation, TM2, Nb#8, Module move 
 TM#2 with Nb#8 has been moved from the south hot cell to the west target station.
Entry  Tuesday, July 03, 2018, 14:42, David Wang, ITW, Standard Operation, TM2, Nb#8, TM2 has been connected to ITW. Nb#4_Module_connection_checklist.pdf
TM2 has been connected to ITW. All turbo pumps are started. See attachment for connection checklist.
Entry  Wednesday, July 11, 2018, 15:06, Anders Mjos, ITW, Standard Operation, TM2, Nb#8, Block move 
Maico and Travis moved blocks from ITE to ITW yesterday
Entry  Wednesday, July 11, 2018, 15:09, Anders Mjos, ITW, Maintenance, TM2, Nb#8, Uncovered ITW to toubleshoot 2A2M19 
The 2A2M19 beam profile monitor did not work and was e-faulted.
After initial troubleshooting 2 blocks were removed form ITW to inspect the entrance module where the beam monitor is installed. The cable was found not
to be connected and was quickly fixed. Blocks reinstalled. The work was done by Maico, Travis and Anders
Entry  Wednesday, July 25, 2018, 13:21, Anders Mjos, ITW, Repair, TM2, Nb#8, Leak check of ITW Entrance_Module_Leak_2018-07-25.docx
ITW Entrance Module was leak checked yesterday with the support of Vacuum Group (Dimo & Edi). The leak detector was connected to primary backing
vacuum line. A leak response was found near the bellow for the beam profile monitor on top of the Entrance Module. It could be confirmed today by actuating
the monitor, that the leak was indeed at that location. The plan is to move the TM and Entrance Module out for target exchange and repair, respectively.