Monday, September 30, 2013, 14:00, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, module move
|
TM#3 with NiO#2 has been move from south hot cell to the conditioning station. |
Monday, September 30, 2013, 16:00, Bevan Moss, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check
|
Travis Cave wrote:
Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. |
Monday, September 30, 2013, 16:02, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, Vacuum
|
The roughing pump for TCS was started at ~3:00 and the turbo's turned on at ~4:00. This is the minimum time for the module to pump down. |
Monday, September 30, 2013, 16:04, Bevan Moss, Conditioning Station, Repair, TM3, NiO#2, Ion gauge filament replacement
|
The filament on IG1 for TM3 was replaced by myself and Edi. The old filament did not appear to be damaged but the controller claimed it was. The
current gauge on TM3 is a single filament, ideally it would be upgraded to a double. |
Tuesday, October 01, 2013, 11:00, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, Electrical check
|
TM#3 with NiO#2 electrical check at conditioning station under vacuum, see pdf for details. |
Wednesday, October 02, 2013, 09:40, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, HP conditioning  
|
Yesterday the TBHT was ramped to 250 amp and the TGHT was ramped to 440 amps. Attached is the data from that run the strip tool that had this screen
shot crashed but it can be recreated with the data. The TBHT ps was not reading back accurate results as such there are large steps in current or voltage
or some instability for no apparent reason. In addition to this the ramping program is still not working so the ramping was a very manual process. The |
Friday, October 04, 2013, 19:05, Grant Minor, Conditioning Station, Standard Operation, TM3, NiO#2, HP Conditioning - e-mail notes from Oct 2nd to Oct 4th
|
I have compiled the e-mail comments from people involved in High-Power Conditioning of TM3 w/ the new Rev 3 source tray and NiO#2 since Bevan Moss' last
log on October 2nd below:
On October 2nd at 6:35pm Friedhelm Ames wrote: |
Friday, October 04, 2013, 19:39, Grant Minor, Conditioning Station, Standard Operation, TM3, NiO#2, TCS vacuum improvement w/ heaters off - 2:20 pm to 7:17pm
|
Here is the change in the TCS vacuum after heaters were turned off earlier today:
2:20 pm readings
TCS:IG1 (service cap) 9.3 x 10^-7 Torr |
Saturday, October 05, 2013, 14:45, Friedhelm Ames, Conditioning Station, Standard Operation, TM3, NiO#2, vacuum readings
|
IG1 8.0 e-7 T
IG1S 2.5 e-6 T
IG2 4.3 e-6 T |
Sunday, October 06, 2013, 00:17, Friedhelm Ames, Conditioning Station, Standard Operation, TM3, NiO#2, high voltage conditioning
|
high voltage conditioning was carried out over the day up to 24 kV. i will leave it at 20 kV over night. Current is at 22 micro Amps, heaters off.
vacuum: IG1 7.7e-7
IG2 4.07 e-6 |
Sunday, October 06, 2013, 15:39, Friedhelm Ames, Conditioning Station, Standard Operation, TM3, NiO#2, HEATERS STARTED
|
The high voltage was sparking several times during the night. It may be correlated with the cycling of the cooling water temperature and conductance.
vacuum levels at 11:00
IG1 7.5e-7 T |
Sunday, October 06, 2013, 17:08, Friedhelm Ames, Conditioning Station, Development, TM3, NiO#2, trip of all power supplies
|
All power supplies tripped on high conductivity of the cooling water < 5 MOhm, It is not clear if this was caused by a spark or vice versa. According
to the strip tool for this signal the resistance of the water went up. There might be a fault in this signal. I do not have permission to force this signal
so I keep the heaters off. We should revisit the interlock conditions, this signal should not be included in the interlocks for the heaters. Both target |
Sunday, October 06, 2013, 20:28, Friedhelm Ames, Conditioning Station, Standard Operation, TM3, NiO#2, turbo pumps stopped
|
vacuum readings before stopping
IG1: 7.4e-7 T
IG2 3.8 e-6 T |
Monday, October 07, 2013, 12:06, Travis Cave, ITE, Standard Operation, TM3, NiO#2, module move
|
TM#3 has been moved from the conditioning station to the east target station, move went well. |
Tuesday, October 22, 2013, 14:23, Anders Mjos, ITE, Standard Operation, TM3, NiO#2, Padlle wheel frequency measurements
|
as measured today in the electrical room by David and Anders |
Friday, October 25, 2013, 13:39, Anders Mjos, ITE, Standard Operation, TM3, NiO#2, Padlle wheel frequency measurements
|
with TM4 in ITW as measured today in the electrical room by David and Anders.
|
Thursday, October 31, 2013, 11:38, Anders Mjos, ITE, Standard Operation, TM3, NiO#2, Padlle wheel frequency measurements
|
with TM4 in ITW as measured today in the electrical room by David and Anders. |
Tuesday, November 19, 2013, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, module move
|
TM#3 with NiO#2 moved from ITE to the south hot cell. |
Wednesday, November 20, 2013, 08:50, chad fisher, South Hot-Cell, Standard Operation, TM3, NiO#2, NiO#2 removed 
|
NiO#2 has been removed from TM3 |
Thursday, November 21, 2013, 12:12, Anders Mjos, South Hot-Cell, Standard Operation, TM3, NiO#2, End of beam target inspection - ANODE does not hold 250V
|
The target was inspected by Chad and Anders in the Hot Cell. Electrical megger tests were done during the assembly. It was found that Insulators No 3
(ITD0311) and No 2 (ITD0310) failed to hold voltage after the run.
|
|