Entry  Thursday, August 18, 2022, 10:41, Frank Song, ITE/ITW, Standard Operation, TM4, SiC#44, TM4 with SiC#44 connection in ITE TM4_with_SiC#44_connection_in_ITE.jpg
 TM4 with target SiC#44 was connected in ITE on Tuesday.
Entry  Tuesday, September 06, 2022, 13:58, Frank Song, ITW, Standard Operation, TM2, UCx#38, module disconnection TM2_with_UCx38_disconnection_in_ITW.png
 TM2 with Target UCx38 was disconnected in ITW and moved to NHC
Entry  Tuesday, September 06, 2022, 14:05, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, electrical check after disconnection  TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
 An electrical was done on the NHC for TM2 with spent Target UCx#38 on
Entry  Thursday, September 08, 2022, 07:20, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check TM2_with_UCx#39_E_Check.png
 An electrical check was done on NHC yesterday.
Entry  Tuesday, September 13, 2022, 14:10, Frank Song, ITW, Standard Operation, TM2, UCx#39, Module Connection TM2_with_UCx#39_connection_in_ITW.png
 TM2 with UCx#39 is connected in ITW.
Entry  Monday, October 03, 2022, 09:42, Frank Song, ITE, Standard Operation, TM4, Sic#44, module disconnection TM4_with_SiC#44_disconnected_in_ITE.png
 TM4 with SiC@44 was disconnected in ITE.
Entry  Tuesday, October 04, 2022, 07:19, Frank Song, North Hot-Cell, Standard Operation, TM4, C#4, electrical check tm4_with_C#4_installed.png
 an electrical was done for TM4 with target C#4 installed on NHC.
Entry  Tuesday, October 11, 2022, 12:39, Frank Song, ITE, Standard Operation, TM4, C#4, Module Connection TM4_with_C#4_connection_in_ITE.png
 TM4 with Target C#4 was connected in ITE.
Entry  Tuesday, November 01, 2022, 12:37, Frank Song, ITW, Standard Operation, TM2, UCx#39, disconnection TM2_with_UCx39_disconnection_in_ITW.png
 TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC.
Entry  Tuesday, November 01, 2022, 12:40, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png
 TM2 with spent target UCx#39 had an electric check in NHC.
After UCx 39# target was removed out., I did electrical check on TM2.   @500 V B to C is 5M ohm. all Others between are above 25Mohm.
HV to Chasis is 650Mohm.  A to P is still short. 
Entry  Wednesday, November 02, 2022, 11:11, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#40, electrical check TM2_with_UCx40_electrical_check_on_NHC.png
an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.
Entry  Tuesday, November 15, 2022, 13:33, Frank Song, ITW, Standard Operation, TM2, UCx#40, Module Connection TM2_with_UCx#40_connection_in_ITW.png
 TM2 with UCx#40 is connected in ITW.
Entry  Tuesday, November 22, 2022, 09:44, Frank Song, ITE, Standard Operation, TM4, C#4, module disconnection TM4_with_C#4_disconnected_in_ITE.png
TM4 with C#4 was disconnected in ITE
Entry  Tuesday, November 22, 2022, 12:41, Frank Song, North Hot-Cell, Standard Operation, TM4, C#4, electrical check TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
 TM4 with C#4 is checked on NHC right after moving from ITE.
Entry  Wednesday, November 23, 2022, 11:27, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#41, electric and leak check after new target installed TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
 an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS.
Entry  Thursday, December 01, 2022, 08:20, Frank Song, ITE, Standard Operation, TM4, UCx#41, Module Connection TM4_with_UCx#41_connection_in_ITE.png
 TM4 with UCx#41 was connected in ITE on Tuesday (2022-11-29) 
Entry  Monday, January 09, 2023, 14:19, Frank Song, ITW, Standard Operation, TM2, UCx#40, TM2 with UCx40 disconnection in ITW TM2_with_UCx40_disconnection_in_ITW.png
 TM2 with target UCx40 was disconnected in ITW and moved to NHC.
Entry  Tuesday, January 10, 2023, 10:15, Frank Song, Safe Module Parking, Standard Operation, TM2, UCx40 removed, TM2 electrical check with no target attached on SW silo TM2_electrical_check_without_UCx40_on_SW_silo.png
 TM2 with no target on SW silo be electrical checked right after module moving.
Entry  Thursday, March 30, 2023, 14:29, Frank Song, ITE/ITW, Development, , , Preparation of target stations for FEBIAD runs 1_(5).png1_(2).png
Helium cylinder and  Argon cylinder are installed in both ITE/ITW faraday cages , regulator for outlet pressure are not set yet.
 
TO ITE :  Argon bottle size 14"L x 4"D with SV2 connected at pressure 900 Psi ( 70 bar )
Entry  Monday, May 08, 2023, 10:59, Frank Song, North Hot-Cell, Standard Operation, TM4, TiC#5, electrical check/leak check TM4_with_TiC#5_20230508.png
 TM4 with target TiC#5 installed has been leak checked and electric checked on NHC.