  RH-ISAC, Page 60 of 138  Not logged in ELOG logo
  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  951   Thursday, June 18, 2015, 08:03 chad fisherSouth Hot-CellRepairTM2 TM2 Optics Tray TransferThe TM2 optics tray has been transferred
from the source tray to the transfer fixture
in preparation for installation of the source
 20150618_075326_1.jpg 
  952   Friday, June 19, 2015, 09:37 Isaac EarleSouth Hot-CellRepairTM2 TM2 Source Tray Installation - June 18, 2015 The following work was done on
June 18 2015:
- Finished cleaning and polishing
  
  955   Friday, June 19, 2015, 11:57 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray ProgressWindow waterline has been successfully
connected using 1 1/2 inch long non-blunt
start 1/4-28 bolts.
  
  956   Friday, June 19, 2015, 13:00 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray Install StatusLeft manipulator now broken. Master side
however, so repair can take place Monday
or Tuesday.
  
  958   Tuesday, June 23, 2015, 14:19 chad fisherSouth Hot-CellRepairTM2 TM2 Water Block Jigs RemovedBoth halves of the water block jigs have
been removed and the module is now ready
for base vacuum leak and electrical checks.
 20150623_140917.jpg 
  960   Wednesday, June 24, 2015, 10:16 chad fisherSouth Hot-CellRepairTM2 TM2 Vacuum Leak CheckThe following circuits have been vacuum
leak checked and have not registered any
leaks:
  
  961   Wednesday, June 24, 2015, 13:49 David WangSouth Hot-CellRepairTM2 TM2 new source tray vacuum leak check.All water blocks seals and joints have
been leak checked. No leak has been found
on any of them. See attachment
 TM2_new_source_tray_water_block_leak_check_at_SHC.pdf 
  962   Friday, June 26, 2015, 08:27 David WangConditioning StationStandard OperationTM2 Target Hall Scheduled Activities April 07 - July 24 2015Update the Target hall Schedule after some
changes on TM2 refurbishment. See attachment
1,2
 Target_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.mpp 
  963   Friday, June 26, 2015, 09:44 chad fisherSouth Hot-CellRepairTM2 TM2 Retrofit StatusOn June 25th the following work was completed:
Optics tray was installed into TM2.
The lower fastener on the vertical cable
 20150625_075616_1.jpg20150625_083457.jpg20150625_105735.jpg20150625_110053.jpg 
  964   Friday, June 26, 2015, 09:45 chad fisherSouth Hot-CellRepairTM2 TM2 StatusContainment box window waterlines have
been connected and leak checked and new containment
box cover installed.
  
  965   Friday, June 26, 2015, 14:33 David WangConditioning StationStandard OperationTM2 TM2 have been moved from SHC to CSBill and I mover TM2 from SHC to CS. The
move is smooth. I connected the CS vacuum
system after the move, and started the roughing.
  
  966   Friday, June 26, 2015, 15:38 Anders MjosConditioning StationDevelopmentTM2 Leak check and HV testRoughing started by David.
Friday, June 26, 2015, 15:31: Started
TP1S
  
  967   Monday, June 29, 2015, 10:51 David WangConditioning StationRepairTM2 leak on TM2 side panelThere is an air to vacuum leak on TM2 service
cap side panel which we moved out during
the TM2 wiring job. The CS pumps are stopped
  
  972   Tuesday, June 30, 2015, 15:53 David WangConditioning StationDevelopmentTM2 leak on TM2 at CS I leak checked TM2 at CS this afternoon
which including air to vacuum check on service
cap and helium pressure test on water lines.
 TM2_leak_check_2015-06-30.pdfleak_check_2015-06-30_007.JPGleak_check_2015-06-30_009.JPG 
  973   Thursday, July 02, 2015, 10:22 Anders MjosConditioning StationMaintenanceTM2 TP1S failed See e-fault 8233. Edi assisted in
diagnosing the problem. The pump will have
to be replaced.
  
  976   Friday, July 03, 2015, 09:11 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule movedTM#2 has been moved from the conditioning
station to the south hot cell.
  
  978   Friday, July 03, 2015, 09:41 David WangConditioning StationStandard OperationTM2 Target Hall Scheduled Activities April 07 - July 24 2015Updated the schedule before the weekend
2015-07-03. See attachment 1,2
Updated the schedule according to
 Target_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_07.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_07.mpp 
  979   Friday, July 03, 2015, 11:33 chad fisherSouth Hot-CellRepairTM2 TM2 Coil Leak ProgressFirst thing this morning the hot cell was
"cleaned up" in preparation for
the return of TM2 for attempted verification
 TM2_coil_leak_20150703_11.jpg20150703_111248.jpg 
  980   Friday, July 03, 2015, 13:29 chad fisherSouth Hot-CellRepairTM2 Hot Cell/ Module FieldsField measured at block "R" through
tool port with pole monitor is 6.65 mSv/H.
There are three air hoods and two
  
  983   Wednesday, July 08, 2015, 12:18 chad fisherSouth Hot-CellRepairTM2 R U Coil line RemovalR U coil line removal started at 11:30.
Water block jig installed and coil line disconnected
from module.
 TM2_20150708_coil_line_leak.jpg 