  2766   Monday, February 10, 2025, 11:48 David WangSouth Hot-CellStandard OperationTM2No targetTM2 has been moved from W_S silo to SHC.Remotely removed TM2 from S-W silo to SHC
. Peter and I did the move. It is successful.
  
  2769   Friday, February 14, 2025, 10:48 David WangSouth Hot-CellStandard OperationTM2No targetTM2 has been moved from SHC to TCS. TM2 has been moved from SHC to TCS successfully.
Travis and I did the move. 
  
  2771   Tuesday, February 18, 2025, 10:41 David WangConditioning StationStandard OperationTM3No targetTM2 at TCS annual electrical check and water lines helium pressure check .TM2
has been moved to TCS and under good vacuum.
TP1/2 work fine.  Electrical check:
 TM2_at_TCS_annual_electrical_chheck_and_leak_check.pdf 
  2773   Thursday, February 20, 2025, 10:12 David WangSafe Module ParkingStandard OperationTM4No targetTM4 electrical check at SMP(vented) without targetTM4 electrical check at SMP(vented) without
target: PQ is dead short to RU. PQRU to 60kv
bias,750Kohm at250V. other things are good.
 TM2_electrical_check_at_SMP.pdf 
  2774   Thursday, February 20, 2025, 11:10 David WangConditioning StationStandard OperationTM2No targetTM2 has been moved from TCS to west-south silo.TM2 has been moved from TCS to west-south
silo. Travis and I did the job. The move
is successful. 
  
  350   Wednesday, May 15, 2013, 18:12 Bevan MossConditioning StationStandard OperationTM3No source trayHV test repeat After discussion with Friedhelm it
was decided to continue trying to condition
the module today before moving it tomorrow.
 15052013_TM3_HV_test_repeat.xlsx 
  398   Friday, July 05, 2013, 10:02 Bevan MossConditioning StationStandard OperationTM3No source trayTM3 module move to TCSTM3 has been moved from the south hot cell
to the conditioning station. David and I
completed the move. All went well.
  
  85   Monday, April 16, 2012, 16:17 Bevan MossConditioning StationStandard OperationTM1No TargetHigh Voltage Test A high voltage test was completed
on a target free TM1 in the conditioning
station. Only the turbo pumps on the target
  
  1952   Monday, July 22, 2019, 14:51 Adam NewsomeSouth Hot-CellStandard OperationTM4No TargetTM4 MoveTM4 has been moved from the South West
silo to the South Hot Cell. New source tray,
no target.
  
  1957   Wednesday, July 31, 2019, 08:57 Adam NewsomeSouth Hot-CellStandard OperationTM4No TargetTM4 MoveTM4 has been moved from the Conditioning
Station to the South Hot Cell. No target.
  
  339   Friday, May 10, 2013, 11:28 Bevan MossConditioning StationStandard OperationTM3No Source TrayRoughing Started Roughing on TM3 was started at 11:26am
today
  
  340   Friday, May 10, 2013, 14:05 Bevan MossConditioning StationStandard OperationTM3No Source TrayTurbo Pumps OnThe turbo pumps are on. TP1 and TP2 once
again timed out and had to be restarted before
they would stay on.
  
  344   Wednesday, May 15, 2013, 10:17 Bevan MossConditioning StationStandard OperationTM3No Source TrayPreliminary Results from HV testing Testing on TM3 without a source tray
was completed on 13/05.2013. All items were
tied to common and the water blocks were
 module_hv_test_0KV.rgaMODULE_hv_test_42kv.rgaTM3_13052013_no_source_tray.xlsx 
  348   Wednesday, May 15, 2013, 16:51 Bevan MossConditioning StationStandard OperationTM3No Source TrayRepeat of HV Test The HV test completed on Monday was
repeated today over a much longer time period.
By taking longer there was slightly less
 150502013_TM3_No_Source_Tray.xlsx 
  354   Tuesday, May 21, 2013, 11:52 Bevan MossConditioning StationStandard OperationTM3No Source TrayMay 16th Long HV conditioningOn May 16th 2013 the module was HV conditioned
all day. As a result the maximum stable voltage
has been increased to about 47kV (~4kV more
 16052013_TM3_long_HV_conditioning.xlsx 
  404   Monday, July 22, 2013, 15:52 Bevan MossConditioning StationStandard OperationTM3No Source TrayHV testing update   I have fallen behind on the
HV testing that has been completed on TM3.
Data can be found on docushare in the TM3
  
  464   Wednesday, September 25, 2013, 10:00 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2module moveTM#3 with NiO#2 has been moved from the
south hot cell to the conditioning station.
  
  465   Wednesday, September 25, 2013, 11:08 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2Electrical checkThe module was checked electrically this
morning before the module move. See the attached
PDF for details.
 TM#3_elec_chk_NiO#2_SHC.PDF 
  466   Wednesday, September 25, 2013, 13:48 Travis CaveConditioning StationStandard OperationTM3NiO#2Electrical checkElectrical check of TM#3 in the conditioning
station under vacuum see attached PDF for
details.
 TM#3_elec_chk_NiO#2_CS.PDF 
  468   Thursday, September 26, 2013, 14:31 Bevan MossSouth Hot-CellRepairTM3NiO#2Activities September 24 - 25September 24
 After the manipulator repair
Maico installed the NiO#2 onto the target
 elec_check.pdf 