Entry time: Wednesday, May 15, 2013, 16:51
|
Author: |
Bevan Moss |
Category: |
Conditioning Station |
Type: |
Standard Operation |
Module: |
TM3 |
Target/Number: |
No Source Tray |
Subject: |
Repeat of HV Test |
|
|
The HV test completed on Monday was repeated today over a much longer time period. By taking longer there was slightly less sparking but once again a maximum voltage of ~44kV was achieved. The resistivity of the water was much higher during this run so the leakage current was less but still in the >100 uA range. The spark that occurred during the ramp up to the maximum voltage caused the "water resistivity" limit to trip. This was a feed back through the control not the actual water changing as it recovered instantaneously. |
|