2245
|
Friday, September 17, 2021, 12:20 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#41 | TM4 SIS with Target and No external Connections | TM4 electric check with new target
was done by David. A pic attached here for
ref. |
|
2248
|
Tuesday, September 21, 2021, 13:47 |
Travis Cave | North Hot-Cell | Standard Operation | TM2 | UC#34 | Module move | TM#2 with UC#34 has been moved from
ITW to the north hot cell had the target
removed and then moved to the south west |
|
2253
|
Monday, October 04, 2021, 09:33 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | C#3 | TM2 with target connection test | the test was done when TM2 sit on
NHC. |
|
2255
|
Monday, October 04, 2021, 10:52 |
Travis Cave | North Hot-Cell | Standard Operation | TM4 | SiC#41 | Module move | TM#2 moved from ITE to NHC SiC#41
removed and then moved back to ITE. |
|
2257
|
Friday, October 08, 2021, 11:19 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#35 | TM4 IGLIS target electrical tests | the tests were done when TM4 was
on NHC. see attached photos please. |
 |
2259
|
Wednesday, October 13, 2021, 11:54 |
Travis Cave | North Hot-Cell | Standard Operation | | SiC#41 | Spent Target Move | The spent SiC#41 target has been
placed in pail #260 and placed in spot 5B
of that spent target vault. See attached |
|
2287
|
Monday, January 10, 2022, 12:38 |
David Wang | North Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from ITW to NHC. | Travis and Nadia moved TM2 from ITW to
NHC this morning. The move is smooth and
successful. |
|
2289
|
Tuesday, January 11, 2022, 11:51 |
David Wang | North Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from NHC to SMP. | TM2( no target ) has been moved from
NHC to SMP. The moving is smooth and
successful. |
|
2292
|
Tuesday, January 18, 2022, 11:02 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections | David made an electric check after
TM4 been moved to NHC from ITE. The target
is still on the module. Please find out attached |
|
2293
|
Wednesday, January 19, 2022, 09:00 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | Electrical check on TM4 at NHC without target | David did electrical check after
target removed from TM4 at NHC. see attachment
pls. |
|
2296
|
Thursday, January 20, 2022, 08:18 |
David Wang | North Hot-Cell | Standard Operation | TM4 | No target | TM4 was removed from NHC to S_W silo yesterday. | TM4 was removed from NHC to S_W silo yesterday.
The remove is smooth and successful. |
|
2330
|
Monday, June 20, 2022, 11:00 |
Frank Song | North Hot-Cell | Repair | TM2 | SiC#42 | Failed Sic#42 electrical measurement at NHC | An electrical check was done at NHC,
see attachment pls. |
|
2332
|
Tuesday, June 21, 2022, 15:36 |
Matthew Gareau | North Hot-Cell | Repair | TM2 | SiC#42, SiC#43 | multipin guide pin issues | While removing the SiC#42
it became apparent that the multipin guide |
|
2335
|
Tuesday, June 21, 2022, 18:43 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#37 | electrical check | A p2n target in TM4 was electrical
measured on NHC. see attachment pls. |
|
2338
|
Thursday, June 23, 2022, 07:11 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#64 | electrical check | New Target Ta#64 was installed on
TM4. Electrical measurement result is good.
c/w attachment. |
|
2347
|
Tuesday, July 19, 2022, 11:53 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | SiC#43 Febiad | electrical check | A electrical check was done at NHC,
see the pic attached with please. |
|
2348
|
Thursday, July 21, 2022, 10:24 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check | A electrical check was done for TM2
with UCx#38 |
|
2349
|
Tuesday, July 26, 2022, 13:50 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | TM2 electrical check with Target and No external Connections | A standard electrical check was done
for TM2 after the short issue be fixed. |
|
2352
|
Friday, July 29, 2022, 12:05 |
Carla Babcock | North Hot-Cell | Repair | TM2 | UCx#38 | Repair of UCx#38 EE short in ante room | UCx#38 developed a short between the plasma
electrode and the extraction electrode about
30mins after reaching full temperature in |
 |
2354
|
Tuesday, August 09, 2022, 12:23 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #64 | Electrical Check for TM4 with Ta#64 after beam at NHC | An electrical check made at NHC right
after TM4 moving from ITE. |
|