ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  2245   Friday, September 17, 2021, 12:20 Frank SongNorth Hot-CellStandard OperationTM4Sic#41TM4 SIS with Target and No external Connections TM4 electric check with new target
was done by David. A pic attached here for
ref.
 IMG_3603.jpg 
  2248   Tuesday, September 21, 2021, 13:47 Travis CaveNorth Hot-CellStandard OperationTM2UC#34Module move TM#2 with UC#34 has been moved from
ITW to the north hot cell had the target
removed and then moved to the south west
  
  2253   Monday, October 04, 2021, 09:33 Frank SongNorth Hot-CellStandard OperationTM2C#3TM2 with target connection test the test was done when TM2 sit on
NHC.
 IMG_3710.jpg 
  2255   Monday, October 04, 2021, 10:52 Travis CaveNorth Hot-CellStandard OperationTM4SiC#41Module move TM#2 moved from ITE to NHC SiC#41
removed and then moved back to ITE.
  
  2257   Friday, October 08, 2021, 11:19 Frank SongNorth Hot-CellStandard OperationTM4UCx#35TM4 IGLIS target electrical tests the tests were done when TM4 was
on NHC. see attached photos please.
 IMG_3739.jpgIMG_3740.jpg 
  2259   Wednesday, October 13, 2021, 11:54 Travis CaveNorth Hot-CellStandard Operation SiC#41Spent Target Move The spent SiC#41 target has been
placed in pail #260 and placed in spot 5B
of that spent target vault. See attached
 Target_Index_2021-10-13.pdf 
  2287   Monday, January 10, 2022, 12:38 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from ITW to NHC.Travis and Nadia moved TM2 from ITW to
NHC this morning. The move is smooth and
successful.
  
  2289   Tuesday, January 11, 2022, 11:51 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from NHC to SMP.TM2( no target ) has been moved  from
NHC to SMP.  The moving is smooth and
successful. 
  
  2292   Tuesday, January 18, 2022, 11:02 Frank SongNorth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections David made an electric check after
TM4 been moved to NHC from ITE. The target
is still on the module. Please find out attached
 tm4_with_Ta#63_on_NHC.jpg 
  2293   Wednesday, January 19, 2022, 09:00 Frank SongNorth Hot-CellStandard OperationTM4Ta #63Electrical check on TM4 at NHC without target David did electrical check after
target removed from TM4 at NHC. see attachment
pls.
 20220119_080049.jpg 
  2296   Thursday, January 20, 2022, 08:18 David WangNorth Hot-CellStandard OperationTM4No targetTM4 was removed from NHC to S_W silo yesterday. TM4 was removed from NHC to S_W silo yesterday. 
The remove is smooth and successful. 
  
  2330   Monday, June 20, 2022, 11:00 Frank SongNorth Hot-CellRepairTM2SiC#42Failed Sic#42 electrical measurement at NHC An electrical check was done at NHC,
see attachment pls.
 Failed_Sic#42_electrical_measurement_at_NHC.jpg 
  2332   Tuesday, June 21, 2022, 15:36 Matthew GareauNorth Hot-CellRepairTM2SiC#42, SiC#43multipin guide pin issues While removing the SiC#42
it became apparent that the multipin guide
  
  2335   Tuesday, June 21, 2022, 18:43 Frank SongNorth Hot-CellStandard OperationTM4UCx#37electrical check A p2n target in TM4 was electrical
measured on NHC. see attachment pls.
 p2n_ucx37_electrical_check.jpg 
  2338   Thursday, June 23, 2022, 07:11 Frank SongNorth Hot-CellStandard OperationTM4Ta#64electrical check New Target Ta#64 was installed on
TM4. Electrical measurement result is good.
c/w attachment.
 Ta#64.jpg 
  2347   Tuesday, July 19, 2022, 11:53 Frank SongNorth Hot-CellStandard OperationTM2SiC#43 Febiadelectrical check A electrical check was done at NHC,
see the pic attached with please.
 e_check_for_TM2_with_SiC43_Febiad.jpg 
  2348   Thursday, July 21, 2022, 10:24 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check A electrical check was done for TM2
with UCx#38
 TM2_with_UCx38_echeck_on_NHC.jpg 
  2349   Tuesday, July 26, 2022, 13:50 Frank SongNorth Hot-CellStandard OperationTM2UCx#38TM2 electrical check with Target and No external Connections A standard electrical check was done
for TM2 after the short issue be fixed.
 TM2_with_UCx38_echeck_on_NHC.jpg 
  2352   Friday, July 29, 2022, 12:05 Carla BabcockNorth Hot-CellRepairTM2UCx#38Repair of UCx#38 EE short in ante roomUCx#38 developed a short between the plasma
electrode and the extraction electrode about
30mins after reaching full temperature in
 20220726_111649.jpg20220726_111641.jpg 
  2354   Tuesday, August 09, 2022, 12:23 Frank SongNorth Hot-CellStandard OperationTM4Ta #64Electrical Check for TM4 with Ta#64 after beam at NHC An electrical check made at NHC right
after TM4 moving from ITE.
 tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg 