Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 5 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Category Type Module Target/Number Subject Text Attachments
  2675   Friday, September 06, 2024, 14:28 Aaron TamSouth Hot-CellStandard Operation Ta#68(Spare)Ta#68(Spare) removed from TM4 and into Anteroom September 5, 2024 -AT

    Plastic and clean target
tray added to SHC 
    TM4
  
  2674   Friday, September 06, 2024, 10:01 David WangSouth Hot-CellStandard OperationTM4Ta#67 back up. TM4 has been moved from SMP to SHC.TM4 has been moved from SMP to SHC. The
move is smooth. 
  
  2673   Thursday, September 05, 2024, 12:50 Adam NewsomeCraneMaintenance  Overhead crane: up/down hoist delayed start issueD. Wang reports that recently the overhead
crane has been exhibiting a delayed start
(approx. 1 min) when operating in local mode.
  
  2672   Tuesday, September 03, 2024, 11:40 David WangITWStandard OperationTM3TiC#8TM3 has been moved from ITW to S-W silo.TM3 has been moved from ITW to S-W silo.
The move is smooth. 
  
  2671   Tuesday, August 27, 2024, 13:30 Frank SongITWMaintenanceTM3TiC#8module disconnection TM3 is disconnected and all water
lines are purged/refilled with 50psi Nitrogen.
Pls see pics attached with.
 TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf 
  2670   Monday, August 26, 2024, 09:57 Travis CaveSpent Target VaultStandard Operation Nb#10Spent Target Move Nb#10 was placed in pail#295 and
moved from the south hot cell to the spent
target vault, spot 4A, it was 230uSv/hr when
 Target_Index_2024-08-26.pdf 
  2669   Wednesday, August 21, 2024, 10:53 Travis CaveSpent Target VaultStandard Operation TiC#7Spent Target Move TIC#7 was placed in pail #294 and
then moved from the south hot cell to the
spent target vault spot 4B. It was 82.3mSv/hr
 Target_Index_2024-08-21.pdf 
  2668   Tuesday, August 20, 2024, 11:53 Carla BabcockSouth Hot-CellStandard Operation Nb#10Nb#10 PIENb#10 never worked online - repeller had
no effect on the beam and one of the RF wires
was touching HVC. Max 60pA was seen on the
  
  2667   Tuesday, August 20, 2024, 11:36 Carla BabcockSouth Hot-CellStandard Operation TiC#7TiC#7 PIETiC#7 failed after two weeks of operations
- measurements in the electrical room indicated
that the negative side of the CHT was broken
  
  2666   Monday, August 19, 2024, 15:29 Frank SongITW/ITEStandard OperationTM2Ta#67shielding blocks transfer 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving.
  
  2665   Monday, August 19, 2024, 09:32 David WangConditioning StationStandard OperationTM4Ta#68 TM4 has been moved from SHC to TCS.TM4 has been moved from SHC to TCS. The
move is successful. 
  
  2664   Friday, August 16, 2024, 15:32 Aaron TamSouth Hot-CellStandard OperationTM4Ta#68 LP-SISTarget Ta#68 loaded onto TM4  Target Ta#68 loaded onto TM4 
-leak check passed
-Target electrode conductor screws
 Ta-68_Installed.jfif 
  2663   Friday, August 16, 2024, 15:28 Aaron TamSouth Hot-CellStandard OperationTM4TiC#7 HP-FEBIAD TiC#7 Target Removed from TM4 TiC#7 Target Removed from TM4. -
Photos attached 
TiC#7 Currently sitting in SHC waiting
 TiC-7_normal_exposure.jfifTiC-7_ettr.jfifTiC-7_Panel.jfifTiC-7_extraction_electrode.jfif 
  2662   Friday, August 16, 2024, 13:29 Frank SongSouth Hot-CellStandard OperationTM4Ta#68electrical check/leak check New target Ta#68 is installed on
TM4 and be leak/electric checked. Pls see
attachment.
 TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf 
  2661   Friday, August 16, 2024, 09:50 David WangSouth Hot-CellStandard OperationTM4TiC #7 febiad.TM4 has been moved from SMP to SHC.TM4 has been moved from  SMP to SHC.
The move is smooth.
 
  
  2660   Friday, August 16, 2024, 08:47 Travis CaveSpent Target VaultStandard Operation SiC#46Spent Target Move SiC#46 (pail 293) was placed in the
vault (spot 3B) on Wednesday the 14th
of August. It was 111 mSv/hr when removed
 Target_Index_2024-08-16.pdf 
  2659   Wednesday, August 14, 2024, 11:29 Aaron TamWaste Package/ShipStandard Operation SiC#46Target Disposal and visual check  SiC#46 loaded into pail 293 successfully
along with other hotcell waste 
Upon visual inspection of the target,
 SiC46.jfif 
  2658   Tuesday, August 13, 2024, 14:23 David WangITEStandard OperationTM3Ta#67.TM2 with Ta#target has been moved from SHC to ITE.TM2 with Ta#target has been moved from
SHC to ITE. the move is smooth. 
  
  2657   Tuesday, August 13, 2024, 14:18 Frank SongITEStandard OperationTM2Ta#67Module Connection TM2 with new target Ta#67 was connected
in ITE, all TP are running at their full
speed now.
 TM2_with_Ta#67_connection_in_ITE_20240813.pdf 
  2656   Tuesday, August 13, 2024, 08:39 Frank SongSouth Hot-CellStandard OperationTM2Ta#67electrical check/leak check TM2 with new target Ta#67 had been
electric/leak checked before moving to ITE.
See attachment pls.
 TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf 
ELOG V2.9.2-2455