Entry  Tuesday, August 20, 2024, 11:53, Carla Babcock, South Hot-Cell, Standard Operation, , Nb#10, Nb#10 PIE 
Nb#10 never worked online - repeller had no effect on the beam and one of the RF wires was touching HVC. Max 60pA was seen on the source cup. See notes
here ITW-TM2-Nb#10/#11-LP-IGLIS 
(Web
Entry  Tuesday, August 20, 2024, 11:36, Carla Babcock, South Hot-Cell, Standard Operation, , TiC#7, TiC#7 PIE 
TiC#7 failed after two weeks of operations - measurements in the electrical room indicated that the negative side of the CHT was broken (35kOhms to the
rest of the target). This was likely due to a large number of proton trips during this target run. At every trip I could see the CHT voltage getting higher
and more unstable. This cahnge in voltage was reflected in the unstable anode current and fluctuating RIB beam intensity, as a direct result of the fluctuating
Entry  Monday, August 19, 2024, 15:29, Frank Song, ITW/ITE, Standard Operation, TM2, Ta#67, shielding blocks transfer 
 5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving.
Entry  Monday, August 19, 2024, 09:32, David Wang, Conditioning Station, Standard Operation, TM4, Ta#68 , TM4 has been moved from SHC to TCS. 
TM4 has been moved from SHC to TCS. The move is successful. 
Entry  Friday, August 16, 2024, 15:32, Aaron Tam, South Hot-Cell, Standard Operation, TM4, Ta#68 LP-SIS, Target Ta#68 loaded onto TM4  Ta-68_Installed.jfif
 Target Ta#68 loaded onto TM4 
-leak check passed
-Target electrode conductor screws torqued to 130 in-lbs
Entry  Friday, August 16, 2024, 15:28, Aaron Tam, South Hot-Cell, Standard Operation, TM4, TiC#7 HP-FEBIAD , TiC#7 Target Removed from TM4 TiC-7_normal_exposure.jfifTiC-7_ettr.jfifTiC-7_Panel.jfifTiC-7_extraction_electrode.jfif
 TiC#7 Target Removed from TM4. - Photos attached 
TiC#7 Currently sitting in SHC waiting for disposal 
Entry  Friday, August 16, 2024, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta#68, electrical check/leak check TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
 New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment.
Entry  Friday, August 16, 2024, 09:50, David Wang, South Hot-Cell, Standard Operation, TM4, TiC #7 febiad., TM4 has been moved from SMP to SHC. 
TM4 has been moved from  SMP to SHC. The move is smooth.
 
Entry  Friday, August 16, 2024, 08:47, Travis Cave, Spent Target Vault, Standard Operation, , SiC#46, Spent Target Move Target_Index_2024-08-16.pdf
 SiC#46 (pail 293) was placed in the vault (spot 3B) on Wednesday the 14th of August. It was 111 mSv/hr when removed from the south hot
cell. See attached PDF for details.
Entry  Wednesday, August 14, 2024, 11:29, Aaron Tam, Waste Package/Ship, Standard Operation, , SiC#46, Target Disposal and visual check  SiC46.jfif
 SiC#46 loaded into pail 293 successfully along with other hotcell waste 
Upon visual inspection of the target, a spark-sign was spotted on the perimeter of the extraction electrode. Metallic looking material also found
built up between the extraction electrode and the backing plate of the target 
Entry  Tuesday, August 13, 2024, 14:23, David Wang, ITE, Standard Operation, TM3, Ta#67., TM2 with Ta#target has been moved from SHC to ITE. 
TM2 with Ta#target has been moved from SHC to ITE. the move is smooth. 
Entry  Tuesday, August 13, 2024, 14:18, Frank Song, ITE, Standard Operation, TM2, Ta#67, Module Connection TM2_with_Ta#67_connection_in_ITE_20240813.pdf
 TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now.
Entry  Tuesday, August 13, 2024, 08:39, Frank Song, South Hot-Cell, Standard Operation, TM2, Ta#67, electrical check/leak check TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
 TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls.
Entry  Monday, August 12, 2024, 15:55, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67 LP-SIS, Target Loading 
 Ta#67 Target loaded onto TM2
Leak check passed
Electrical test passed after loosening off target electrode conductor screws, and torqueing by feel 
Entry  Sunday, August 11, 2024, 11:25, Carla Babcock, South Hot-Cell, Repair, TM3, TiC#8, short on multipin wires to TBHT discovered 
With the new TiC#8 target installed on TM3, there was a ~7kOhm connection between TGHT/TBHT (A/B/C/D) and HV common. The standard electrical check on
the module showed standard values, so it was assumed the problem was inside the target.
Started removing bolts/water connections one by one to see if any of them had an effect on the measurement. Found that disconnecting the multipin
Entry  Friday, August 09, 2024, 19:01, David Wang, ITW, Standard Operation, TM3, TiC#8., TM3 has been connected in ITW. TM3_TiC#8_connection_in_ITW_checklist.pdf
TM3 has been connected in ITW. See attachment for checklist.
Entry  Friday, August 09, 2024, 18:20, David Wang, ITW, Standard Operation, TM3, TiC#8, TM3 has been moved from SHC to ITW. 
With TiC # 8 installed, TM3 has been moved from SHc to ITW. The move is smooth. 
Entry  Friday, August 09, 2024, 18:18, David Wang, ITW, Standard Operation, TM4, TiC#7, Tm4 has been moved from ITW to SMP. 
Tm4 has been moved from ITW to SMP. the move is successful. 
Entry  Friday, August 09, 2024, 16:15, Frank Song, South Hot-Cell, Repair, TM3, TiC#8, electrical check/leak check electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
 TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment
Entry  Friday, August 09, 2024, 08:11, Frank Song, ITW, Standard Operation, TM4, TiC#7, module disconnection TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf
 TM4 with spent target TiC#7 (dead) was disconnected in ITW and ready to move to TCS.