ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  909   Monday, May 04, 2015, 13:32 Anders MjosConditioning StationMaintenance  TK2 expansion tank topped upCaled cyclotron ops to open P23 and confirmed
penthouse valve open.
Filled up TK2 to 21 in water leve.
  
  1527   Monday, May 08, 2017, 09:49 David WangConditioning StationStandard Operation  TH schedule 132 update weeklyUpdate TH schedule weekly to show the job
process.
 Target_Hall_shedule_132_Apr_to_Sep.mppTarget_Hall_shedule_132_Apr_to_Sep.pdf 
  1549   Wednesday, May 24, 2017, 08:11 David WangITWStandard OperationTM2 TH schedule 132 update weeklySee attachments.  Target_Hall_shedule_132_Apr_to_Sep.mppTarget_Hall_shedule_132_Apr_to_Sep.pdf 
  1498   Wednesday, April 19, 2017, 08:29 David WangConditioning StationStandard Operation  TH schedule 132 update in first beam week Update schedule to show job process in
TH. See attachment 1,2.
 Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp 
  2407   Tuesday, January 24, 2023, 07:26 David WangConditioning StationStandard Operation  TH floor moping and garbage collelctions.Plant group and us  finished TH floor
mopping and garbage collections last Wednesday.
Th moping head had 800 count after using.
  
  2099   Thursday, June 04, 2020, 10:51 David WangConditioning StationStandard Operation  TH floor mop up.Jason Sargeant mopped up TH floor this
morning. The mop head was checked after the
job. There are 1500 counts on it. He think
  
  2080   Monday, March 09, 2020, 14:31 David WangITE/ITWStandard Operation  TH emergency exit test. Frank and I did the test.  The emergency
exit hatch on roof was opened and closed
twice. Everything works fine. 
  
  2298   Monday, January 24, 2022, 11:18 David WangITE/ITWStandard Operation  TH emergency exit hatch functional checkTH emergency exit hatch which is located
on TH west end roof is opened and closed
for functional check. The hatch works fine.
  
  1497   Thursday, April 13, 2017, 14:16 David WangCraneRepair  TH crane: east side main hoist brake assembly is replaced. Gordon Crane technician Tom Kauss finished
the replacement of the east side main hoist
brake assembly. A new set up is installed.
  
  843   Thursday, February 12, 2015, 09:11 David WangCraneRepairTM4 TH crane troubleshoot and annual inspection.Gordon crane technicians continued their
troubleshooting on this Tuesday. They found
the crane up-limit protection switch which
  
  841   Friday, February 06, 2015, 12:27 David WangCraneRepair  TH crane troubleshoot Gordon crane technician started TH crane
trouble shooting this morning. The problem
is found that there is no 115VAC power supply
  
  2809   Friday, June 06, 2025, 08:36 David WangCraneMaintenance  TH crane main hoist B starting delay issue appears again.TH crane main hoist B starting delay issue
appears again this Thursday. It is about
1 minute waiting time after power on the
  
  840   Friday, February 06, 2015, 08:06 David WangCraneRepair  TH crane lost movement controls since last Friday.Last Friday, During the crane per use check,
I found the main power supply to to crane
was shut off. I was told   Don and Travis
  
  2039   Thursday, January 02, 2020, 10:10 David WangCraneStandard Operation  TH crane issue.Target hall crane does not work properly
after TH crane main power is switched off
during  Christmas time in control room. I
  
  1523   Friday, May 05, 2017, 11:06 David WangCraneStandard OperationTM3 TH crane is used for 5 shielding blocks transferring.   TH crane is used for transferring
five shielding  blocks(30000lbs) today. All
brakes work fine. Mostly, I do not need 
  
  1563   Friday, June 23, 2017, 12:08 David WangCraneRepair  TH crane inspection and probem fixing by Gordon crane Gordon crane technician Peter came in today
and checked TH crane. Maico  and I were there
with him. What he found is that brake gap
  
  1534   Friday, May 12, 2017, 07:42 David WangCraneRepair  TH crane burning smell, smoke, and big noise on east side main hoist brake assembly.This morning, when I prepare for today's
crane check,  The crane made a very strong
noise without any load during the full  speed
  
  1516   Monday, May 01, 2017, 12:32 David WangCraneRepair  TH crane burning smellTH crane burning smell showed again this
morning. It  appeared after 1-1.5 hours of
continuously using during the F308 flasks
  
  844   Monday, February 16, 2015, 11:57 David WangCraneRepair  TH craneDave.Morris installed a new battery on
crane control PLC board and uploaded the
program. Travis, Dan and I tested the crane
  
  849   Thursday, February 26, 2015, 09:22 David WangITWStandard Operation  TH Shut Down Activities Schedule Feb 23th- Mar 25thTH shut down activities schedule from Feb
23th-March 25th. The schedule will be updated
each week. See attachment 1.
 Target_Hall_shut_down_activities.mppTarget_Hall_shut_down_activities.pdf 