909
|
Monday, May 04, 2015, 13:32 |
Anders Mjos | Conditioning Station | Maintenance | | | TK2 expansion tank topped up | Caled cyclotron ops to open P23 and confirmed
penthouse valve open.
Filled up TK2 to 21 in water leve. |
|
1527
|
Monday, May 08, 2017, 09:49 |
David Wang | Conditioning Station | Standard Operation | | | TH schedule 132 update weekly | Update TH schedule weekly to show the job
process. |
 |
1549
|
Wednesday, May 24, 2017, 08:11 |
David Wang | ITW | Standard Operation | TM2 | | TH schedule 132 update weekly | See attachments. |
 |
1498
|
Wednesday, April 19, 2017, 08:29 |
David Wang | Conditioning Station | Standard Operation | | | TH schedule 132 update in first beam week | Update schedule to show job process in
TH. See attachment 1,2. |
 |
2407
|
Tuesday, January 24, 2023, 07:26 |
David Wang | Conditioning Station | Standard Operation | | | TH floor moping and garbage collelctions. | Plant group and us finished TH floor
mopping and garbage collections last Wednesday.
Th moping head had 800 count after using. |
|
2099
|
Thursday, June 04, 2020, 10:51 |
David Wang | Conditioning Station | Standard Operation | | | TH floor mop up. | Jason Sargeant mopped up TH floor this
morning. The mop head was checked after the
job. There are 1500 counts on it. He think |
|
2080
|
Monday, March 09, 2020, 14:31 |
David Wang | ITE/ITW | Standard Operation | | | TH emergency exit test. | Frank and I did the test. The emergency
exit hatch on roof was opened and closed
twice. Everything works fine. |
|
2298
|
Monday, January 24, 2022, 11:18 |
David Wang | ITE/ITW | Standard Operation | | | TH emergency exit hatch functional check | TH emergency exit hatch which is located
on TH west end roof is opened and closed
for functional check. The hatch works fine. |
|
1497
|
Thursday, April 13, 2017, 14:16 |
David Wang | Crane | Repair | | | TH crane: east side main hoist brake assembly is replaced. | Gordon Crane technician Tom Kauss finished
the replacement of the east side main hoist
brake assembly. A new set up is installed. |
|
843
|
Thursday, February 12, 2015, 09:11 |
David Wang | Crane | Repair | TM4 | | TH crane troubleshoot and annual inspection. | Gordon crane technicians continued their
troubleshooting on this Tuesday. They found
the crane up-limit protection switch which |
|
841
|
Friday, February 06, 2015, 12:27 |
David Wang | Crane | Repair | | | TH crane troubleshoot | Gordon crane technician started TH crane
trouble shooting this morning. The problem
is found that there is no 115VAC power supply |
|
2809
|
Friday, June 06, 2025, 08:36 |
David Wang | Crane | Maintenance | | | TH crane main hoist B starting delay issue appears again. | TH crane main hoist B starting delay issue
appears again this Thursday. It is about
1 minute waiting time after power on the |
|
840
|
Friday, February 06, 2015, 08:06 |
David Wang | Crane | Repair | | | TH crane lost movement controls since last Friday. | Last Friday, During the crane per use check,
I found the main power supply to to crane
was shut off. I was told Don and Travis |
|
2039
|
Thursday, January 02, 2020, 10:10 |
David Wang | Crane | Standard Operation | | | TH crane issue. | Target hall crane does not work properly
after TH crane main power is switched off
during Christmas time in control room. I |
|
1523
|
Friday, May 05, 2017, 11:06 |
David Wang | Crane | Standard Operation | TM3 | | TH crane is used for 5 shielding blocks transferring. | TH crane is used for transferring
five shielding blocks(30000lbs) today. All
brakes work fine. Mostly, I do not need |
|
1563
|
Friday, June 23, 2017, 12:08 |
David Wang | Crane | Repair | | | TH crane inspection and probem fixing by Gordon crane | Gordon crane technician Peter came in today
and checked TH crane. Maico and I were there
with him. What he found is that brake gap |
|
1534
|
Friday, May 12, 2017, 07:42 |
David Wang | Crane | Repair | | | TH crane burning smell, smoke, and big noise on east side main hoist brake assembly. | This morning, when I prepare for today's
crane check, The crane made a very strong
noise without any load during the full speed |
|
1516
|
Monday, May 01, 2017, 12:32 |
David Wang | Crane | Repair | | | TH crane burning smell | TH crane burning smell showed again this
morning. It appeared after 1-1.5 hours of
continuously using during the F308 flasks |
|
844
|
Monday, February 16, 2015, 11:57 |
David Wang | Crane | Repair | | | TH crane | Dave.Morris installed a new battery on
crane control PLC board and uploaded the
program. Travis, Dan and I tested the crane |
|
849
|
Thursday, February 26, 2015, 09:22 |
David Wang | ITW | Standard Operation | | | TH Shut Down Activities Schedule Feb 23th- Mar 25th | TH shut down activities schedule from Feb
23th-March 25th. The schedule will be updated
each week. See attachment 1. |
 |