Entry  Monday, May 04, 2015, 13:32, Anders Mjos, Conditioning Station, Maintenance, , , TK2 expansion tank topped up 
Caled cyclotron ops to open P23 and confirmed penthouse valve open.
Filled up TK2 to 21 in water leve.
Entry  Monday, May 08, 2017, 09:49, David Wang, Conditioning Station, Standard Operation, , , TH schedule 132 update weekly Target_Hall_shedule_132_Apr_to_Sep.mppTarget_Hall_shedule_132_Apr_to_Sep.pdf
Update TH schedule weekly to show the job process.
Entry  Wednesday, May 24, 2017, 08:11, David Wang, ITW, Standard Operation, TM2, , TH schedule 132 update weekly Target_Hall_shedule_132_Apr_to_Sep.mppTarget_Hall_shedule_132_Apr_to_Sep.pdf
See attachments.
Entry  Wednesday, April 19, 2017, 08:29, David Wang, Conditioning Station, Standard Operation, , , TH schedule 132 update in first beam week  Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp
Update schedule to show job process in TH. See attachment 1,2.
Entry  Tuesday, January 24, 2023, 07:26, David Wang, Conditioning Station, Standard Operation, , , TH floor moping and garbage collelctions. 
Plant group and us  finished TH floor mopping and garbage collections last Wednesday. Th moping head had 800 count after using. all garbage were
bagged , checked, tagged, and sent to radwaste area. 
Entry  Thursday, June 04, 2020, 10:51, David Wang, Conditioning Station, Standard Operation, , , TH floor mop up. 
Jason Sargeant mopped up TH floor this morning. The mop head was checked after the job. There are 1500 counts on it. He think this level is reasonable
low. 3000 counts would be normal in past. 
Entry  Monday, March 09, 2020, 14:31, David Wang, ITE/ITW, Standard Operation, , , TH emergency exit test.  
Frank and I did the test.  The emergency exit hatch on roof was opened and closed twice. Everything works fine. 
Entry  Monday, January 24, 2022, 11:18, David Wang, ITE/ITW, Standard Operation, , , TH emergency exit hatch functional check 
TH emergency exit hatch which is located on TH west end roof is opened and closed for functional check. The hatch works fine. The limit switch on hatch
is in position. No obstacle on hatch way to the roof.  
Entry  Thursday, April 13, 2017, 14:16, David Wang, Crane, Repair, , , TH crane: east side main hoist brake assembly is replaced.  
Gordon Crane technician Tom Kauss finished the replacement of the east side main hoist brake assembly. A new set up is installed. he adjusted gap too
close during first time try. So, the smell appeared when operate the brake. He increased the gap to a proper distance then. It looks like everything works
fine now. Still, The brake need to be tested with 10K lBS load on it. We will do the load test on next Thursday when he come here to replace west side
Entry  Thursday, February 12, 2015, 09:11, David Wang, Crane, Repair, TM4, , TH crane troubleshoot and annual inspection. 
Gordon crane technicians continued their troubleshooting on this Tuesday. They found the crane up-limit protection switch which is installed on the same
bracket with the the crane down view camera is broken. The spring inside the limit switch  which is used for pushing the action plunge out in the
switch lost its function. This up limit switch is the last protection for the crane so it is set as when it is in action the crane main contact coil 
Entry  Friday, February 06, 2015, 12:27, David Wang, Crane, Repair, , , TH crane troubleshoot  
Gordon crane technician started TH crane trouble shooting this morning. The problem is found that there is no 115VAC power supply to energize  a
main coil which is used to switch on 450V AC power supply to crane. He did a test and found  the crane could be operated  by big yellow pedant
in control room when he manually gave the coil 115VAC power supply to energize it.. At that moment, the crane is set to big yellow pedant operating mode.
Entry  Friday, June 06, 2025, 08:36, David Wang, Crane, Maintenance, , , TH crane main hoist B starting delay issue appears again. 
TH crane main hoist B starting delay issue appears again this Thursday. It is about 1 minute waiting time after power on the crane. this is an old problem
we spent so much time in investigation and tried solve during last summer and fall. During this period, the delay time became shorter and the problem disappeared
completely in November. It worked fine since then  until this this day. TH crane still works fine other than it. I will watch in this issue closely. 
Entry  Friday, February 06, 2015, 08:06, David Wang, Crane, Repair, , , TH crane lost movement controls since last Friday. 
Last Friday, During the crane per use check, I found the main power supply to to crane was shut off. I was told   Don and Travis shut off the main
power before Triumf power outage. Travis restored crane main power and I  could turn on the main relay on radio pedant  in TH.  But, I didnt
have all crane main bridge movement controls on TH raido pedant except rotation. I still have all movement controls on small trolley from the radio pedant.
Entry  Thursday, January 02, 2020, 10:10, David Wang, Crane, Standard Operation, , , TH crane issue. 
Target hall crane does not work properly after TH crane main power is switched off during  Christmas time in control room. I switched the main power
back this morning. The only movement could be operated is crane rotation.  Power is supplied crane. The control  on N-S, E-W and up-down  movements
do not work. We had the same problem last year. After trouble shooting, It was pointed to a PLC battery issue. Control group changed the battery and reloaded
Entry  Friday, May 05, 2017, 11:06, David Wang, Crane, Standard Operation, TM3, , TH crane is used for 5 shielding blocks transferring.  
  TH crane is used for transferring five shielding  blocks(30000lbs) today. All brakes work fine. Mostly, I do not need  crane slow up motion for
this job so during 1 hour moving, no rattle  sound and burning smell has been found.  I think TH crane is good to use as we decided.  
Entry  Friday, June 23, 2017, 12:08, David Wang, Crane, Repair, , , TH crane inspection and probem fixing by Gordon crane  
Gordon crane technician Peter came in today and checked TH crane. Maico  and I were there with him. What he found is that brake gap on both side  of
main hoist decreased after months of using.  The solution is to lock  the automatic self adjustment system so the gap will be fixed there.  Each year
during annual inspection, they will adjust the gap manually.  After he locked both side of device, I tested the crane up and down  couple of times. The
Entry  Friday, May 12, 2017, 07:42, David Wang, Crane, Repair, , , TH crane burning smell, smoke, and big noise on east side main hoist brake assembly. 
This morning, when I prepare for today's crane check,  The crane made a very strong noise without any load during the full  speed up motion. I stopped
the crane right away, and noticed that east  side of main hoist motor area was smoking . The crane was moved to east  end. And, I climbed up to the top,
and found the smoke is coming form  brake side, and should be produced by braking. The smell is same as  before.Unless other thing is wrong,  I think
Entry  Monday, May 01, 2017, 12:32, David Wang, Crane, Repair, , , TH crane burning smell 
TH crane burning smell showed again this morning. It  appeared after 1-1.5 hours of continuously using during the F308 flasks  moving in TH.After a certain
time of using I think the brake gap is  reduced because of  thermal expansion. The main hoist and brakes work  fine still. We knew these brakes gap
are tight especially on west side.  So, It is not surprised that this burning smell appeared again. It does  not affect the safe of crane use in my view.
Entry  Monday, February 16, 2015, 11:57, David Wang, Crane, Repair, , , TH crane 
Dave.Morris installed a new battery on crane control PLC board and uploaded the program. Travis, Dan and I tested the crane in local, remote, and test
mode. The crane works fine. Also, the TH lock up has been tested. Everything is good.
Entry  Thursday, February 26, 2015, 09:22, David Wang, ITW, Standard Operation, , , TH Shut Down Activities Schedule Feb 23th- Mar 25th Target_Hall_shut_down_activities.mppTarget_Hall_shut_down_activities.pdf
TH shut down activities schedule from Feb 23th-March 25th. The schedule will be updated each week. See attachment 1.
Feb-27-2015: Updated the schedule, and uploaded as PDF file. See attachment 2.