  492   Sunday, October 06, 2013, 00:17 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2high voltage conditioninghigh voltage conditioning was carried out
over the day up to 24 kV. i will leave it
at 20 kV over night. Current is at 22 micro
  
  493   Sunday, October 06, 2013, 15:39 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2HEATERS STARTEDThe high voltage was sparking several times
during the night. It may be correlated with
the cycling of the cooling water temperature
  
  494   Sunday, October 06, 2013, 17:08 Friedhelm AmesConditioning StationDevelopmentTM3NiO#2trip of all power suppliesAll power supplies tripped on high conductivity
of the cooling water < 5 MOhm, It is not
clear if this was caused by a spark or vice
  
  495   Sunday, October 06, 2013, 20:28 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2turbo pumps stoppedvacuum readings before stopping
IG1: 7.4e-7 T
IG2 3.8 e-6 T
  
  1081   Thursday, September 24, 2015, 14:59 Friedhelm AmesConditioning StationStandard OperationTM4Ta#46start high voltage conditioning    
  2192   Thursday, February 25, 2021, 10:09 Frank SongITERepair  Disconnect Entrance Module in ITE David and I disconnected entrance
module in ITE by following the procedure
# 190510. And, the yoke was installed and
  
  2198   Thursday, March 11, 2021, 11:42 Frank SongITEMaintenance  ITE water flow wheels and coils replacement. ITE water flow wheels
and coils are replaced. Wheels and coils
  
  2202   Wednesday, March 17, 2021, 11:43 Frank SongITERepair  Re-connect Entrance Module in ITE  David and I re-connect Entrance module
at ITE after the monitor been replaced at
SHC. 
 job_done_by_following_#190510.pdf 
  2215   Monday, May 03, 2021, 15:14 Frank SongITEMaintenance  High voltage test in ITE Anders and I prepared ITE high voltage
test in April 30 ( Friday morning), The MAA
is locked for this.
  
  2245   Friday, September 17, 2021, 12:20 Frank SongNorth Hot-CellStandard OperationTM4Sic#41TM4 SIS with Target and No external Connections TM4 electric check with new target
was done by David. A pic attached here for
ref.
 IMG_3603.jpg 
  2246   Friday, September 17, 2021, 12:34 Frank SongITEStandard OperationTM4Sic#41Module Connection TM4 with a new target was moved back
from NHC to ITE and reconnected at pit. The
5 shielding blocks were installed as well.
 IMG_3602.jpgIMG_3601.jpgIMG_3600.jpgIMG_3599.jpg 
  2252   Monday, October 04, 2021, 09:27 Frank SongITWStandard OperationTM2C#3Module Connection TM2 been connected with new target
C#3 in ITW. 
 IMG_3711.jpgIMG_3712.jpgIMG_3713.jpgIMG_3714.jpg 
  2253   Monday, October 04, 2021, 09:33 Frank SongNorth Hot-CellStandard OperationTM2C#3TM2 with target connection test the test was done when TM2 sit on
NHC.
 IMG_3710.jpg 
  2254   Monday, October 04, 2021, 09:37 Frank SongITEStandard OperationTM4Sic#41module disconnection TM4 was disconnected and moved to
NHC. 
 IMG_3715.jpgIMG_3716.jpgIMG_3717.jpg 
  2257   Friday, October 08, 2021, 11:19 Frank SongNorth Hot-CellStandard OperationTM4UCx#35TM4 IGLIS target electrical tests the tests were done when TM4 was
on NHC. see attached photos please.
 IMG_3739.jpgIMG_3740.jpg 
  2258   Friday, October 08, 2021, 12:39 Frank SongITEStandard OperationTM4UCx#35Module Connection the module with target UC#35 was
connected in ITE and being pumped down.
 IMG_3742.jpgIMG_3741.jpgIMG_3743.jpgIMG_3744.jpg 
  2260   Tuesday, October 26, 2021, 11:01 Frank SongITEStandard OperationTM4UCx#35shielding blocks transfer the five shielding blocks have been
moved from ITW to ITE. 
  
  2262   Tuesday, November 09, 2021, 09:58 Frank SongITWStandard OperationTM2C#3module disconnection the module TM2 with target C#3 was
disconnected at ITW and is being remoted
moving to SHC.
 IMG_4315.jpg 
  2264   Wednesday, November 10, 2021, 08:29 Frank SongSouth Hot-CellStandard OperationTM2UC#36electrical check An electrical check of TM2 with target
UC#36 and no external connections was finished
at SHC. 
 IMG_4322.JPG 
  2265   Wednesday, November 10, 2021, 08:32 Frank SongITWStandard OperationTM2UC#36Module Connection TM2 with target UC#36 was connected
at ITW.
 IMG_4323.JPG 