492
|
Sunday, October 06, 2013, 00:17 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | high voltage conditioning | high voltage conditioning was carried out
over the day up to 24 kV. i will leave it
at 20 kV over night. Current is at 22 micro |
|
|
493
|
Sunday, October 06, 2013, 15:39 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | HEATERS STARTED | The high voltage was sparking several times
during the night. It may be correlated with
the cycling of the cooling water temperature |
|
|
494
|
Sunday, October 06, 2013, 17:08 |
Friedhelm Ames | Conditioning Station | Development | TM3 | NiO#2 | trip of all power supplies | All power supplies tripped on high conductivity
of the cooling water < 5 MOhm, It is not
clear if this was caused by a spark or vice |
|
|
495
|
Sunday, October 06, 2013, 20:28 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | turbo pumps stopped | vacuum readings before stopping
IG1: 7.4e-7 T
IG2 3.8 e-6 T |
|
|
1081
|
Thursday, September 24, 2015, 14:59 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM4 | Ta#46 | start high voltage conditioning | |
|
|
2192
|
Thursday, February 25, 2021, 10:09 |
Frank Song | ITE | Repair | | | Disconnect Entrance Module in ITE | David and I disconnected entrance
module in ITE by following the procedure
# 190510. And, the yoke was installed and |
|
|
2198
|
Thursday, March 11, 2021, 11:42 |
Frank Song | ITE | Maintenance | | | ITE water flow wheels and coils replacement. | ITE water flow wheels
and coils are replaced. Wheels and coils |
|
|
2202
|
Wednesday, March 17, 2021, 11:43 |
Frank Song | ITE | Repair | | | Re-connect Entrance Module in ITE | David and I re-connect Entrance module
at ITE after the monitor been replaced at
SHC. |
|
|
2215
|
Monday, May 03, 2021, 15:14 |
Frank Song | ITE | Maintenance | | | High voltage test in ITE | Anders and I prepared ITE high voltage
test in April 30 ( Friday morning), The MAA
is locked for this. |
|
|
2245
|
Friday, September 17, 2021, 12:20 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#41 | TM4 SIS with Target and No external Connections | TM4 electric check with new target
was done by David. A pic attached here for
ref. |
|
|
2246
|
Friday, September 17, 2021, 12:34 |
Frank Song | ITE | Standard Operation | TM4 | Sic#41 | Module Connection | TM4 with a new target was moved back
from NHC to ITE and reconnected at pit. The
5 shielding blocks were installed as well. |
|
|
2252
|
Monday, October 04, 2021, 09:27 |
Frank Song | ITW | Standard Operation | TM2 | C#3 | Module Connection | TM2 been connected with new target
C#3 in ITW. |
|
|
2253
|
Monday, October 04, 2021, 09:33 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | C#3 | TM2 with target connection test | the test was done when TM2 sit on
NHC. |
|
|
2254
|
Monday, October 04, 2021, 09:37 |
Frank Song | ITE | Standard Operation | TM4 | Sic#41 | module disconnection | TM4 was disconnected and moved to
NHC. |
|
|
2257
|
Friday, October 08, 2021, 11:19 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#35 | TM4 IGLIS target electrical tests | the tests were done when TM4 was
on NHC. see attached photos please. |
|
|
2258
|
Friday, October 08, 2021, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | Module Connection | the module with target UC#35 was
connected in ITE and being pumped down. |
|
|
2260
|
Tuesday, October 26, 2021, 11:01 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | shielding blocks transfer | the five shielding blocks have been
moved from ITW to ITE. |
|
|
2262
|
Tuesday, November 09, 2021, 09:58 |
Frank Song | ITW | Standard Operation | TM2 | C#3 | module disconnection | the module TM2 with target C#3 was
disconnected at ITW and is being remoted
moving to SHC. |
|
|
2264
|
Wednesday, November 10, 2021, 08:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | UC#36 | electrical check | An electrical check of TM2 with target
UC#36 and no external connections was finished
at SHC. |
|
|
2265
|
Wednesday, November 10, 2021, 08:32 |
Frank Song | ITW | Standard Operation | TM2 | UC#36 | Module Connection | TM2 with target UC#36 was connected
at ITW. |
|