  ID Date Author Category Type Module Target/Number Subject
  1608   Wednesday, August 30, 2017, 11:37 Travis CaveSpent Target VaultStandard Operation Ta#52Spent Target move

The spent Ta#52 target has been moved from the south hot cell to the spent target vault. See attached PDF for details.

Attachment 1: Vault_Storage_August_30_2017.pdf
Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf
  1607   Tuesday, August 29, 2017, 09:01 David WangConditioning StationStandard OperationTM4 TM4 has been connnected at TCS.

TM4 has been connected at TCS. TCS water system has been started for TM4. TM4 and TCS vacuum pumping down is good so far.

  1606   Tuesday, August 29, 2017, 08:59 David WangConditioning StationStandard OperationTM4 TM4 HS line leak checks

TM4 HS line leak checks are done, at SHC and TCS. SHC: Helium spray. TCS: Helium  pressurize 70psi.  LD base LR 0.0 X E-9 atm.cc/sec.  No leak has been found on both leak checks. 

  1605   Monday, August 28, 2017, 14:40 Travis CaveSouth Hot-CellStandard OperationTM4UC#21Electrical Check

The results of the electrical check of TM#4 with UC#21 attached.

Attachment 1: TM4_UC21_elecchk_SHC.PDF
TM4_UC21_elecchk_SHC.PDF
  1604   Monday, August 28, 2017, 14:34 Travis CaveConditioning StationStandard OperationTM4UC#21Module move

 TM#4 with UC#21 has been moved from the south hot cell to the conditioning station.

  1603   Monday, August 28, 2017, 12:07 chad fisherSouth Hot-CellStandard OperationTM4UCx#21Ta#52 removed UCx#21 installed

Ta#52 has been removed from TM$ and UCx#21 installed with new mounting and high current hardware. High current fasteners torqued to 130 in lbs.

  1602   Monday, August 28, 2017, 11:28 Travis CaveITEStandard OperationTM4Ta#52Module move

 TM#4 with Ta#52 has been moved from the east station to the south hot cell.

  1601   Friday, August 25, 2017, 16:33 Anders MjosConditioning StationRepair  Testing HV after cooling line repair

 The BIAS voltage was brought up to 70 kV today and held there for 1h. No sparking observed.

Attachment 1: 2017-08-25_HV_Water_Line_Test.xlsx
  1600   Thursday, August 17, 2017, 14:38 Isaac EarleNorth Hot-CellDevelopment  4/6 NHC roof blocks installed

 Roof blocks IRH1641, IRH1642, IRH1643, and IRH1644 have been fully assembled, labeled, and installed as per drawing IRH1652.  Fabrication of TCS shield block (IRH1646) and NHC module port block (IRH1645) is still in progress.

 IMG_0381.jpg

 

IMG_0369.jpg

 

IMG_0368.jpg

 

IMG_0364.jpg

 

IMG_0362.jpg

 

IMG_0340.jpg

Attachment 1: IMG_0381.jpg
IMG_0381.jpg
  1599   Tuesday, August 15, 2017, 12:10 Isaac EarleNorth Hot-CellDevelopment  ISAC Active Sump low water level measured

The ISAC active sump in the Active Service Room (#002 on B2 level) was pumped out yesterday using the standard procedure (Section 5.5.2 of the ISAC Operators' Manual, V1.0).  The procedure makes use of the auto stop feature of the pump-out system which stops when a low level float switch is triggered.  The water level was measured after pumping stopped, and was found to be approximately 21" above the base of the sump.  A new section of pipe will be added to the 4" drain line in the sump to move the drain opening below the low level water line so that air in the sump is not pulled into the drain network (which could end up in the NHC or TCS space).

  1598   Tuesday, August 15, 2017, 09:30 Anders MjosITWStandard OperationTM2Ta#53TM2 radiation fields

Travis Cave wrote:

TM#2 with Ta#53 has been moved from the conditioning station to the west target station.

 by Travis (measured at ~ 2' from module on service tray side):

at 3' 325 uSv/h

at 2' 640 uSv/h

  1597   Tuesday, August 15, 2017, 09:27 Anders MjosSouth Hot-CellStandard OperationTM2SiC#36Electrical Check of target in SHC

Travis Cave wrote:

The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well.

by David and Chad after target removed from module:

Anode to target @500V - 65Kohm
Anode to HS - dead short
Target to HS@500V -62Kohm.

  1596   Wednesday, August 09, 2017, 16:39 Isaac EarleNorth Hot-CellDevelopment  NHC drain line into sump identified

 The NHC drain line was tested by pouring approximately 10 gallons of water through the drain grate at the base of the NHC partition wall.  Water was seen a few minutes later pouring into the sump labeled "ACTIVE SUMP" from the light coloured pipe on the west side of the inside of the sump.  Rob Walker had previously said that the hot cells drain into the sump next to this one which is labeled "SANITARY SUMP", which appears to be incorrect.

  1595   Tuesday, August 08, 2017, 13:26 Travis CaveITWStandard OperationTM2Ta#53module moved

TM#2 with Ta#53 has been moved from the conditioning station to the west target station.

  1594   Thursday, August 03, 2017, 17:08 Anders MjosConditioning StationRepairTM2 Power bump

 Thursday, August 03, 2017, 17:08: Restarting vacuum and water system

  1593   Thursday, August 03, 2017, 15:02 Travis CaveSpent Target VaultStandard Operation SiC#36Spent Target Move

 The spent SiC#36 has been moved from the south hot cell to the spent target vault.

Attachment 1: Vault_Storage_August_3_2017.pdf
Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf
  1592   Wednesday, August 02, 2017, 15:41 Keith C NgAssembly/Bench TestDevelopment  spare source tray build

After re zeroing alignment telescope to master jig and adjusted parts into place:

 

Orientation: X = Left -, Right+; Y = Up +, Down -

 

Front wire target

X = 0.000, Y = 0.000

 

Rear wire target

X = 0.000, Y = +.008" (high)

 

All fasteners torqued to specification, steerer housing and assembly not installed yet. Weight of steerer assembly might cause rear to sag into place. Otherwise may attempt to split difference between the front and rear elements (alignment is on an angle in the horizontal vertical plane.)

Attachment 1: 20170802_sourcetray_RHB_8264.JPG
20170802_sourcetray_RHB_8264.JPG
Attachment 2: 20170802_sourcetray_RHB_8266.JPG
20170802_sourcetray_RHB_8266.JPG
  1591   Wednesday, August 02, 2017, 15:13 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.

HS line is leak checked at SHC this afternoon by helium spay.  Leak detector base LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4 torr. No leak has been found. This line will be helium pressured  at TCS. It had  a 1.7XE-7 atm.cc/sec leak rate on 70 psi helium at TCS  during last two target  checks.

 2017-08-03. Helium pressure test on TM2 HS line at TCS is done. 70psi helium, 3 minutes. base leak rate 0.0xE-7 atm.cc/sec. Result: 1.8XE-7atm.cc/sec leak which is almost same as before. This line has a very small leak on water block seal under helium pressure test  which we knew already. 

  1590   Wednesday, August 02, 2017, 15:09 David WangITWStandard OperationTM2 TM2 was disconnencted in ITW yesterday.

Tm2 was disconnected in ITW yesterday. ITW EL cable crimp ring was broken. John Chow replaced this ring this afternoon.

  1589   Tuesday, August 01, 2017, 14:39 Travis CaveSouth Hot-CellStandard OperationTM2SiC#36Electrical Check

The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well.

Attachment 1: TM2_SiC36_SHC_elec_chk.PDF
TM2_SiC36_SHC_elec_chk.PDF
Attachment 2: TM2_SiC36_Postbeam_SHC_elec_chk.PDF
TM2_SiC36_Postbeam_SHC_elec_chk.PDF