ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  608   Tuesday, February 25, 2014, 06:53 David WangSouth Hot-CellRepairTM2 Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.Chad and I did the leak check   on
TM2 tube heater (+) water line  with
blank off and C-seal  installed on 
  
  609   Tuesday, February 25, 2014, 10:00 David WangConditioning StationRepairTM2 helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.I did the helium pressure  test 
on TM2 tube heater (+) water line  with
blank off(C-seal) installed on  water
 10x 
  611   Wednesday, March 05, 2014, 10:07 Travis CaveConditioning StationStandard OperationTM2no targetmodule moveTM#2 with no target or source tray has
been moved from the conditioning station
to the north east silo. TM#1 with no target
  
  713   Thursday, July 24, 2014, 09:10 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moveTM#2 has been moved to the hot cell from
the north east silo.
  
  714   Thursday, July 24, 2014, 18:21 Grant MinorSouth Hot-CellRepairTM2No target / no source trayLeak check on TM2 ionizer tube cooling lines C and D - module sideTarget Ionizer tube cooling lines "C"
and "D" in Target Module 2 were
both leak checked at the Hot Cell. 
 ITA6021_Rev_14_screencapture_cooling_lines_24July2014.jpgTM2_hot_cell_leak_check_tube_heater_C_D_24July2014_small2.jpgTM2_hot_cell_leak_check_no_source_tray_24july2014.JPG 
  715   Monday, July 28, 2014, 09:29 Travis CaveConditioning StationStandard OperationTM2no targetmodule moveTM#2 has been moved from the south hot
cell to the conditioning station.
  
  716   Monday, July 28, 2014, 14:37 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D)and -(C)water lines.
    TM2 installed in Conditioning
Station
    Varian Leak detector
connected directly to Target Module 2   
 7x 
  717   Monday, July 28, 2014, 14:45 David WangConditioning StationDevelopmentTM2 turned off TM2 and CS turbo pumps.I turned off TM2 and CS turbo-pumps. TM2
will be moved from CS to silo tomorrow morning.
  
  803   Friday, November 28, 2014, 13:06 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moveTM#2 with no target or source tray has
been moved from the north east silo to the
south hot cell.
  
  805   Monday, December 01, 2014, 14:06 chad fisherSouth Hot-CellRepairTM2 TM2 REFURB. WATER LOOP TESTSome issues with the turntable and having
to wait for a decision on whether to remove
TM2 from the hot cell so that TM4 with dead
 TM2_20141201_01.JPGTM2_20141201_02.JPGTM2_20141201_03.JPGTM2_20141201_04.JPGTM2_20141201_05AC.jpg 
  807   Tuesday, December 02, 2014, 10:15 chad fisherSouth Hot-CellRepairTM2 TM2 Reburb. Loop InstallFinal polish, clean with methanol and clean
compressed air.
Loop installed and torqued to 90
 TM2_20141202_01.jpg20141203_142215.jpg20141203_143530.jpg 
  808   Tuesday, December 02, 2014, 13:33 David WangSouth Hot-CellDevelopmentTM2 Leak check on TM2 tube heater +(D) at SHCChad and I leak checked TM2 tube heater+(D)
circuit at SHC with water bypass loop and
new seals installed on the water block. The
 2014-12-02_003.JPG2014-12-02_001.JPG2014-12-02_004.JPG 
  809   Thursday, December 04, 2014, 09:49 Travis CaveConditioning StationStandard OperationTM2no targetmodule moveTM#2 has been moved from the south hot
cell to the conditioning station.
  
  810   Thursday, December 04, 2014, 09:54 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical checkResults of electrical check of TM#2 with
no source tray and no containment box attached.
See PDF for results.
 TM2_elec_check_no_source_traySHC.PDF 
  812   Thursday, December 04, 2014, 16:37 David WangConditioning StationDevelopmentTM2 connected TM2 and CS vacuum system .I connected TM2 and CS vacuum system. All
vacuum pumps on TM2 and CS are started .The
pumping down is good so .far
  
  813   Friday, December 05, 2014, 07:47 David WangConditioning StationDevelopmentTM2 TM2 at CSThe pumping down on TM2 at CS was good
overnight. However, the back up line pressure
is still too high for LD to get to 0.0-E-9atm.cc/sec
  
  814   Friday, December 05, 2014, 11:58 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D) water lines.At CS, The leak detector is hooked directly
to the TM2 top service cap. The base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4torr. Applied
 6x 
  815   Friday, December 05, 2014, 13:46 Anders MjosConditioning StationDevelopmentTM2 Not able to start water system TCS:WPV1 does not open when staging
is enabled. Multiple attempts have been made,
but the valve remains closed.
  
  816   Friday, December 05, 2014, 15:41 Anders MjosConditioning StationDevelopmentTM2 RGA resultsMeasurement taken at 14:25. IG2 at ~7.7E-6
T
 2014-12-05-14-25_TM2.png2014-12-05-14-25_TM2.txt 
  817   Monday, December 08, 2014, 13:52 Anders MjosConditioning StationDevelopmentTM2 Fixed - Not able to start water system

    

       
            
  