  608   Tuesday, February 25, 2014, 06:53 David WangSouth Hot-CellRepairTM2 Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.

Chad and I did the leak check   on TM2 tube heater (+) water line  with blank off and C-seal  installed on  WB at South Hot Cell.The line was easy to pump down to 0.0xE-9atm.cc/sec and 0.0XE-4 torr on leak detector. Chad flushed lot helium around the water block (10 sec spray). No response had been found on leak detector.

  609   Tuesday, February 25, 2014, 10:00 David WangConditioning StationRepairTM2 helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.

I did the helium pressure  test  on TM2 tube heater (+) water line  with blank off(C-seal) installed on  water block at CS.The leak detector was hooked directly to the top of the module this time. So base leak rate and base pressure were at the bottom scale on LD. 30 -80 psi helium was applied to the D lines(both side)  with10 psi   increasing each time. There is no any tiny response hasbeen found during the test. The lines are perfectly sealed. Also i sprayed the helium on the top of the service cap .All  air to vacuum seals on the top are good either. See attachment pictures.

Attachment 1: 004.JPG
004.JPG
Attachment 2: 005.JPG
005.JPG
Attachment 3: 006.JPG
006.JPG
Attachment 4: 007.JPG
007.JPG
Attachment 5: 008.JPG
008.JPG
Attachment 6: 009.JPG
009.JPG
Attachment 7: 010.JPG
010.JPG
Attachment 8: 011.JPG
011.JPG
Attachment 9: 017.JPG
017.JPG
Attachment 10: 019.JPG
019.JPG
  611   Wednesday, March 05, 2014, 10:07 Travis CaveConditioning StationStandard OperationTM2no targetmodule move

TM#2 with no target or source tray has been moved from the conditioning station to the north east silo. TM#1 with no target has been moved into the conditioning station.

  713   Thursday, July 24, 2014, 09:10 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule move

TM#2 has been moved to the hot cell from the north east silo.

  714   Thursday, July 24, 2014, 18:21 Grant MinorSouth Hot-CellRepairTM2No target / no source trayLeak check on TM2 ionizer tube cooling lines C and D - module side

Target Ionizer tube cooling lines "C" and "D" in Target Module 2 were both leak checked at the Hot Cell.  The lines were both blanked-off.

Bill Paley was present with David Wang in the Target Hall, operating the leak detector.  Grant Minor and Anders Mjos were present with Chad Fisher at the Hot Cell.

The "D" circuit was already blanked off with a copper blank containing silver brazed stainless steel inserts and indium plated inconel c-seals.

The "C" circuit was already blanked off with an aluminum blank and rubber o-rings.

The cooling lines are indicated in the attached screencapture from ITA6021 Rev .14, and are also labelled in the attached photo.

The "D" circuit was checked first, starting at around 12pm.

1.  The helium flow was tested by blowing dust on the work table.

2. The base leak rate on the Varian leak detector was confirmed in the "D" circuit to be stable at 10^-9 atm cc / sec and the pressure was 10^-4 Torr.

3. Each soldered joint on the "D" circuit was sprayed with a 2-second blast of helium - no response at the Varian.

4. The joint between the module-half of the water block and the copper blank-off was sprayed with a 2-second burst - no response.

5. A general area flood of helium sprayed for 10 seconds was applied all around both the "D" and "C" blocks - no response.

It was concluded that the "D" circuit had passed this leak check.  The "C" circuit was checked next.  The detector was changed to the "C" circuit and the circuit was pumped down.  At around 2pm the leak check resumed.

6. The base leak rate on the Varian leak detector was confirmed in the "C" circuit to be stable at 10^-9 atm cc / sec and the pressure was 10^-4 Torr.

7. The solder joint area on the "C" circuit was sprayed with an 8-second burst of helium - no response.

8. The joint between the two halves of the water blocks was sprayed with a 6-second helium burst - no response.

It was concluded that the "C" circuit had passed this leak check.

The electrical continuity of the "C" and "D" circuits were confirmed in the Target Hall at the service cap, and in the module at the Hot Cell, to double check that the correct lines has been pumped and leak checked - this was OK.

The ionizer tube heater lines appear to be leak tight at the Hot Cell.

 

 

 

 

Attachment 1: ITA6021_Rev_14_screencapture_cooling_lines_24July2014.jpg
ITA6021_Rev_14_screencapture_cooling_lines_24July2014.jpg
Attachment 2: TM2_hot_cell_leak_check_tube_heater_C_D_24July2014_small2.jpg
TM2_hot_cell_leak_check_tube_heater_C_D_24July2014_small2.jpg
Attachment 3: TM2_hot_cell_leak_check_no_source_tray_24july2014.JPG
TM2_hot_cell_leak_check_no_source_tray_24july2014.JPG
  715   Monday, July 28, 2014, 09:29 Travis CaveConditioning StationStandard OperationTM2no targetmodule move

TM#2 has been moved from the south hot cell to the conditioning station.

  716   Monday, July 28, 2014, 14:37 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D)and -(C)water lines.
  • TM2 installed in Conditioning Station
  • Varian Leak detector connected directly to Target Module 2 Service cap.
  • Vacuum draw in Target Station with both module turbo pumps
  • Leak detector baseline normal (10^-4 Torr, 10^-9 Std cc/s He)
  • Since no Source tray is installed, and tube heater supply conductor is blanked off in target enclosure, it was necessary to test both supply and return points.
  • For each line tested, 80 psi He was connected, and waited ~2 min to for a response on the leak detector.
  • Lines tested:
    • conductor D (tube heater), Supply -> no He response
    • conductor D (tube heater), Return -> no He response
    • conductor C (tube heater), Supply -> no He response
    • conductor C (tube heater), Return -> no He response
  • Based on this leak testing, both supply and return lines of conductors C & D are leak tight under 95 psi He (80 psig He supply to vacuum)

 

Attachment 1: 011.JPG
011.JPG
Attachment 2: 012.JPG
012.JPG
Attachment 3: 013.JPG
013.JPG
Attachment 4: 014.JPG
014.JPG
Attachment 5: 015.JPG
015.JPG
Attachment 6: 017.JPG
017.JPG
Attachment 7: 018.JPG
018.JPG
  717   Monday, July 28, 2014, 14:45 David WangConditioning StationDevelopmentTM2 turned off TM2 and CS turbo pumps.

I turned off TM2 and CS turbo-pumps. TM2 will be moved from CS to silo tomorrow morning.

  803   Friday, November 28, 2014, 13:06 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule move

TM#2 with no target or source tray has been moved from the north east silo to the south hot cell.

  805   Monday, December 01, 2014, 14:06 chad fisherSouth Hot-CellRepairTM2 TM2 REFURB. WATER LOOP TEST

Some issues with the turntable and having to wait for a decision on whether to remove TM2 from the hot cell so that TM4 with dead UCx target could be put in this morning.

Progress on TM2:

  • Containment box has been removed from TM2.
  • Water block jig has been installed.
  • Existing blank off has been removed.
  • Sealing surfaces have been inspected.
  • First stage of sealing surface cleaning has been performed.

Tomorrow:

  • Polish of sealing surfaces.
  • Installation of loop.
  • Vacuum/helium leak check of loop.

TM2_20141201_03 - sealing surfaces before cleaning...kind of dirty

TM2_20141201_05AC - sealing surfaces after cleaning...looks good!

Attachment 1: TM2_20141201_01.JPG
TM2_20141201_01.JPG
Attachment 2: TM2_20141201_02.JPG
TM2_20141201_02.JPG
Attachment 3: TM2_20141201_03.JPG
TM2_20141201_03.JPG
Attachment 4: TM2_20141201_04.JPG
TM2_20141201_04.JPG
Attachment 5: TM2_20141201_05AC.jpg
TM2_20141201_05AC.jpg
  807   Tuesday, December 02, 2014, 10:15 chad fisherSouth Hot-CellRepairTM2 TM2 Reburb. Loop Install

Final polish, clean with methanol and clean compressed air.

Loop installed and torqued to 90 in lbs.

Minimum of approximately 1"  between loop and containment box at closest point.

Attachment 1: TM2_20141202_01.jpg
TM2_20141202_01.jpg
Attachment 2: 20141203_142215.jpg
20141203_142215.jpg
Attachment 3: 20141203_143530.jpg
20141203_143530.jpg
  808   Tuesday, December 02, 2014, 13:33 David WangSouth Hot-CellDevelopmentTM2 Leak check on TM2 tube heater +(D) at SHC

Chad and I leak checked TM2 tube heater+(D) circuit at SHC with water bypass loop and new seals installed on the water block. The LD base LR 0.0xE-9 atm.cc/sec,base pressure0.0xE-4 torr. Chad sprayed helium on the leak check area in SHC for 5 seconds. No any response has been found on LD during 1minutes waiting time. The test was repeated again and the result is same. NO LEAK at this stage!  After the TM2 is moved to CS , The D line will be pressured with 80 psi helium for helium pressure leak test before any hot water is circuited through it.  

Attachment 1: 2014-12-02_003.JPG
2014-12-02_003.JPG
Attachment 2: 2014-12-02_001.JPG
2014-12-02_001.JPG
Attachment 3: 2014-12-02_004.JPG
2014-12-02_004.JPG
  809   Thursday, December 04, 2014, 09:49 Travis CaveConditioning StationStandard OperationTM2no targetmodule move

TM#2 has been moved from the south hot cell to the conditioning station.

  810   Thursday, December 04, 2014, 09:54 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical check

Results of electrical check of TM#2 with no source tray and no containment box attached. See PDF for results.

Attachment 1: TM2_elec_check_no_source_traySHC.PDF
TM2_elec_check_no_source_traySHC.PDF
  812   Thursday, December 04, 2014, 16:37 David WangConditioning StationDevelopmentTM2 connected TM2 and CS vacuum system .

I connected TM2 and CS vacuum system. All vacuum pumps on TM2 and CS are started .The pumping down is good so .far

  813   Friday, December 05, 2014, 07:47 David WangConditioning StationDevelopmentTM2 TM2 at CS

The pumping down on TM2 at CS was good overnight. However, the back up line pressure is still too high for LD to get to 0.0-E-9atm.cc/sec . It only could get to 1.2xE-7 atm.cc/sec. It is not enough for a good leak check . I dont want to have any ambiguous situation on this" D" line leak check. So,I am going to reconfigure the leak detector to the spare KF25 pot on the TM2 service cap. All pumps are stopped . The CS and TM2 will be vented soon. After that, a manual valve will be installed on that spare KF25 pot for future helium pressure check at CS. Then, The TM2 and CS will be pumped down again.

  814   Friday, December 05, 2014, 11:58 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D) water lines.

At CS, The leak detector is hooked directly to the TM2 top service cap. The base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4torr. Applied 80 psi helium to TM2 tube heater +(D) line . During 3 minutes applying time , I did  not see any tiny change on LD readings. The line is perfectly vacuum sealed.  See attachment pictures.

Attachment 1: 004.JPG
004.JPG
Attachment 2: 005.JPG
005.JPG
Attachment 3: 003.JPG
003.JPG
Attachment 4: 006.JPG
006.JPG
Attachment 5: 002.JPG
002.JPG
Attachment 6: 007.JPG
007.JPG
  815   Friday, December 05, 2014, 13:46 Anders MjosConditioning StationDevelopmentTM2 Not able to start water system

 TCS:WPV1 does not open when staging is enabled. Multiple attempts have been made, but the valve remains closed.

  816   Friday, December 05, 2014, 15:41 Anders MjosConditioning StationDevelopmentTM2 RGA results

Measurement taken at 14:25. IG2 at ~7.7E-6 T

Attachment 1: 2014-12-05-14-25_TM2.png
2014-12-05-14-25_TM2.png
Attachment 2: 2014-12-05-14-25_TM2.txt
Dec 05, 2014  02:24:20 PM
Residual Gas Analyzer Software 
Software Version, 3.213.008

Analog Scan Setup:

Data Points in Scan, 991 
Units, Torr 
Noise Floor, 2 
CEM Status, OFF 
Points Per AMU, 10
Scan Start Mass, 1, amu 
Scan Stop Mass, 100, amu
Focus Voltage, 90, Volts 
Ion Energy, HIGH 
Electron Energy, 70, eV 
CEM Voltage, 1090, Volts
CEM Gain, 1.05E+003 
Sensitivity Factor, 1.01E-004 
Filament Current, 1.00, mAmps


  1.00,  -2.37E-009, 
  1.10,  -1.01E-009, 
  1.20,   2.41E-007, 
  1.30,   4.15E-007, 
  1.40,   5.81E-008, 
  1.50,   7.25E-008, 
  1.60,   2.27E-007, 
  1.70,   3.21E-007, 
  1.80,   4.11E-007, 
  1.90,   4.28E-007, 
  2.00,   4.25E-007, 
  2.10,   3.71E-007, 
  2.20,   2.93E-007, 
  2.30,   1.50E-007, 
  2.40,   3.59E-008, 
  2.50,   1.46E-008, 
  2.60,   7.89E-009, 
  2.70,   4.71E-009, 
  2.80,   3.12E-009, 
  2.90,   2.24E-009, 
  3.00,   1.52E-009, 
  3.10,   1.05E-009, 
  3.20,   7.24E-010, 
  3.30,   3.94E-010, 
  3.40,   1.21E-010, 
  3.50,   4.73E-011, 
  3.60,  -2.66E-011, 
  3.70,  -6.41E-011, 
  3.80,  -9.17E-011, 
  3.90,  -1.38E-010, 
  4.00,  -7.59E-011, 
  4.10,  -1.99E-010, 
  4.20,  -3.21E-010, 
  4.30,  -2.91E-010, 
  4.40,  -2.63E-010, 
  4.50,  -1.71E-010, 
  4.60,  -5.52E-011, 
  4.70,  -1.60E-010, 
  4.80,  -1.99E-010, 
  4.90,  -2.35E-010, 
  5.00,  -3.20E-010, 
  5.10,  -3.59E-010, 
  5.20,  -2.73E-010, 
  5.30,  -2.03E-010, 
  5.40,  -2.98E-010, 
  5.50,  -2.75E-010, 
  5.60,  -3.27E-010, 
  5.70,  -3.40E-010, 
  5.80,  -3.03E-010, 
  5.90,  -2.27E-010, 
  6.00,  -1.93E-010, 
  6.10,  -1.35E-010, 
  6.20,  -1.47E-010, 
  6.30,  -1.82E-010, 
  6.40,  -2.26E-010, 
  6.50,  -2.62E-010, 
  6.60,  -2.38E-010, 
  6.70,  -2.32E-010, 
  6.80,  -1.77E-010, 
  6.90,  -2.01E-010, 
  7.00,  -2.84E-010, 
  7.10,  -3.27E-010, 
  7.20,  -3.82E-010, 
  7.30,  -3.67E-010, 
  7.40,  -2.50E-010, 
  7.50,  -2.17E-010, 
  7.60,  -2.11E-010, 
  7.70,  -1.24E-010, 
  7.80,  -1.13E-010, 
  7.90,  -1.35E-010, 
  8.00,  -9.66E-011, 
  8.10,  -8.97E-011, 
  8.20,  -1.89E-010, 
  8.30,  -1.24E-010, 
  8.40,  -7.79E-011, 
  8.50,  -4.54E-011, 
  8.60,  -3.94E-012, 
  8.70,   3.55E-011, 
  8.80,   3.65E-011, 
  8.90,   1.97E-012, 
  9.00,  -1.97E-011, 
  9.10,  -5.13E-011, 
  9.20,  -1.09E-010, 
  9.30,  -1.65E-010, 
  9.40,  -1.33E-010, 
  9.50,  -2.24E-010, 
  9.60,  -2.07E-010, 
  9.70,  -2.87E-010, 
  9.80,  -3.25E-010, 
  9.90,  -2.29E-010, 
 10.00,  -2.07E-010, 
 10.10,  -1.94E-010, 
 10.20,  -1.84E-010, 
 10.30,  -6.02E-011, 
 10.40,  -7.30E-011, 
 10.50,  -1.63E-010, 
 10.60,  -1.82E-010, 
 10.70,  -1.42E-010, 
 10.80,  -1.07E-010, 
 10.90,   4.04E-011, 
 11.00,   3.25E-011, 
 11.10,  -2.17E-011, 
 11.20,  -2.27E-011, 
 11.30,  -2.76E-011, 
 11.40,  -7.20E-011, 
 11.50,   3.49E-010, 
 11.60,   1.86E-009, 
 11.70,   3.63E-009, 
 11.80,   5.54E-009, 
 11.90,   7.54E-009, 
 12.00,   8.76E-009, 
 12.10,   8.82E-009, 
 12.20,   7.47E-009, 
 12.30,   4.64E-009, 
 12.40,   2.84E-009, 
 12.50,   1.82E-009, 
 12.60,   1.22E-009, 
 12.70,   9.56E-010, 
 12.80,   9.67E-010, 
 12.90,   8.41E-010, 
 13.00,   8.04E-010, 
 13.10,   7.64E-010, 
 13.20,   5.85E-010, 
 13.30,   4.03E-010, 
 13.40,   2.63E-010, 
 13.50,   4.46E-010, 
 13.60,   1.55E-009, 
 13.70,   2.94E-009, 
 13.80,   4.14E-009, 
 13.90,   5.28E-009, 
 14.00,   6.22E-009, 
 14.10,   6.37E-009, 
 14.20,   5.44E-009, 
 14.30,   3.47E-009, 
 14.40,   2.23E-009, 
 14.50,   1.55E-009, 
 14.60,   1.52E-009, 
 14.70,   1.83E-009, 
 14.80,   2.34E-009, 
 14.90,   2.89E-009, 
 15.00,   3.32E-009, 
 15.10,   3.47E-009, 
 15.20,   3.49E-009, 
 15.30,   3.11E-009, 
 15.40,   4.58E-009, 
 15.50,   2.08E-008, 
 15.60,   9.78E-008, 
 15.70,   1.57E-007, 
 15.80,   1.84E-007, 
 15.90,   1.96E-007, 
 16.00,   1.95E-007, 
 16.10,   1.66E-007, 
 16.20,   1.00E-007, 
 16.30,   4.00E-008, 
 16.40,   6.48E-008, 
 16.50,   5.41E-007, 
 16.60,   1.52E-006, 
 16.70,   1.88E-006, 
 16.80,   2.10E-006, 
 16.90,   2.17E-006, 
 17.00,   2.14E-006, 
 17.10,   1.78E-006, 
 17.20,   7.79E-007, 
 17.30,   1.21E-007, 
 17.40,   3.13E-007, 
 17.50,   2.43E-006, 
 17.60,   6.52E-006, 
 17.70,   8.33E-006, 
 17.80,   9.18E-006, 
 17.90,   9.38E-006, 
 18.00,   9.27E-006, 
 18.10,   7.83E-006, 
 18.20,   2.62E-006, 
 18.30,   7.79E-008, 
 18.40,   2.34E-008, 
 18.50,   1.53E-008, 
 18.60,   2.54E-008, 
 18.70,   4.37E-008, 
 18.80,   5.55E-008, 
 18.90,   6.27E-008, 
 19.00,   6.54E-008, 
 19.10,   6.02E-008, 
 19.20,   4.50E-008, 
 19.30,   1.84E-008, 
 19.40,   9.54E-009, 
 19.50,   6.70E-009, 
 19.60,   8.21E-009, 
 19.70,   1.20E-008, 
 19.80,   1.54E-008, 
 19.90,   1.76E-008, 
 20.00,   1.90E-008, 
 20.10,   1.85E-008, 
 20.20,   1.54E-008, 
 20.30,   8.53E-009, 
 20.40,   4.90E-009, 
 20.50,   3.04E-009, 
 20.60,   1.99E-009, 
 20.70,   1.39E-009, 
 20.80,   9.90E-010, 
 20.90,   6.37E-010, 
 21.00,   3.70E-010, 
 21.10,   1.70E-010, 
 21.20,   3.94E-011, 
 21.30,   1.97E-012, 
 21.40,  -9.47E-011, 
 21.50,  -8.97E-011, 
 21.60,   1.74E-010, 
 21.70,   4.18E-010, 
 21.80,   7.38E-010, 
 21.90,   9.14E-010, 
 22.00,   1.04E-009, 
 22.10,   1.03E-009, 
 22.20,   8.56E-010, 
 22.30,   4.96E-010, 
 22.40,   3.30E-010, 
 22.50,   2.78E-010, 
 22.60,   5.33E-011, 
 22.70,   5.82E-011, 
 22.80,   3.45E-011, 
 22.90,  -1.24E-010, 
 23.00,  -2.11E-010, 
 23.10,  -1.58E-010, 
 23.20,  -2.33E-010, 
 23.30,  -1.80E-010, 
 23.40,  -1.07E-010, 
 23.50,  -8.58E-011, 
 23.60,  -2.54E-010, 
 23.70,  -1.68E-010, 
 23.80,  -1.21E-010, 
 23.90,  -7.30E-011, 
 24.00,  -1.06E-010, 
 24.10,  -5.52E-011, 
 24.20,  -1.38E-010, 
 24.30,  -1.40E-010, 
 24.40,  -1.40E-010, 
 24.50,  -1.32E-010, 
 24.60,  -1.60E-010, 
 24.70,  -1.32E-010, 
 24.80,  -2.17E-011, 
 24.90,   1.75E-010, 
 25.00,   2.11E-010, 
 25.10,   2.06E-010, 
 25.20,   1.76E-010, 
 25.30,   1.42E-010, 
 25.40,   5.52E-011, 
 25.50,   1.47E-010, 
 25.60,   4.97E-010, 
 25.70,   9.56E-010, 
 25.80,   1.31E-009, 
 25.90,   1.66E-009, 
 26.00,   1.84E-009, 
 26.10,   1.81E-009, 
 26.20,   1.58E-009, 
 26.30,   1.07E-009, 
 26.40,   7.45E-010, 
 26.50,   8.75E-010, 
 26.60,   1.50E-009, 
 26.70,   2.43E-009, 
 26.80,   3.37E-009, 
 26.90,   3.81E-009, 
 27.00,   4.16E-009, 
 27.10,   4.41E-009, 
 27.20,   4.14E-009, 
 27.30,   3.86E-009, 
 27.40,   6.14E-009, 
 27.50,   2.63E-008, 
 27.60,   9.66E-008, 
 27.70,   1.62E-007, 
 27.80,   1.87E-007, 
 27.90,   1.75E-007, 
 28.00,   1.67E-007, 
 28.10,   1.51E-007, 
 28.20,   7.14E-008, 
 28.30,   2.16E-008, 
 28.40,   1.11E-008, 
 28.50,   7.74E-009, 
 28.60,   8.19E-009, 
 28.70,   1.00E-008, 
... 714 more lines ...
  817   Monday, December 08, 2014, 13:52 Anders MjosConditioning StationDevelopmentTM2 Fixed - Not able to start water system

Anders Mjos wrote:

 TCS:WPV1 does not open when staging is enabled. Multiple attempts have been made, but the valve remains closed.

 Dave Morris looked at the PLC controls and found that the code was not writing to the output after the PLC migration. He corrected it.