Entry  Friday, March 23, 2018, 09:34, Travis Cave, Spent Target Vault, Standard Operation, , Many, Spent Target Assay Target_Index_2018-03-23.pdf
 All targets in the ISAC Spent Target Vault have been either assayed and had field measurement done on them or just measurement if to hot to assay.
Entry  Thursday, March 08, 2018, 14:10, David Wang, ITW, Maintenance, , , Two small water leak has been found in ITW.  
Two small water leaks have been found on ITW High active water system.  One is from an unused 1/4" copper valve stem. another is on supply 1.5"
 supply line valve body top sealing. Both of them are seeping water from  seal. 1/4" copper valve will be replaced with a new one. 1.5" supply
 line valve will be replaced by an old valve with all new seals. I have  all spare parts in hand.  At present, water supply to ITW are stooped to
Entry  Wednesday, March 07, 2018, 10:36, David Wang, ITE/ITW Cooling, Development, , , HALCW resin can flow meter replacment 
HALCW resin can flow meter replacement is done. Less that 100 mL water was drained to a small tray during the job. RPG checked the water. Less than 20
counts. Water are dumped the high active sump.   The HALCW MP1 is started. No leak on new gauges and fittings. Old gauge is labeled , bagged,
and stored in TH.
Entry  Wednesday, March 07, 2018, 10:18, David Wang, ITW, Standard Operation, , , Oil leak on target station vacuum primary back pump. 
I can not see oil in sight window of the primary pump during visual inspection. The aluminum tray underneath the pump is filled with oil. The performance
on this pump start to drop by watching ITH CG4 reading. A fault report with suggestion is issued to vacuum group.  Everything on secondary pump looks
fine.
Entry  Tuesday, March 06, 2018, 09:53, David Wang, ITW, Standard Operation, TM2, , Tm2 and Tm4 vacuum disconnection TM2_TM4_disconnection_Vacuum.pdf
The job is done. See attachment.
Entry  Monday, March 05, 2018, 13:47, Travis Cave, Spent Target Vault, Repair, , Many, Spent Target Assay 
 The spent target assay was aborted today after the first target was finished due to the very old computer that controls the camera and the vault
door effectively died. The vault door had to be closed using the emergency door closing winch which worked so it passed that test.
Entry  Wednesday, February 28, 2018, 14:47, David Wang, ITE, Standard Operation, , , leak check ITE primary and secondary vacuum vessel. 
2018-02-27: Anders and I finished leak check on ITE primary and second vacuum vessel seals. LD connected to ITE BV2 valves between. LD, Base Leak rate
1.2 xE-9atm.cc/sec, base pressure 0.0XE-4torr. There is a leak has been found on TM4 service cap KF25 blank off. The o-ring on the blank off will be changed
later. It is an easy fix . Other seals are good. The big T tank seal on secondary vessel is leak checked as well. It is still fine.  Helium pressure
Entry  Friday, February 16, 2018, 13:46, Anders Mjos, ITW, Maintenance, TM2, , Parker coupling inspection Used_Parker_FS251_Inspection.pdf
Findings and photos from the inspections attached. The inspection was conducted by Anders, David and Maico.
Entry  Wednesday, February 14, 2018, 10:06, Anders Mjos, ITW, Maintenance, TM2, , Replaced parker couplings on Window cooling line 
By Anders & David. Couplings will be taken apart for inspection.
Entry  Tuesday, February 13, 2018, 13:56, Anders Mjos, ITW, Standard Operation, TM2, Ta#55, Target module disconnected 
TM disconnected by David and Yasmine Feb 8th. One of the water couplings were leaking for a short while when disconnected. NCR 10836 submitted by Max
Entry  Tuesday, February 13, 2018, 13:54, Anders Mjos, ITE, Standard Operation, TM4, SiC#37, Target module disconnected 
TM disconnected by David and Yasmine Feb 8th
Entry  Wednesday, January 31, 2018, 10:32, David Wang, Crane, Standard Operation, , , Target Hall crane annual inspection. 
Gordon crane technician Tom finished annual TH crane inspection today. Everything is normal. The main hoist brake gaps are checked on both side. They
are good still.
Entry  Monday, January 29, 2018, 06:51, David Wang, Conditioning Station, Maintenance, TM1, , TCS and TM1 vacuum pumps switched off 
TCS and Tm1 vacuum pumps are switched off this morning. TM1 TP1and TP2 work fine during this test period. Tm1 will be moved back to silo this morning.
TM1 IG1 stopped work during the test period. It could be broken. We will only replace this gauge if TM1 is used in ITW again.
Entry  Wednesday, January 24, 2018, 13:30, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 has been moved to TCS this morning 
Tm1 has been moved to TCS this morning. All turbo-pumps are started successfully at TCS and TM1.
Entry  Monday, January 22, 2018, 07:47, David Wang, Conditioning Station, Standard Operation, TM3, , Restarted TM3 vacuum sysytem after site power bump 
All TCS and TM3  vacuum pumps are started successfully.
Entry  Wednesday, January 17, 2018, 13:54, David Wang, Conditioning Station, Standard Operation, TM3, , Start TM3 turbo pumps at TCS.  
TM3 turbo-pumps are started at TCS. We will keep pumps running until next Wednesday.
Entry  Wednesday, January 17, 2018, 10:38, Anders Mjos, Spent Target Vault, Standard Operation, TM1, , Old TM1 Source Tray moved to Cyclotron basement 
The old TM1 Source Tray from 2011 has been moved to Cyclotron basement  this morning. Source tray was stored in location 10. The box was moved  from
the vault to the ante-room yesterday. No contamination was found on  the box. Photos
Entry  Wednesday, January 17, 2018, 06:51, David Wang, Conditioning Station, Standard Operation, , , Stop TCS vacuum pumps  
I stopped TCS vacuum pumps for coming TM3 move.
Entry  Tuesday, January 16, 2018, 10:36, Anders Mjos, Spent Target Vault, Standard Operation, TM2, , Old TM2 Source Tray moved to Cyclotron basement 
The old TM2 Source Tray from 2009 has been moved to Cyclotron basement this morning. Source tray was stored in location 9. The box was moved from the
vault to the ante-room yesterday. No contamination was found on the box.
Entry  Tuesday, January 16, 2018, 06:50, David Wang, ITE/ITW Cooling, Standard Operation, , , Field measurement on old resin tank in silo 
The old resin tank has been stored in silo since last year March.  Without crane the tank up, We use the pole monitor measured the field around
the bottom of the tank in silo. The average contact field on the bottom is about 4.0msv/hr. @0.5meter , the field is about  900usv/hr. It is still
too hot to remove it.