Entry  Wednesday, September 27, 2017, 09:02, Travis Cave, Conditioning Station, Standard Operation, TM2, Ta#54, Module move 
 TM#2 with Ta#54 has been moved from the south hot cell to the conditioning station.
Entry  Wednesday, September 27, 2017, 08:00, chad fisher, South Hot-Cell, Standard Operation, TM2, Ta#54, Ta#54 installed 
Containment box has been replaced onto TM2, interior of containment box vacuumed, and Ta#54 installed with new fasteners (high current torqued to 130
in lbs).
Entry  Tuesday, September 26, 2017, 14:27, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#54, Electrical Check TM2_Ta54_elec_chk_SHC.PDF
Electrical check of TM#2 with Ta#54 at the south hot cell. See attached PDF for details.
Entry  Friday, September 22, 2017, 14:15, chad fisher, South Hot-Cell, Repair, TM2, , TM2 containment box off 20170922_140546.jpg20170922_140927.jpg
TM2 containment box has been removed. Found a piece of capton tape or tubing under table (see picture).
Entry  Friday, September 22, 2017, 12:13, David Wang, South Hot-Cell, Maintenance, TM2, , TM2 service cap inside inspection. TM2_serica_cap_inspection_002.JPGTM2_serica_cap_inspection_003.JPGTM2_serica_cap_inspection_004.JPGTM2_serica_cap_inspection_005.JPGTM2_serica_cap_inspection_008.JPG
Two side panels on TM2 service cap were removed for TM2 service cap inside inspection. A piece of cable tie was found inside cap closing to service tray
entrance area. All blue nylon insulators are inspected. They look good. The broken cable tie is moved out of service cap.
 Panels are installed back after the inspection.
Entry  Friday, September 22, 2017, 11:00, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check TM2_notgt_elec_chk_shc_09212017.PDF
Electrical check of TM#2 after the insulator change on thursday september 21.
Entry  Thursday, September 21, 2017, 16:26, Anders Mjos, South Hot-Cell, Standard Operation, TM2, , Inspection of Source Tray TM2_Source_Tray_EE_Insulator.pdf
Chad and Anders inspected the Source Tray today using the camera in the hot cell. A dark spot was observed on one of the four insulators separating the
Extraction Electrode from the Ground Electrode. This could potentially influence the high leakage current. Some discolored areas were also observed in
the Service Tray, but these was present when the module was built. See attachment for details.
Entry  Thursday, September 21, 2017, 12:07, chad fisher, South Hot-Cell, Repair, TM2, , Insulator Replacement 
Insulators ITD0053 and 54 have been replaced. All fasteners torqued to 56 in lbs.
 
Entry  Thursday, September 21, 2017, 10:48, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#53, Electrical Check TM2_Ta53_elec_chk_shc.PDFTM2_Ta53_elec_chk_post_beam_shc.PDFTM2_notgt_elec_chk_shc_09202017.PDF
Electrical checks of TM#2 with Ta#53 and also with out a target.
Entry  Wednesday, September 20, 2017, 13:38, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Insulator replacement 20170920_132813.jpg20170920_132820.jpg20170920_133244.jpg
Broken insulators ITD0053 and ITD0054 have been uninstalled from TM2.
Entry  Tuesday, September 19, 2017, 13:53, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#53, Module move 
 TM#2 with Ta#53 has been moved from the west target station to the south hot cell.
Entry  Tuesday, September 19, 2017, 10:40, chad fisher, South Hot-Cell, Maintenance, , , South East Manipulator Maintenence 
Entered hot cell to preform replacement of slave tong cable. Existing cable shows no signs of wear so it has been re-installed. A spare tong cable has
been loaded into a spare tong while in the hot cell in preparation for next time this cable needs to be replaced.
Entry  Friday, September 15, 2017, 14:12, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 
 TM#3 has been moved back to the silo from the conditioning station.
Entry  Wednesday, September 13, 2017, 16:13, David Wang, Conditioning Station, Repair, TM3, , TCS turbo pumps are started.  
TCS and TM3 all vacuum pumps are started. Everything is fine.
Entry  Wednesday, September 13, 2017, 16:05, David Wang, Conditioning Station, Repair, TM3, , remove Tm3 service tray cover plate 
TM3 service tray cover plate has been removed. It is bagged and placed to TH b2 level south wall beside the silo.
Entry  Wednesday, September 13, 2017, 10:05, David Wang, Conditioning Station, Repair, TM3, , Switch off TCS water system and vacuums 
Preparing vent the TCS/TM3. We will remove TM3 service tray cover plate  after venting.
Entry  Friday, September 08, 2017, 14:08, David Wang, Conditioning Station, Repair, TM3, , TCS and TM3  
TM3 is located at TCS and it is pumping down now. TCS water system has been started.  All TCS water lines for TM3 module internal cooling are bypassed
and looped at TCS top ground plate. Water only supply to TCS high  current conductors.
Entry  Friday, September 08, 2017, 11:20, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 
 TM#3 has been moved from the north east silo to the conditioning station.
Entry  Tuesday, September 05, 2017, 10:25, Travis Cave, ITE, Standard Operation, TM4, UC#21, Module move 
 TM#4 with UC#21 has been moved from the conditioning station to the east target station.
Entry  Tuesday, September 05, 2017, 06:33, David Wang, Conditioning Station, Standard Operation, TM4, , Turned off TCS water system and vacuum system. 
Argon vent and disconnect TM4 at TCS.