Entry  Friday, November 28, 2014, 13:06, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, module move 
Entry  Monday, December 01, 2014, 14:06, chad fisher, South Hot-Cell, Repair, TM2, , TM2 REFURB. WATER LOOP TEST TM2_20141201_01.JPGTM2_20141201_02.JPGTM2_20141201_03.JPGTM2_20141201_04.JPGTM2_20141201_05AC.jpg
Entry  Tuesday, December 02, 2014, 10:15, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Reburb. Loop Install TM2_20141202_01.jpg20141203_142215.jpg20141203_143530.jpg
Entry  Tuesday, December 02, 2014, 13:33, David Wang, South Hot-Cell, Development, TM2, , Leak check on TM2 tube heater +(D) at SHC 2014-12-02_003.JPG2014-12-02_001.JPG2014-12-02_004.JPG
Entry  Thursday, December 04, 2014, 09:49, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, module move 
Entry  Thursday, December 04, 2014, 09:54, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical check TM2_elec_check_no_source_traySHC.PDF
Entry  Thursday, December 04, 2014, 16:37, David Wang, Conditioning Station, Development, TM2, , connected TM2 and CS vacuum system . 
Entry  Friday, December 05, 2014, 07:47, David Wang, Conditioning Station, Development, TM2, , TM2 at CS 
Entry  Friday, December 05, 2014, 11:58, David Wang, Conditioning Station, Development, TM2, , helium pressure test on TM2 tube heater +(D) water lines. 6x
Entry  Friday, December 05, 2014, 13:46, Anders Mjos, Conditioning Station, Development, TM2, , Not able to start water system 
Entry  Friday, December 05, 2014, 15:41, Anders Mjos, Conditioning Station, Development, TM2, , RGA results 2014-12-05-14-25_TM2.png2014-12-05-14-25_TM2.txt
   +  Reply  Monday, December 08, 2014, 13:52, Anders Mjos, Conditioning Station, Development, TM2, , Fixed - Not able to start water system 
Entry  Monday, December 08, 2014, 15:22, Anders Mjos, Conditioning Station, Development, TM2, , Circuit D water test TCS_Heater_Transmission_Power.xlsxCircuit_D_test_results_for_TM2_status_meeting_2014-12-11.pdfHeated_water_leak_test_plan.pdfHeated_water_leak_test_Circuit_D_RESULTS.docx
Entry  Monday, December 15, 2014, 08:50, Anders Mjos, Conditioning Station, Maintenance, TM2, , TK2 level below 15 in (secondary loop) 
   +  Reply  Monday, December 15, 2014, 09:41, Anders Mjos, Conditioning Station, Maintenance, TM2, , Water leak found at the isolation transforer 
   +  Reply  Monday, December 15, 2014, 12:53, Anders Mjos, Conditioning Station, Maintenance, TM2, , TCSTK2 topped up 
   +  Reply  Monday, December 15, 2014, 13:25, Anders Mjos, Conditioning Station, Maintenance, TM2, , BIASSW1 temperature and flow removed from interlock chain 
Entry  Tuesday, December 23, 2014, 14:10, Anders Mjos, Conditioning Station, Development, TM2, , He leak check of the Service Cap using RGA 
Entry  Monday, January 05, 2015, 12:47, Anders Mjos, Conditioning Station, Development, TM2, , Cooling package started 
Entry  Monday, January 05, 2015, 15:01, Anders Mjos, Conditioning Station, Development, TM2, , RGA switched on 