1653
|
Thursday, October 26, 2017, 13:20 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41 | Targets moved to mini storage | SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41 have
been moved from the spent target storage
to the mini storage. See attached PDF for |
|
1652
|
Thursday, October 26, 2017, 09:56 |
Anders Mjos | ITE | Repair | TM4 | SiC#37 | Leak on multi pin connector feedthrough | On maintenance day Tuesday, the roughing
of the target station could not go below
1.5 Torr. A brief troubleshooting on Tuesday |
|
1651
|
Tuesday, October 24, 2017, 11:58 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#37 | Module move | TM#4 with SiC#37 has been moved from
the conditioning station to the east target
station. A measurement was taken on TM#4 |
|
1650
|
Monday, October 23, 2017, 13:38 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#21 | Spent Target move | The spent UC#21 has been moved from the
south hot cell to the spent target vault.
See attached for details |
|
1649
|
Thursday, October 19, 2017, 14:20 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | SiC#37 | SiC#37 Conditioning | Thursday, October 19, 2017, 14:20: EE configured
for conditioning. HV cage locked up
Thursday, October 19, 2017, 16:46: |
|
1648
|
Thursday, October 19, 2017, 14:20 |
Anders Mjos | Assembly/Bench Test | Standard Operation | | | Source tray inspection | Two minor chips in the main 60 kV
insulators on the source tray was inspected
today by Anders, Tom and Aurelia. The chips |
|
1647
|
Thursday, October 19, 2017, 10:11 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Leak check on TM4 HS line at SHC and TCS. | Chad and I leak checked TM4 HS line after
new target is installed yesterday. No leak
has been found. Also, I helium pressurized |
|
1646
|
Wednesday, October 18, 2017, 14:54 |
Anders Mjos | Assembly/Bench Test | Standard Operation | | | Source tray assembly electrical check | Source tray meggered today by Anders and
Keith
GND - MSP OL @ 1000V |
|
1645
|
Wednesday, October 18, 2017, 10:46 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#37 | Module move | TM#4 with SiC#37 has been moved from
the south hot cell to the conditioning station. |
|
1644
|
Wednesday, October 18, 2017, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#37 | Electrical Check | The results of the electrical check
of TM#4 with SiC#37, see attached PDF. |
|
1643
|
Tuesday, October 17, 2017, 10:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#21 | Module move | TM#4 with UC#21 has been moved from
the east target station to the south hot
cell. |
|
1642
|
Friday, October 13, 2017, 11:14 |
Keith C Ng | Assembly/Bench Test | Standard Operation | | | source tray alignment/build | Source tray is complete for brazing, gas
line bracket is currently missing but can
be made in parallel with tube bending operations. |
|
1641
|
Thursday, October 12, 2017, 08:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | Field measurements of the old source trays | Field measurements were taken of
the old source trays. The old TM#2 source
tray had a minimum field value of 0.50 mSv/hr |
|
1640
|
Wednesday, October 11, 2017, 15:50 |
Keith C Ng | Assembly/Bench Test | Standard Operation | | | spare source tray build alignment |
Spare |
|
1639
|
Tuesday, October 10, 2017, 10:45 |
David Wang | Conditioning Station | Repair | | | Re-route TCS water lines. | TCS cooling polyurethane lines have
been re-routed to solve to HV sparking issue
on old configuration between lines and bais |
8x |
1638
|
Tuesday, October 10, 2017, 10:38 |
David Wang | ITW | Standard Operation | | | 5 shielding blocks have been transferred from ITE to ITW . | ITW is configured to take proton beam. |
|
1637
|
Friday, October 06, 2017, 13:25 |
Anders Mjos | Conditioning Station | Repair | | | HV Test | HV was brought up to 70 kV for 1
h without sparks to test the new water installation. |
|
1636
|
Friday, October 06, 2017, 11:21 |
Isaac Earle | North Hot-Cell | Development | | | ISAC-1 active sump drain pipe modified | The 4" PVC drain line in the ISAC-1
active sump was modified so that the drain
pipe terminates below the low level water |
|
1635
|
Friday, October 06, 2017, 11:12 |
Isaac Earle | North Hot-Cell | Development | | | NHC module port shield block and TCS vessel shield block installed | The NHC module port shield block
(IRH1645) and the TCS vessel shield block
(IRH1646) were installed yesterday in the |
|
1634
|
Thursday, October 05, 2017, 11:04 |
Anders Mjos | ITW | Maintenance | | | Installation of new valve for module move ventilation | David installed the new ball valve and
connections for the SAS project module move
ventilation. SASP0482. Drawing reference |
|