  1653   Thursday, October 26, 2017, 13:20 Travis CaveSpent Target VaultStandard Operation SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41Targets moved to mini storageSiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41 have
been moved from the spent target storage
to the mini storage. See attached PDF for
 Mini_Vault_Storage_October_26_2017.pdf 
  1652   Thursday, October 26, 2017, 09:56 Anders MjosITERepairTM4SiC#37Leak on multi pin connector feedthroughOn maintenance day Tuesday, the roughing
of the target station could not go below
1.5 Torr. A brief troubleshooting on Tuesday
  
  1651   Tuesday, October 24, 2017, 11:58 Travis CaveITEStandard OperationTM4SiC#37Module move TM#4 with SiC#37 has been moved from
the conditioning station to the east target
station. A measurement was taken on TM#4
  
  1650   Monday, October 23, 2017, 13:38 Travis CaveSpent Target VaultStandard Operation UC#21Spent Target moveThe spent UC#21 has been moved from the
south hot cell to the spent target vault.
See attached for details
 Vault_Storage_October_23_2017.pdf 
  1649   Thursday, October 19, 2017, 14:20 Anders MjosConditioning StationStandard OperationTM4SiC#37SiC#37 ConditioningThursday, October 19, 2017, 14:20: EE configured
for conditioning. HV cage locked up
Thursday, October 19, 2017, 16:46:
 SiC#37_BIAS_current_vs_voltage.xlsxSiC#37.docx 
  1648   Thursday, October 19, 2017, 14:20 Anders MjosAssembly/Bench TestStandard Operation  Source tray inspection Two minor chips in the main 60 kV
insulators on the source tray was inspected
today by Anders, Tom and Aurelia. The chips
 Left_Insulator.jpgRight_Insulator.jpg 
  1647   Thursday, October 19, 2017, 10:11 David WangConditioning StationStandard OperationTM4 Leak check on TM4 HS line at SHC and TCS.Chad and I leak checked TM4 HS line after
new target is installed yesterday. No leak
has been found. Also, I helium pressurized
  
  1646   Wednesday, October 18, 2017, 14:54 Anders MjosAssembly/Bench TestStandard Operation  Source tray assembly electrical checkSource tray meggered today by Anders and
Keith
GND - MSP OL @ 1000V
 Steerer_Connections_2017-10-18.pdf 
  1645   Wednesday, October 18, 2017, 10:46 Travis CaveConditioning StationStandard OperationTM4SiC#37Module move TM#4 with SiC#37 has been moved from
the south hot cell to the conditioning station.
  
  1644   Wednesday, October 18, 2017, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check The results of the electrical check
of TM#4 with SiC#37, see attached PDF.
 TM4_SIC37_elec_chk_SHC.pdf 
  1643   Tuesday, October 17, 2017, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#21Module move TM#4 with UC#21 has been moved from
the east target station to the south hot
cell.
  
  1642   Friday, October 13, 2017, 11:14 Keith C NgAssembly/Bench TestStandard Operation  source tray alignment/buildSource tray is complete for brazing, gas
line bracket is currently missing but can
be made in parallel with tube bending operations.
 20171013_sourcetray_P1030815.JPG20171013_sourcetray_P1030816.JPG20171013_sourcetray_P1030817.JPG20171013_sourcetray_P1030818.JPG 
  1641   Thursday, October 12, 2017, 08:48 Travis CaveSpent Target VaultStandard Operation  Field measurements of the old source trays Field measurements were taken of
the old source trays. The old TM#2 source
tray had a minimum field value of 0.50 mSv/hr
  
  1640   Wednesday, October 11, 2017, 15:50 Keith C NgAssembly/Bench TestStandard Operation  spare source tray build alignment 
 
Spare
  
  1639   Tuesday, October 10, 2017, 10:45 David WangConditioning StationRepair  Re-route TCS water lines.TCS  cooling polyurethane lines have
been re-routed to solve to HV sparking issue
on old configuration between lines and bais
 8x 
  1638   Tuesday, October 10, 2017, 10:38 David WangITWStandard Operation   5 shielding blocks have been transferred from ITE to ITW .ITW is configured to take proton beam.   
  1637   Friday, October 06, 2017, 13:25 Anders MjosConditioning StationRepair  HV Test HV was brought up to 70 kV for 1
h without sparks to test the new water installation.
 2017-10-06_HV_Water_Line_Test.xlsx 
  1636   Friday, October 06, 2017, 11:21 Isaac EarleNorth Hot-CellDevelopment  ISAC-1 active sump drain pipe modifiedThe 4" PVC drain line in the ISAC-1
active sump was modified so that the drain
pipe terminates below the low level water
 IMG_0513.jpgIMG_0516.jpgIMG_0517.jpg 
  1635   Friday, October 06, 2017, 11:12 Isaac EarleNorth Hot-CellDevelopment  NHC module port shield block and TCS vessel shield block installed The NHC module port shield block
(IRH1645) and the TCS vessel shield block
(IRH1646) were installed yesterday in the
 IMG_0472.jpgIMG_0476.jpgIMG_0479.jpgIMG_0481.jpgIMG_0486.jpg 
  1634   Thursday, October 05, 2017, 11:04 Anders MjosITWMaintenance  Installation of new valve for module move ventilationDavid installed the new ball valve and
connections for the SAS project module move
ventilation. SASP0482. Drawing reference
  