  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  2342   Thursday, June 30, 2022, 14:28 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Electrical  
An annual electrical
  
  2343   Monday, July 04, 2022, 11:44 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Mechanical  
An
 SMP_Missing_Washers_1.jpgSMP_Missing_Washers_2.jpgSMP_Missing_shims.jpg 
  2403   Tuesday, January 10, 2023, 10:15 Frank SongSafe Module ParkingStandard OperationTM2UCx40 removedTM2 electrical check with no target attached on SW silo TM2 with no target on SW silo be
electrical checked right after module moving.
 TM2_electrical_check_without_UCx40_on_SW_silo.png 
  2438   Thursday, May 04, 2023, 07:14 David WangSafe Module ParkingStandard OperationTM4  SMP vacuum pumpimg down is stopped. SMP  vacuum pumping down is stopped.
SMP and TM4 venting to atmosphere will be
started soon. 
  
  2462   Wednesday, June 21, 2023, 14:39 Adam NewsomeSafe Module ParkingMaintenance  Annual electrical and mechanical inspection of Safe Module ParkingAn annual electrical and mechanical inspection
was performed on the  SMP today by Adam Newsome,
Travis Cave, Eric Lahe, Maico Dalla Valle,
 PXL_20230621_210144119.MP.jpgPXL_20230621_210546559.jpgPXL_20230621_210146892.jpg 
  2534   Friday, January 26, 2024, 11:53 David WangSafe Module ParkingStandard OperationTM4 Tm4 has been moved to SMP.TM4 has been moved to SMP. The move is
smooth. I started SMP vacuum pump. The TM4
and SMP vessel is under vacuum now. 
  
  2535   Friday, January 26, 2024, 11:57 David WangSafe Module ParkingStandard OperationTM4 TM4 coil1, 2, and HS electrical check at SMP after module moving.TM4 coil1, 2 and HS are all OL at 250V
at SMP after module move. This week, Chad
and Carl fixed short issue on coil1, 2 and
  
  2637   Wednesday, July 10, 2024, 09:55 Adam NewsomeSafe Module ParkingMaintenance   Annual electrical and mechanical inspection of Safe Module Parking An annual electrical and mechanical inspection
was performed on the   SMP today by Adam
Newsome, Travis Cave, Riley Sykes, Maico
 PXL_20240710_160636341.jpgPXL_20240710_160506424.jpg 
  2639   Friday, July 12, 2024, 08:51 Riley SykesSafe Module ParkingMaintenance  SMP chain guard SS washers were added to all slotted
holes on SMP chainguard cover plate
  
  2745   Thursday, January 09, 2025, 11:46 David WangSafe Module ParkingStandard OperationTM4No targetSMP is under vacuum for TM4 storage during shut down.  SMP:MP1 is started with SMP BV1 is
opened. SMP is under vacuum for TM4 storage
during shut down.
  
  2737   Wednesday, December 18, 2024, 14:17 Adam NewsomePail Handling ToolMaintenance  Pail Handling Tool - InspectionAn informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main
 ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf 
  1221   Wednesday, May 04, 2016, 11:14 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Scope DecisionA meeting was held on May 4, 2016 to determine
the scope of the North Hot Cell project.
 The following was agreed upon by those
  
  1294   Friday, July 29, 2016, 14:27 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Measurements & Cleanup The North
Hot Cell was accessed today via the Ante
  
  1307   Friday, August 05, 2016, 14:13 Isaac EarleNorth Hot-CellDevelopment  Preparations for NHC Ventilation TestA hole was drilled in the NHC exhaust duct
in the east end of the target hall above
the hatch to the Ante Room.  This will
  
  1315   Wednesday, August 10, 2016, 14:38 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Ventilation Test ResultsTesting was performed on August 9th on
the ISAC nuclear ventilation system to determine
if the existing ventilation system can achieve
  
  1345   Wednesday, September 07, 2016, 11:39 Isaac EarleNorth Hot-CellDevelopment  NHC North / South Wall Gap Measurements Measurements were taken today of
the NHC north/south wall gap at the location
where the NHC/TCS partition wall will be
  
  1353   Thursday, September 15, 2016, 11:05 Isaac EarleNorth Hot-CellDevelopment  NHC / SHC feedthrough panel removedThe sheet metal panel covering the NHC/SHC
feedthrough port was removed today using
a slide-hammer to pull out the concrete anchors
 original_panel.JPGpanel_removed.JPGtemp_panel.JPG 
  1395   Tuesday, November 08, 2016, 14:04 Isaac EarleNorth Hot-CellDevelopment  Interference check with TCS turbo pump and proposed NHC duct routingDavid Wang and I accessed the NHC today
to check if the proposed duct routing (IRH1618)
will interfere with servicing or replacement
 IMG_7577.JPGIMG_7583.JPGIMG_7582.JPG 
  1416   Friday, December 09, 2016, 14:58 Isaac EarleNorth Hot-CellDevelopment  NHC service area floor and top of roof block painted The concrete floor in the North Hot
Cell service area and the top of the NHC
roof block in the target hall have been painted
 NHC_SA_before_and_after.jpgNHC_roof_before_and_after.jpg 
  1421   Tuesday, January 17, 2017, 13:45 Isaac EarleNorth Hot-CellDevelopment  NHC ducting installed The new ducting section connecting
the existing duct termination in the TCS
space to the NHC partition wall has been
 IMG_7688.JPGIMG_7716.JPGIMG_7723.JPGIMG_7721.JPG 